You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Small Scale Fuel Cells for Ground Personnel

    SBC: ADAPTIVE MATERIALS, INC.            Topic: N/A

    "Adaptive Materials Inc. will explore the feasibility of small scale power generation using microtubule solid oxide fuel cells as outlined in Topic Area 3; Materials and Processes for Electrochemical Energy Conversion. We believe microtubule solid oxidefuel cells are the key to a soldier portable, rapid starting, field-rugged, compact, and light weight power source. Individual cells demonstrating ...

    SBIR Phase I 2002 Department of DefenseOffice of the Secretary of Defense
  2. Non-Invasive, Continuous, Transdermal Glucose Monitor w/Actuator Control

    SBC: ADVANCED SENSOR TECHNOLOGIES, INC.            Topic: N/A

    "AST proposes to develop a non-invasive methodology able to continuously monitor blood glucose concentration. As opposed to employing near infrared spectroscopy, which suffers from the limitations of sensitivity, stability, and repeatability, AST intendsto employ direct measurement of glucose, via amperometric sensors coated with glucose oxidase membranes, from minute amounts of interstitial flui ...

    SBIR Phase I 2002 Department of DefenseOffice of the Secretary of Defense
  3. Novel Routes of Drug Administration to Enhance Compliance in Soldiers

    SBC: ADVANCED SENSOR TECHNOLOGIES, INC.            Topic: A04201

    WHO estimates that between 300 and 500 million new cases of malaria occur each year and annual deaths from the disease number between 2 and 3 million. Although there are several compounds known to be effective for treating malaria, including quinine, doxycycline, primaquine, azithromycin, and erythromycin, side effects associated with the oral administration of these drugs results in incomplete m ...

    SBIR Phase I 2005 Department of DefenseArmy
  4. Development and flight test demonstration of an innovative practical Autonomous Formation Flying System (AFFS) for manned rotorcraft.

    SBC: Aerotonomy, Incorporated            Topic: A05T011

    Aerotonomy, Incorporated and our Research Institution partner the Georgia Institute of Technology (GIT) will combine an innovative adaptive guidance system, the latest knowledge in autonomous adaptive rotorcraft control, and intuitive pilot interface techniques to arrive at a safe, practical, Autonomous Formation Flying System (AFFS) for manned rotorcraft. This Phase I project will culminate in a ...

    STTR Phase I 2005 Department of DefenseArmy
  5. Use of Crew Intent Inferencing to Augment Control of Multiple Unmanned Aerial Vehicles

    SBC: Veloxiti, Inc.            Topic: N/A

    "ASI's technology provides distributed, cognitive decision aiding to increase operational effectiveness at reduced manning and skill levels. This framework enables single-operator / multi-vehicle control; real-time situational awareness, and collaborationbetween manned and unmanned vehicles whether they operate in the air, on the surface, underwater or in space. For this project, ASI's technology ...

    SBIR Phase I 2002 Department of DefenseArmy
  6. Opposed Piston Engine Power Density Improvements

    SBC: BAKER ENGINEERING, LLC            Topic: A03227

    Baker Engineering Inc. proposes opposed-piston engine power density improvements and testing for the SBIR Phase II, DoD Topic #A03-227, contract #W56HZV-04-C-0151. Design improvements, and extensive testing, will be conducted on a 5.8 L demonstrator opposed-piston “Giesel” engine. The 3-cylinder, 2-cycle engine has a target of 600 hp, and weighs less than 1500 lbs. Planned improvements inclu ...

    SBIR Phase II 2005 Department of DefenseArmy
  7. Fast Laser Pulse Shaping for Molecular Control and CB Detection

    SBC: Biophotonic Solutions, Inc.            Topic: A04T008

    The desired outcome of this STTR project is the development of compact, stand-alone, economical, and rugged pulse shaper units that can be used to control chemical reactions, and have a wide range of applications based on molecular control for detection of chemical and biological threats, explosive, and toxic chemicals. In addition, these units will enable a broad range of fundamental studies. Dur ...

    STTR Phase II 2005 Department of DefenseArmy
  8. ZnO Based Light Emitters for UV/Blue Applications

    SBC: CERMET, INC.            Topic: A04068

    The goal of this effort is to grow n and p ZnO thin films by MOCVD on ZnO substrates. The primary objective of this phase I effort will be to grow p-n homojucntion and characterize the LED structure. Bandgap of ZnO will be engineered and heterojunction quantum wells will be grown. The grown device structures will be characterized for structure and quality by X-ray, PL and electron microscopy, The ...

    SBIR Phase I 2005 Department of DefenseArmy
  9. ZnO Based Light Emitters for UV/Blue Applications

    SBC: CERMET, INC.            Topic: A04068

    The goal of this program is to develop ZnO based light emitters fabricated on high quality ZnO bulk substrates. The work will focus on enhance doping of the active layers, target alloy concentrations and prototype emitter fabrication.

    SBIR Phase II 2005 Department of DefenseArmy
  10. Techniques for Viewing Terrain Data on Handheld Displays

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    "While the technology is now available to deliver complex graphics files (such as terrain maps) to field-based users using handheld computers, it is difficult to view and navigate a large graphics file through a small viewing screen. The option ofincreasing the size of the display to give greater resolution (and comprehension) is not practical since field based personnel need portability and smal ...

    SBIR Phase I 2002 Department of DefenseArmy
US Flag An Official Website of the United States Government