You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Qualification of Aircraft Accelerometer NSN 6610-00-151-6684 & Torque Motor NSN 6105-01-326-8652

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    The objective of this Phase II SBIR proposal is to continue the design and qualification efforts for a single-axis accelerometer (NSN 6610-00-151-6684) and perform detailed design and qualification activities for a Torque Motor (NSN 6105-01-326-8652). During Phase II, Kaney will utilize in-house manufacturing and analysis capabilities to produce drawings and manufacturing/qualification plans for t ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  2. Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  3. Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  4. Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  5. REPLACING PLASTIC WITH BIODEGRADABLE PACKGING IN FOOD SERVICE

    SBC: Biomass Energy Systems, Inc.            Topic: DLA211003

    This proposal follows the DLA SBIR Phase 1 Contract SP4701-21-P-0075. It seeks resources to move to Phase 2 so that the lessons learned and data developed in Phase 1 will further expand on the solution, including the field demonstration for replacing the plastic packaging in food service with the biodegradable Cellulosic Bio-Polymer (CBP) packaging to address military needs. Phase 1 was a great le ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  6. 97ND7-SP4701-22-P-0061-Phase II Report-Innovative Approaches to the Headlamp Redesigns

    SBC: MAGWERKS VISION INC.            Topic: DLA222002

    GVSC Sustainment Engineering has requested information for a project to replace Lamp, Halogen 12360840-1 due to stock issues. MWV has met with the team and understand the request. Based upon initial concept discussions, MWV has the ability to design and supply a replacement solution. This will include removing existing Lens, Lamp, Reflector and all hardware needed for these items. MWV will then re ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  7. Rapid densification for solid-state electrolyte production

    SBC: ZAKURO INC            Topic: DLA203004

    Solid-state batteries promise energy densities well beyond that of current Li-ion batteries while providing additional safety through the elimination of the flammable liquid electrolyte. Of the solid-electrolytes currently under development, Li7La3Zr2O12 (LLZO) is attractive due to its inherent stability versus Li metal. One drawback for LLZO and any oxide electrolyte is the high temperatures requ ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  8. Source Approval Request (SAR) Package and Development Plan for Accelerometer NSN 6610-00-151-6684

    SBC: Kaney Aerospace, Inc.            Topic: DLA213001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for NSN 6610-00-151-6684, a high-reliability accelerometer for flight data recording systems onboard the B-1 platform. Due to the critical nature of the component, our SAR will be elevated to an engineering services activity (ESA). Kaney has extensive domain knowledge and capabilities related to this part. Through our re ...

    SBIR Phase I 2022 Department of DefenseDefense Logistics Agency
  9. Engaging the Small Business manufacturing Defense Industrial Base

    SBC: ADAPTIVE MANUFACTURING SOLUTIONS LLC            Topic: DLA221001

    DLA has a desire to expand and increase the number of small manufacturers to address DOD demands and grow the Defense Industrial Base (DIB).  More qualified sources of supply are needed to improve DLA product availability, provide competition to reduce cost and lead time, address lifecycle performance issues, and potentially improve upon the current part design.  Working collaboratively, AMS a W ...

    SBIR Phase I 2022 Department of DefenseDefense Logistics Agency
  10. MagWerks Lamps for Drop-in Energy Efficient Vehicular Lighting

    SBC: MAGWERKS VISION INC.            Topic: DLA222002

    MagWerks Vision Inc. will perform a feasibility study for their vehicular lighting system as it applies to the B-52H bomber aircraft.  Through this phase I effort, MWV aims help the Air Force achieve its goal of “resiliency and redundancy” by designing, testing, and validating its lighting solution for application to Air Force aircrafts, specifically the B-52H (af.mil). The expectation is th ...

    SBIR Phase I 2022 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government