You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Novel Methods to Monitor Health Status and Clinical Laboratory Data: Portable Acquisition, Assessment, and Reporting

    SBC: Mimosa Acoustics Inc.            Topic: OSD09H26

    Mimosa Acoustics will develop a portable binaural audiological device, based on our successful HearID system. HearID is a clinical system for otoacoustic emission and middle-ear power analysis testing; it is FDA and CE-marked. The new system will have the ability to conduct a variety of audiological tests especially for use in hearing-conservation programs, including: flexible otoacoustic emission ...

    SBIR Phase II 2011 Department of DefenseDefense Health Agency
  2. Front End Opto-Electronics for Future Radio Communications

    SBC: MICROLINK DEVICES INC            Topic: ST081013

    The innovation in this Phase II SBIR program is the development of a unique process technology that will enable the realization of a high current InP based photodetector capable of operating at increased optical power densities and with improved reliability. The process technology is an epitaxial lift-off (ELO) process in which the epitaxial material is completely removed from the InP substrate o ...

    STTR Phase II 2011 Department of DefenseDefense Advanced Research Projects Agency
  3. A High Level Synthesis Tool for FPGA Design from Software Binaries

    SBC: BINACHIP, INC.            Topic: SB062006

    Many DOD systems require advanced digital signal processing and image processing functions that cannot be efficiently implemented on conventional micro-processors, hence designers have started mapping these applications onto FPGAs. However, most FPGA implementations are manually designed and highly coupled to the hardware, often taking advantage of special hardware features of the target FPGA. T ...

    SBIR Phase I 2007 Department of DefenseDefense Advanced Research Projects Agency
  4. Photovoltaic Cells for Very High Altitude Very Long Endurance Solar Aircraft

    SBC: MICROLINK DEVICES INC            Topic: SB072043

    The significance of the innovation in this Phase I SBIR is the development of a technology which will enable the manufacture of a light weight, low cost cost , multi-band gap compound semiconductor material containing high efficiency compound semiconductor multijunction solar cells suitable for deployment for in very high altitude, very long endurance (HALE) solar solar aircraft. This will be ac ...

    SBIR Phase I 2007 Department of DefenseDefense Advanced Research Projects Agency
  5. Assignment Game for Distributed Logistics

    SBC: VCRSOFT LLC            Topic: SB062012

    Distributed logistics problems cannot be solved using traditional centralized optimization techniques because of the autonomous nature of the entities involved. We propose to design and demonstrate a decentralized automated negotiation based approach. This game theoretic approach is implemented as a generic agent toolkit that can be customized by the domain-expert.

    SBIR Phase I 2007 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government