You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Superconducting Undulator Test Cryostat Development
SBC: CRYOMAGNETICS INC Topic: C5506aC55-06a-270224-AbstractDemand for increased brightness of synchrotron light sources has been driven by advances in novel experimental techniques studying nanomaterials, micro- and nanocrystals, and interactions of atomic and molecular structures. Strong demand has pushed technologies of low emittance electron sources, novel concepts in electron storage rings, free electron lasers (FELs) and undula ...
SBIR Phase I 2023 Department of Energy -
Superconducting Undulator Test Cryostat Development
SBC: CRYOMAGNETICS INC Topic: C5506aC55-06a-270224-AbstractDemand for increased brightness of synchrotron light sources has been driven by advances in novel experimental techniques studying nanomaterials, micro- and nanocrystals, and interactions of atomic and molecular structures. Strong demand has pushed technologies of low emittance electron sources, novel concepts in electron storage rings, free electron lasers (FELs) and undula ...
SBIR Phase I 2023 Department of Energy -
SBIR Phase I:Boosting Industrial Bio-Fermentation with Microbial Stem Cells
SBC: ASIMICA, INC. Topic: BTThe broader impact of this Small Business Innovation Research (SBIR) Phase I project is to reimagine bio-manufacturing with a novel platform technology that could boost the yields of many products, including food additives, biomaterials precursors, biofuels, and pharmaceuticals. The technological advancement addresses a fundamental issue that limits conventional bio-fermentation, which is that pro ...
SBIR Phase I 2023 National Science Foundation -
SBIR Phase I:Renewable platinum catalyst for fuel cell applications
SBC: FC RENEW, LLC Topic: ENThe broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase I project is to overcome a limiting step in creating viable hydrogen fuel cells for the automotive industry. The solution will renew the battery catalyst without its removal from the vehicle. This will result in significant savings toward the total cost of ownership and an increase in overall system rel ...
SBIR Phase I 2023 National Science Foundation -
STTR Phase I:Multifunctional Lipid Nanoparticle Delivery System for Targeted Delivery of Vascular RNA Therapeutics
SBC: Richard Fisher Topic: BMThe broader impact/commercial potential of this Small Business Technology Transfer (STTR) Phase I project is that the proposed delivery system will advance many RNA therapeutic solutions to address intimal hyperplasia (IH) and other vascular conditions. Vascular disease is the most common disease pathology in the US, costing the country’s healthcare system over $437 billion dollars annually. Bec ...
STTR Phase I 2023 National Science Foundation -
Secondary Emission Detector Modules for High Energy Physics Experiments
SBC: NVIZIX LLC Topic: C5637aWe propose simulating and constructing a prototype and demonstration brassboard of a Secondary Emission Sensor Module (SESM) for ionizing radiation, as a proof of principle and guide to Phase II and beyond. The simulation and design studies will guide module construction and point to future uses. The module is anticipated to have ~30 stages of sheet dynode with an areal size ~15x15 cm. It will be ...
SBIR Phase I 2023 Department of Energy -
Selective Electrochemical Recovery of Rare Earth Elements from Ore
SBC: WYONICS LLC Topic: C5604a1. Problem StatementCurrent industrial-scale rare earth element separation technologies are based on solvent extraction schemes which produce large amounts of undesirable chemical waste, including the loss of volatile organic solvents and reagents employed in the treatment of feed streams. These concerns have severely limited the development of U.S.-based rare earth element separation facilities. ...
SBIR Phase I 2023 Department of Energy -
Multifunctional Ceramic Antifouling, Erosion- and Corrosion-resistant Coating for Hydropower Applications
SBC: NANOIONIX, LLC Topic: C5614bHydroelectric power is the world’s largest source of renewable energy. These massive systems are designed for a 50+ year service life, but this can be shortened substantially by poor water quality and the presence of flowing debris, sediment, minerals, and micro- and macro-organisms. Biofouling (especially from invasive species), corrosion, and erosion (wear) of critical components can limit per ...
SBIR Phase I 2023 Department of Energy -
Nanofiber Wipes for Decontamination of Equipment/Structures
SBC: ESPIN TECHNOLOGIES, INC. Topic: C5624bC56-24b-274053 Removal of contaminant remains one of the most significant cost components of the decontamination. Development of a low-cost nanofiber-based cleaning media suitable for efficient decontamination, with a wide range of desired characteristics meeting the required performance targets is the subject of this project. This Small Business Innovation Research Phase I project aims to design, ...
SBIR Phase I 2023 Department of Energy -
Non-PFSA Membranes from Sulfonated Polyphenylene Composites for Electrolyzers and Fuel Cells
SBC: ESPIN TECHNOLOGIES, INC. Topic: C5618kC56-18k-274059 eSpin Technologies, Inc. in cooperation with Sandia National Laboratories will develop and manufacture a new class of non-PFSA ionomers and proton exchange membranes (PEM). In Phase I, polymer synthesis with a range of uncharged and linear crosslinkable non PFSA polymer will be carried out. Reinforcing nanofiber scaffold will be developed from uncharged robust polymers into which th ...
SBIR Phase I 2023 Department of Energy