You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Geothermal Energy Generation Using Dormant Wells in High-Temperature Shale Sedimentary Areas
SBC: RENASCENT ENERGY MANAGEMENT LLC Topic: C5513aC55-13a-270233The project embodies a field demonstration of a novel geothermal process via water injection into a shut- in existing well (already drilled & hydraulically fractured, and shut-in) for a short period, and then that injected water, having been heated by contacting the subsurface rock, is produced back to the surface (via the same well through which it was injected). This intermittent p ...
SBIR Phase I 2023 Department of Energy -
Network Risk Assessment Toolkit (NetRAT)
SBC: PROTECTION ENGINEERING CONSULTANTS LLC Topic: C5501bC55-01b-270620Infrastructure systems such as electricity distribution and transmission grids, transportation networks, and water or oil/gas distribution pipelines are critical from an economic and national security standpoint. Expedited risk quantification of infrastructure network systems is of utmost importance for resiliency assessment against natural or man-made hazards. Currently available te ...
SBIR Phase I 2023 Department of Energy -
Novel Design for Passenger Railcar Retention Systems
SBC: PROTECTION ENGINEERING CONSULTANTS LLC Topic: 23FR2Additional passenger fatalities and injuries can occur in rollover-type derailment accidents due to failures of glazing retention mechanisms on passenger railcars. In recent accidents, a key failure mode is shearing off the external rubber gasket that secures the glazing panes as the side of the railcar drags along the ground. Once the gasket fails, the glazing pane is pushed inside, leaving an op ...
SBIR Phase I 2023 Department of Transportation -
CySense: Hardware-assisted Cyberattack Detection Engine
SBC: Caspia Technologies LLC Topic: DHS231001Cyberattacks are a growing concern in every market with network-connected devices. Attacks such as ransomware, malware, spyware, spoofing, botnets, and more, can result in intellectual property theft, system downtime, reputation damage, and unfortunately loss of life. Most cyberattack detection techniques are limited in scalability and detection efficacy as the cyberattack landscape is constantly ...
SBIR Phase I 2023 Department of Homeland Security -
SBIR Phase I:An extravascular bipolar catheter for targeted nerve ablation with minimal collateral damage to surrounding tissues
SBC: Tyler Melton Topic: MDThe broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase I project is a novel and emerging method for treating a subset of heart failure patients. Despite modern medical regimen and device therapies, heart failure affects 6 million Americans and remains a leading cause of death and hospitalization in the United States. The proposed system and approach aim to ...
SBIR Phase I 2023 National Science Foundation -
SBIR Phase I:Automated Gram Stain Interpretation Via Digital Holographic Microscopy
SBC: Macula Vision Systems Inc. Topic: BMThe broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase I project is the improvement in hospital laboratory results by automating and standardizing a manual test procedure that is critical for the diagnosis of infections. Faster, higher quality and less expensive test results will help to ensure that patients receive timely treatment with the appropriate med ...
SBIR Phase I 2023 National Science Foundation -
SBIR Phase I:Autonomous Inspection Robot for Seal Inspection of Floating Roof Storage Tanks
SBC: Pike Robotics Inc. Topic: Rhe broader/commercial impact of this Small Business Innovation Research (SBIR) Phase I project is to develop an autonomous, robotic inspection system to eliminate manual inspection methods in confined and dangerous spaces. The innovation will use a robot to provide quantitative condition and emissions data for an estimated 150,000 floating roof tanks in the nation’s aging infrastructure. The Env ...
SBIR Phase I 2023 National Science Foundation -
SBIR Phase I:Beyond thin-film optics: Resonant grating-based optical component technology
SBC: TIWAZ TECHNOLOGIES LLC Topic: PHThe broader/commercial impact of this Small Business Innovation Research (SBIR) Phase I project is to simplify and significantly reduce the cost of optical component fabrication. Optical components, with well-known examples being mirrors, polarizers, and lenses, are essential building blocks in a host of civilian and military systems including imaging, telecommunications, and laser systems. Curren ...
SBIR Phase I 2023 National Science Foundation -
SBIR Phase I:Bio-erodible Contraceptive-Releasing Implant
SBC: HERA HEALTH SOLUTIONS INC Topic: BMThe broader impact of this Small Business Innovation Research (SBIR) Phase I project will be to provide a highly effective and long-acting implantable contraceptive for the 61 million American women in their childbearing years (ages 15 to 44), 70% of whom are at risk for unintended pregnancies. Unintended pregnancies accounted for half of the total pregnancies in 2022, and over 60% of unplanned pr ...
SBIR Phase I 2023 National Science Foundation -
SBIR Phase I:Boosting Industrial Bio-Fermentation with Microbial Stem Cells
SBC: ASIMICA, INC. Topic: BTThe broader impact of this Small Business Innovation Research (SBIR) Phase I project is to reimagine bio-manufacturing with a novel platform technology that could boost the yields of many products, including food additives, biomaterials precursors, biofuels, and pharmaceuticals. The technological advancement addresses a fundamental issue that limits conventional bio-fermentation, which is that pro ...
SBIR Phase I 2023 National Science Foundation