You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Electron-beam Switches for a High Peak Power Active SLED-II Pulse Compressor
SBC: Omega-P, Inc. Topic: 34cThis SBIR project will be devoted to the development and demonstration of high-power X- band switches to operate with the two resonant delay lines of the SLED-II pulse compression system. Each switch is triggered with an intense electron beam drawn from a diamond-coated molybdenum cold cathode. Preliminary tests of prototype X-band switches using the Omega- P/NRL X-band magnicon have already sho ...
SBIR Phase I 2013 Department of Energy -
A New Nb3Sn Process with a Novel Artificial Pinning Center for High Energy Physics and High Magnetic Field Applications
SBC: Supramagnetics, Inc. Topic: 35aThe development of an APC Nb3Sn superconductor with tin-pin artificial pinning centers by the proposed approach in the Phase I program, is anticipated to have a significant impact on cost and performance in applications for undulator magnets. The overall technical approach for the Phase I project will be to develop and demonstrate an Nb3Sn superconductor with tin-Al2O3 pins for HEP magnets. The ...
SBIR Phase I 2013 Department of Energy -
Deep Vector Sensor System
SBC: Applied Physical Sciences Corp. Topic: N122113Applied Physical Sciences and the Navmar Applied Sciences propose to adapt existing vector sensor and sonobuoy technology within their respective areas of expertise to develop a preliminary design for a passive deep water directional sonobuoy. The Phase I Base is centered on tasks pertaining to vector sensor design with emphasis on achieving the stringent noise floor criteria in an A-Size sonobuoy ...
SBIR Phase I 2013 Department of DefenseNavy -
Online Interactive Generative Multiscale Manifold Learning
SBC: Plain Sight Systems Inc Topic: N122138One of the main obstacles to the useful exploitation of dimensionality reduction, both linear and nonlinear, is the lack of effective synthesis methods to generate examples in the original exploitation space, as opposed to the low dimensional parameter space. The ability to interactively navigate in the appropriate relevant low dimensional representation, and simultaneously observe the related"ori ...
SBIR Phase I 2013 Department of DefenseNavy -
Cost-Effective Technologies for Fabrication of PiezoCrystal Vector Velocity Sensors
SBC: Applied Physical Sciences Corp. Topic: N122139Applied Physical Sciences (APS) has developed a plan to improve the design and development of submarine towed array vector sensors that employ single crystal accelerometers so that they meet Navy specifications, but do so at significantly lower cost relative to earlier variants. Tasks in the Phase I study include developing a comprehensive cost-model which will ascertain the feasibility of various ...
SBIR Phase I 2013 Department of DefenseNavy -
Cohort Builder for Healthcare Quality Assurance and Comparative Health Effectiveness Research
SBC: Big Computing, LLC Topic: DHP12006We propose to carry out a three-phase R & D project leading to a scalable, easy-to-use Cohort Builder software tool making it possible for clinical practitioners and quality assurance personnel to carry out comparative health research studies quickly and effectively, without the need for in-depth data or analytics expertise. In Phase I, we will investigate strategic, operational, and technical iss ...
SBIR Phase I 2013 Department of DefenseDefense Health Agency -
EOIR Debris Management during ascent phase for C2BMC
SBC: APPLIED MATHEMATICS, INC. Topic: MDA12T004We propose to develop algorithms to improve debris management for electro-optical/infrared sensors (EO/IR) within C2BMC. Our goal is to improve fire control solutions, increase the quality of communicated sensor information, and reduce communication demands. We characterize the pre-intercept debris field mathematically by expressing the debris fields viewed on the sensor"s focal plane as 2D elli ...
STTR Phase I 2013 Department of DefenseMissile Defense Agency -
Single Step Manufacturing of Low Catalyst Loading Electrolyzer MEAs
SBC: Proton Energy Systems, Inc. Topic: 01aProton exchange membrane (PEM) electrolysis is industrially important as a green source of high purity hydrogen, for chemical applications as well as energy storage. However, the energy required to manufacture these units is still high, due to the multi-step processes employed. Today, the majority of cost and energy use in PEM electrolyzer manufacturing is contributed by the cell stack manufacturi ...
STTR Phase I 2013 Department of Energy -
Fuel Flexible Low Emissions Burner for Waste-to-Energy Systems
SBC: PRECISION COMBUSTION, INC. Topic: FWaste-to-energy (WTE) technologies are being developed that combine waste management and energy generation. Theses wastes include a wide range of bio-based fuel stocks (biomass from wood and/or grasslands) or organic waste streams (manure and farm waste, municipal solid waste (MSW), sawdust). Much ingenuity is being directed to producing liquid fuels or useful solids such as char from biomass, b ...
SBIR Phase I 2013 Environmental Protection Agency -
Plug and Play Realtime Diagnosis for Ground Processing System Integration
SBC: QUALTECH SYSTEMS, INC. Topic: H1001NASA's "Ground Systems Development and Operations Program" is moving towards transforming parts of the Kennedy Space Center from a historically government-only launch complex to a spaceport bustling with activities involving government and commercial vehicles alike. The success of this transformation drive largely depends on achieving the ability to process multiple types of vehicles, within ...
SBIR Phase I 2013 National Aeronautics and Space Administration