You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. C17 Globemaster III Nucleated Foam On-wing engine performance restoration

    SBC: AEROCORE TECHNOLOGIES LLC            Topic: AFX236DPCSO1

    The United States Air Force (USAF) aims to enhance the energy efficiency and readiness of the C-17 Globemaster III through the application of AeroCore's advanced technologies. These technologies, including Nucleated Foam Technology and On-Wing Restoration

    SBIR Phase II 2023 Department of DefenseAir Force
  2. Additive Manufacturing of Functionally Graded Parts for High Performance Applications

    SBC: GRID LOGIC INCORPORATED            Topic: DOEC5436h

    In recent years, the nuclear power industry has been exploring the use of conventional powder metallurgy and hot-isostatic press technologies to fabricate large, near net shape components for high pressure components and other applications pertaining to the generation of electric power. Powder metallurgy has many manufacturing consistency and reliability advantages over other large-scale manufactu ...

    SBIR Phase II 2023 Department of DefenseDefense Advanced Research Projects Agency
  3. Online and Offline Terrain Strength Estimation Using Remote Sensing for Ground Vehicle Mobility- Phase II

    SBC: MTRI INC            Topic: A21CT021

    NATO is currently developing the Next-Generation Reference Mobility Model (NG-NRMM), which is used to determine terrain strength properties for mobility. The NG-NRMM relies heavily on in-situ measurements, which is a significant limitation for traversing unknown areas and combat zones. The MTRI Inc. and MTU team recently competed the A21C-T021 Phase I Small Business Technology Transfer (STTR) proj ...

    STTR Phase II 2023 Department of DefenseArmy
  4. STRATFI- BASECAMP SEQUENTIAL PHASE II

    SBC: SIMBA CHAIN INC            Topic: AF192001

    The STRATFI Earth 616 project will create a proof of concept secure Distributed Ledger Technology (DLT) based environment to provide near real-time visibility and traceability, along with associated securing of digital assets, for parts and data from an i

    SBIR Phase II 2023 Department of DefenseAir Force
  5. Power Management for Energy Resiliency

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: A224015

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  6. 97ND7-SP4701-22-P-0061-Phase II Report-Innovative Approaches to the Headlamp Redesigns

    SBC: MAGWERKS VISION INC.            Topic: DLA222002

    GVSC Sustainment Engineering has requested information for a project to replace Lamp, Halogen 12360840-1 due to stock issues. MWV has met with the team and understand the request. Based upon initial concept discussions, MWV has the ability to design and supply a replacement solution. This will include removing existing Lens, Lamp, Reflector and all hardware needed for these items. MWV will then re ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  7. Precision Auto Calibrated Shell Resonator Gyroscope

    SBC: ENERTIA MICROSYSTEMS INC            Topic: N211012

    Our goal for this Navy SBIR project is to develop a TRL-7 prototype of the BRG with excellent long-term bias stability and shock and vibration insensitivity that can operate in a military temperature range (-50–80 °C) and optionally can operate at very high temperature (200 °C) (i.e. bias drift < 0.01 deg/hr, angle random walk < 0.005 deg/sqrt(hr), and scale factor stability < 100 ppm).  We ...

    SBIR Phase II 2023 Department of DefenseNavy
  8. Raw Resource Salvage and Shipment with Laelaps Autonomous Spacecraft

    SBC: KALL MORRIS INCORPORATED            Topic: AFX236DPCSO1

    To address the US Space Force’s need for Space Access, Mobility, and Logistics, Kall Morris Inc proposes furthering the development of the Laelaps spacecraft. Laelaps is built around a 15” ESPA-class satellite bus, enabling launch to orbit as a rideshare

    SBIR Phase II 2023 Department of DefenseAir Force
  9. Miniaturized High Data Rate Sonobuoy Tether

    SBC: SEALANDAIRE TECHNOLOGIES, INC.            Topic: N221023

    SeaLandAire (SLA) will build on the work done in the Phase I effort to address the Navy’s need for a strengthened, full-duplex communications datalink between the surface unit of a sonobuoy and its suspended payload, as described in Navy SBIR Topic N221-023. SLA, along with our partner AFFOA, will develop, build and test prototype tethers.  We will design a fiber optic based tether which will a ...

    SBIR Phase II 2023 Department of DefenseNavy
  10. High Strength Composite System for Ships

    SBC: TRIMER TECHNOLOGIES LLC            Topic: N211054

    Composite materials have become ubiquitous over the past two decades with greater use in naval structures due to the high specific strength, stiffness, and toughness offered with respect to other engineering materials. While fiber reinforced polymers have found wide use in commercial applications, currently used materials are costly and require extended cure times which greatly increases manufactu ...

    SBIR Phase II 2023 Department of DefenseNavy
US Flag An Official Website of the United States Government