You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. STRATFI- BASECAMP SEQUENTIAL PHASE II

    SBC: SIMBA CHAIN INC            Topic: AF192001

    The STRATFI Earth 616 project will create a proof of concept secure Distributed Ledger Technology (DLT) based environment to provide near real-time visibility and traceability, along with associated securing of digital assets, for parts and data from an i

    SBIR Phase II 2023 Department of DefenseAir Force
  2. Maximizing Performance of High Energy Density Liquid Rechargeable Battery PODs for Closed Cycle Energy Storage Ecosystem

    SBC: INFLUIT ENERGY LLC            Topic: NSF5371

    Energy is a critical enabling component of military operations and demand for it will continue to increase over the next few decades. Effective utilization of renewable energy could reduce demand for fuel for forward operating bases (FOBs), remote operating bases (ROBs), and expeditionary forces, and battlefields providing longer term energy solutions that support sustainment of technical superior ...

    SBIR Phase II 2022 Department of DefenseDefense Advanced Research Projects Agency
  3. Optical Grade Sapphire Manufacturing Growth Process for IR Window Applications

    SBC: Rubicon Technology, Inc.            Topic: AF101C001

    ABSTRACT: Sapphire possesses a number of physical properties, including high strength, high melting point, chemical inertness, and excellent transparency in the visible and IR spectrum, which make it an attractive window material for military applications. For Phase I, Rubicon Technology demonstrated a sapphire crystal growth process to MRL 5 capable of growing slabs 20"x 14". During Phase II th ...

    SBIR Phase II 2012 Department of DefenseAir Force
  4. Terminally Guided Robots and Robotic Applications in Confined Spaces

    SBC: Variation Reduction Solutions Inc            Topic: AF063C011

    Northrop Grumman Corporation (NGC) has a contract with Lockheed Martin to design, build, and produce the center fuselage section of the Joint Strike Fighter (JSF F-35). There are three ducts which are the primary components of this section – the aft duct and two forward (inlet) ducts – right and left. Due to their length, curvature, and extremely tight constraints, the RH & LH inlet ducts pr ...

    SBIR Phase II 2007 Department of DefenseAir Force
  5. Affordable Accurate Robot Guidance (AARG)

    SBC: Variation Reduction Solutions Inc            Topic: AF091C001

    The authors establish a novel metrology system capable of determining the pose of a robotically-mounted End of Arm Tool (EOAT) in Six Degrees of Freedom (6-DOF) to a capability better than True Position (TP) 0.010 in. The metrology system consists of low-cost, modular components in the form of motorized gimbals that steer laser beams onto robot-affixed, photosensitive chips typical of those found ...

    SBIR Phase II 2010 Department of DefenseAir Force
  6. Electron-Beam Additive Manufacturing Process Control for Titanium Alloys

    SBC: SCIAKY INC            Topic: AF091C002

    The proposed scope of work is intended to comprise efforts to implement a production capable Electron Beam Direct Manufacturing (EBDM)system intended to produce parts with sufficient quality and affordability to meet Air Force program requirements. The scope deals not only with the EBDM process specifically but the entire supply chain which is involved with delivering finished titanium aerospace s ...

    SBIR Phase II 2011 Department of DefenseAir Force
  7. Panel Step/Gap Mismatch Measurement

    SBC: TeraMetrix, LLC            Topic: AF082C001

    In phase II we will develop a prototype TD-THz step/gap mismatch measurement system. This system will be able to measure the sub-surface ground-plane step and gap dimensions on the seams of panels on the F-35 aircraft. In phase I, we demonstrated the ability of the TD-THz method to measure the dimensions of the ground-plane step and gap through otherwise opaque boots and coatings. The first app ...

    SBIR Phase II 2010 Department of DefenseAir Force
  8. High Performance Radiation Hard Solar Power (STRATFI)

    SBC: MICROLINK DEVICES INC            Topic: AF211DCSO1

    The work proposed herein can be divided into three primary tasks: pre-qualification testing, AIAA S-111A qualification, and AIAA S-112A qualification. Each of the AIAA qualifications can be split into three separate sections: qualification tests with pass/fail criteria, characterization tests used to estimate properties and degradation of cells and panels over a given mission, and a quality report ...

    SBIR Phase II 2022 Department of DefenseAir Force
  9. Wide Angle Night Vision Visor System (Concept XII)

    SBC: Night Vision Corp            Topic: N/A

    A light weight night vision system is integrated to the visor of military type helmet. The intensified field of view is 100 degrees horizontal by 40 degrees vertical. Peripheral field of view is practically unobstructed and provides up-look capability. Long eye relief provides for eye glasses clearance. This night vision visor is a self contained unit with low profile and close center of gravi ...

    SBIR Phase II 1996 Department of DefenseAir Force
  10. Automated Fastener Installation System

    SBC: Variation Reduction Solutions Inc            Topic: AF103C148

    ABSTRACT: Sorting, solvent-cleaning, promoting, delivering, sealing and installing 30,000 fasteners per day is a critical task required for full-rate production of the F-35 Lightning II. These 30,000 fasteners are comprised of approximately 350 unique part numbers and each must receive one of three different promoter solutions and sealers, each with time-limited properties. Preparing the fast ...

    SBIR Phase II 2012 Department of DefenseAir Force
US Flag An Official Website of the United States Government