You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. The Full Integration of a Portable Bacterial Concentrator with a Pathogen Detector Device

    SBC: OMNIVIS INC            Topic: 90

    This SBIR Phase II project proposes to integrate an easy to use, inexpensive, and portable bacterial concentrator with a handheld pathogen detection system to enable ultra-low cholera pathogen (Vibrio cholerae) detection. Cholera affects communities across 41 countries, including in Yemen, where in the first 5 months of 2020 has had 110,000 suspected cases. Current methods used to detect the chole ...

    SBIR Phase II 2020 Department of CommerceNational Institute of Standards and Technology
  2. Additive Manufacturing Advisory System

    SBC: IMAGINESTICS, LLC            Topic: AF141213

    During the Phase II period (2016 - 2018) the contractor learned a great deal about the true needs of the Air Force in regard to the challenges faced adopting and embracing AM as a new method for manufacturing DoD parts. Given the new design rules, AM is considerably different than conventional manufacturing methods and can sometimes be challenging for even experienced users. If AM is fully leverag ...

    SBIR Phase II 2020 Department of DefenseAir Force
  3. Open Call for Innovative Defense-Related Dual-Purpose Technologies/Solutions with a Clear Air Force Stakeholder Need

    SBC: IBC Materials & Technologies, LLC            Topic: AF192001

    Secondary power system components such as gearboxes are de-painted each year as part of routine maintenance, repair and overhaul (MRO) activities. Current paint removal processes involve soaking the parts in a toxic chemical solvent, followed by media blasting. The chemicals and blast media are expensive, and the time required to complete a depainting operation with this process is typically on th ...

    SBIR Phase II 2020 Department of DefenseAir Force
  4. Increase Competition through Small Business Source Approval Aircraft Launch and Recovery Equipment (ALRE) Critical Safety/Critical Application Items (CSI/CAI)

    SBC: Form Fit and Function LLC            Topic: DLA172001

    Development of multiple (8) SAR packages to increase sources and competition of ALRE CSI/CAI items, to reduce cost and lead time.

    SBIR Phase II 2019 Department of DefenseDefense Logistics Agency
  5. Aircrew-Mounted Self-Adjusting Tether System

    SBC: WOLF TECHNICAL SERVICES INC            Topic: N171026

    Wolf is developing an aircrew-mounted helicopter restraint system for mobile aircrew that prevents ejection from the aircraft and provides crash and fall protection. It attaches to any D-ring currently used to attach the gunner's belt, and requires no modification to the aircraft to use. It automatically manages the slack between the aircrew and the attachment point. It senses motion associated wi ...

    SBIR Phase II 2019 Department of DefenseNavy
  6. Fiber Optic Refractive Index Matching Material

    SBC: Tetramer Technologies,L.L.C.            Topic: N112125

    In this Navy Small Business Innovative Research (SBIR) program, Tetramer has developed a UV curable adhesive, TIMA, for use in mechanical splices for the repair of avionic fiber optic systems in the F/A-18 Hornet and other Department of Defense plaforms. Through Phase I and Phase II efforts, the TIMA adhesive performance was demonstrated in a breadboard system, surpassing all applicable quality cr ...

    SBIR Phase II 2019 Department of DefenseNavy
  7. Submarine Shipboard Power Supply Bridge

    SBC: PC Krause And Associates, Inc.            Topic: N171075

    The objective of this effort is to construct and test a 40 kW UPS with at least 100ms of holdup time, integrated into a standard 19 inch rack mount enclosure with 4U (7 inch) height, and designed to meet electrical and mechanical/shock specifications required for naval shipboard application. Traditional UPS applications are typically not optimized for weight and volume, and utilize bulky lead-acid ...

    SBIR Phase II 2019 Department of DefenseNavy
  8. Prime Power System Development for Active Denial Technology (ADT) and High-Power Radio-Frequency (RF) Systems

    SBC: CANDENT TECHNOLOGIES INCORPORATED            Topic: N132086

    Solid state RF and millimeter wave weapons systems require substantial power to operate. Pure solid state systems have limited energy density and require charging over the typical use cycle. The directed energy system must be compact enough to mount on a vehicle such as a HMMWV, a small trailer or a structure such as found within an embassy compound. Current power systems are much too large and he ...

    SBIR Phase II 2019 Department of DefenseNavy
  9. Power Factor Correction

    SBC: PC Krause And Associates, Inc.            Topic: N181005

    The primary objective of this Phase II proposal is to further develop and demonstrate a lightweight passive power factor compensation unit utilizing advanced high-temperature magnetic materials and design techniques to achieve power quality improvement for a 65 kVA, 115V, 400-Hz aircraft power system. Based on identified system problems in the F-18 Super Hornet platform, the compensation system mu ...

    SBIR Phase II 2019 Department of DefenseNavy
  10. “Black Box� RF Sat-Link for Mission Success, Risk Mitigation, and Space Debris

    SBC: NearSpace Launch            Topic: AF183005

    The proposed Phase 2 NSL Black Box is a redundant radio link connected through the $2B Globalstar commercial Sat-phone constellation and a timely AF Dual-Purpose Technology. The miniaturized and autonomous Black Box (BB) solution with its 24/7 global coverage (latency of seconds) can greatly increase performance and response, reduce risk, and help with orbital debris tracking. The Black Box techno ...

    SBIR Phase II 2019 Department of DefenseAir Force
US Flag An Official Website of the United States Government