You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. STRATFI- BASECAMP SEQUENTIAL PHASE II

    SBC: SIMBA CHAIN INC            Topic: AF192001

    The STRATFI Earth 616 project will create a proof of concept secure Distributed Ledger Technology (DLT) based environment to provide near real-time visibility and traceability, along with associated securing of digital assets, for parts and data from an i

    SBIR Phase II 2023 Department of DefenseAir Force
  2. Wide Bandgap Bi-Directional Converter Phase II

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: A214030

    The objective of this effort is to demonstrate a 600 Vdc to 28 Vdc, isolated bi-directional power converter that utilizes wide bandgap semiconductors and can operate across a range of military ground vehicles.  The proposed converter is based on a modular topology that contains a combination of GaN and SiC devices, provides at least 15 kW bi-directional power flow continuously, and satisfies the ...

    SBIR Phase II 2023 Department of DefenseArmy
  3. Active Thermal Control System Optimization

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: N152115

    The primary objective of this effort will be the development, demonstration, and validation of a new suite of modeling and simulation capability for Navy analysis needs. The tool suite will utilize a new framework for implementing components models that will allow users to more easily access multiple analytical domains, including steady-state on-design and dynamic off-design. A new suite of tools ...

    SBIR Phase II 2023 Department of DefenseNavy
  4. Reverse Engineering of Limited Source Items for Source Approval Requests

    SBC: Form Fit and Function LLC            Topic: DLA172001

    During this project the Reverse Engineering (RE) practices will be applied to develop Technical Data Packages (TDPs) for needed items with limited or no sources of supply, with the ultimate goal of submitting a Source Approval Request (SAR). Using a proven Reverse Engineering and SAR development process, the packages will be developed and submitted to the relevant Engineering Authority. DLA is at ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  5. C17 Globemaster III Nucleated Foam On-wing engine performance restoration

    SBC: AEROCORE TECHNOLOGIES LLC            Topic: AFX236DPCSO1

    The United States Air Force (USAF) aims to enhance the energy efficiency and readiness of the C-17 Globemaster III through the application of AeroCore's advanced technologies. These technologies, including Nucleated Foam Technology and On-Wing Restoration

    SBIR Phase II 2023 Department of DefenseAir Force
  6. Understanding and optimizing roll-to-roll manufacturing of high- strength, transparent polymer composite films

    SBC: TESSELLATED INC            Topic: A21CT025

    Tessellated Inc and the University of Notre Dame have produced composite thin films with the highest reported tensile strengths. These films have been produced using roll-to-roll manufacturing techniques that can be adapted to current manufacturing lines. Small amounts of fillers can be added to an ultra-high molecular weight polyethylene matrix to produce thin films with high tensile strength. Th ...

    STTR Phase II 2023 Department of DefenseArmy
  7. Armament System AI Data Logger & Architecture

    SBC: ALTRON, INC.            Topic: A224002

    Redacted

    SBIR Phase II 2023 Department of DefenseArmy
  8. Ultra-Quiet, Long Endurance, Group 1 SUAS Engines

    SBC: ENGINE RESEARCH ASSOCIATES INC            Topic: AFX236DPCSO1

    This direct to Phase II program is needed to take the commercial Migrating Combustion Chamber (MCC) FE-120 baseline engine and complete the development, design improvements and testing that is required for integration into a Group 1 SUAS, like the RQ-20 P

    SBIR Phase II 2023 Department of DefenseAir Force
  9. BakUpMobile: Rapidly Deployable Energy Storage System to Provide Tactical Power

    SBC: RAVENSAFE LLC            Topic: AFX236DPCSO1

    Ravensafe provides a portable energy storage solution that negates the use of fuel generators for providing instant power. The portable energy storage system can be recharged by grid power, solar, or generator. The power is stored in a hybrid lithium ion

    SBIR Phase II 2023 Department of DefenseAir Force
  10. Zero Trust Methodology for Digital Modeling

    SBC: ISTARI, INC.            Topic: X22DOTCSO1

    At a high level, the major mission focus of this research is:  How can the DAF and broader DoD leverage Zero Trust methodology into digital model sharing and collaboration? The technical focus of this research is:  What is the best manner to link digital

    STTR Phase II 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government