List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. Rapid Prototype Portable Combat and Launch System

    SBC: SYSTEMS ENGINEERING ASSOCIATES CORPORATION            Topic: N95053

    SEA CORP will leverage the innovative technologies developed under the prior SBIR Phase II project and extend the Research & Development (R&D) activities to the development of critical submarine combat system payload integration efforts. In the previous effort, components were successfully developed facilitating integration of Improved Submarine Launched Mobile Mine (ISLMM) capability aboard subma ...

    SBIR Phase II 2019 Department of DefenseNavy
  2. Non-collinear Wave-front Curvature Range Measurement

    SBC: MIKEL, INC.            Topic: N02025

    The goal of this Phase II SBIR is to extract more information from existing submarine acoustic sensors through a highly innovative inter- and intra-sensor correlation algorithmic, in order to provide U.S. submarines with increased acoustic superiority over increasingly quiet adversaries. U.S. adversaries are continuously improving their acoustic quieting technologies through efforts such as marine ...

    SBIR Phase II 2019 Department of DefenseNavy
  3. Solid State Radar Emitter Identification

    SBC: SYSTEMS ENGINEERING ASSOCIATES CORPORATION            Topic: N171043

    The ultimate goal of this SBIR effort is to deliver improvements to existing Fleet electronic warfare support systems by using statistical learning techniques to aid in the classification and unique identification of modern radar emitters. Since software-defined and solid-state emitters do not have the analog features traditionally used for classification, we will use more abstract, but well-defin ...

    SBIR Phase II 2019 Department of DefenseNavy
  4. Submarine Shipboard Power Supply Bridge

    SBC: P C KRAUSE AND ASSOCIATES INC            Topic: N171075

    The objective of this effort is to construct and test a 40 kW UPS with at least 100ms of holdup time, integrated into a standard 19 inch rack mount enclosure with 4U (7 inch) height, and designed to meet electrical and mechanical/shock specifications required for naval shipboard application. Traditional UPS applications are typically not optimized for weight and volume, and utilize bulky lead-acid ...

    SBIR Phase II 2019 Department of DefenseNavy
  5. Black Box RF Sat-Link for Mission Success, Risk Mitigation, and Space Debris

    SBC: NearSpace Launch            Topic: AF183005

    The proposed Phase 2 NSL Black Box is a redundant radio link connected through the $2B Globalstar commercial Sat-phone constellation and a timely AF Dual-Purpose Technology. The miniaturized and autonomous Black Box (BB) solution with its 24/7 global coverage (latency of seconds) can greatly increase performance and response, reduce risk, and help with orbital debris tracking. The Black Box techno ...

    SBIR Phase II 2019 Department of DefenseAir Force
  6. Open Call for Innovative Defense-Related Dual-Purpose Technologies/Solutions with a Clear Air Force Stakeholder Need (RAPID)

    SBC: Trek10 Inc.            Topic: AF183005

    Legacy Air Force IT systems behind the Operational Training Infrastructure (OTI) are inhibiting warfighter readiness due to lack of interoperability and flexibility, high costs, and need for manual processes. Next generation cloud computing that focuses on cloud-native, serverless designs will enable the Air Force to embrace agility, security, scalability, and lower costs to modernize the OTI.Trek ...

    SBIR Phase II 2019 Department of DefenseAir Force
  7. Optical Device for Sorting Particles by Size

    SBC: En'urga Inc.            Topic: NA

    This Phase II SBIR project will continue the development of an optical sorter that will be used to estimate drop sizes in sprays. The optical sorter will determine the size of drops in the 0.1 to 10 microns range. Drops in this size range are prevalent in the automobile industry, where the fuel injection pressures have increased tremendously over the past two decades. These newer injectors provide ...

    SBIR Phase II 2018 Department of CommerceNational Institute of Standards and Technology
  8. Rational Design of sub-100 nm Polystyrene Particles with a Low Coefficient of Variation in Size

    SBC: Tetramer Technologies,L.L.C.            Topic: NA

    During this Phase II SBIR development program, Tetramer Technologies will develop highlymonodisperse 100-nm and sub-100-nm diameter nanoparticles for use as latex size standards. Highlymonodisperse nanoparticle latexes are needed for improved calibration of electron microscopes, lightscatteringparticle sizing instruments, atomic force microscopes, and particle counters/contamination monitors used ...

    SBIR Phase II 2018 Department of CommerceNational Institute of Standards and Technology
  9. Reduced Cavitation, High Efficiency Outboard Propulsors for Small Planing Craft

    SBC: CANDENT TECHNOLOGIES INCORPORATED            Topic: N17AT019

    The Candent Technologies Reduced Cavitation, High Efficiency Outboard Propulsor for Small Planing Craft Phase II program is structured to develop an advanced waterjet propulsor for the Combat Rubber Raiding Craft (CRRC). This new axial flow waterjet propulsion system is designed as a bolt on assembly that replaces the lower unit of the existing MFE 55 outboard motor. This new propulsion system inc ...

    STTR Phase II 2018 Department of DefenseNavy
  10. Additively Manufactured Inflatable Hulls- Improved Survivability- 20% Total Ownership Cost Reduction

    SBC: Response Technologies, LLC            Topic: DLA152001

    Seam failures of flexible inflatable hulls is the primary reason for failures of military RHIBS and CRCs.These failures are a result of the current manufacturing methods being used, and which have been in place for over fifty years.Whats more, the manufacturing methods and fragmented supply chain of these hulls result in very long and unreliable lead times.These shortcomings impact the survivabili ...

    SBIR Phase II 2018 Department of DefenseDefense Logistics Agency

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government