You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 1 - 10 of 4378 results
  1. eSTOL Aircraft Rapid Development, Prototyping, Test, and Evaluation

    SBC: ELECTRA.AERO INC.            Topic: AF203DCSO1

    Driven by the latest strategy directives – including the SECAF’s Operational Imperatives, USAF Chief of Staff’s Agile Combat Employment (ACE) doctrine, and USAF Operational Energy goals – the USAF has clearly articulated requirements for tactical logistic

    SBIR Phase II 2023 Department of DefenseAir Force
  2. STRATFI- BASECAMP SEQUENTIAL PHASE II

    SBC: SIMBA CHAIN INC            Topic: AF192001

    The STRATFI Earth 616 project will create a proof of concept secure Distributed Ledger Technology (DLT) based environment to provide near real-time visibility and traceability, along with associated securing of digital assets, for parts and data from an i

    SBIR Phase II 2023 Department of DefenseAir Force
  3. Zeno Power Systems Strategic Financing Increase (STRATFI) Proposal

    SBC: ZENO POWER SYSTEMS, INC.            Topic: AF192D001

    At Zeno, we’re developing an next-generation radioisotope power system (RPS) that operates by converting the heat from decaying radioisotopes directly into electricity – providing always-on, resilient power in the W-kW range for years at a time. NASA and the U.S. Department of Defense have historically used RPSs, but the cost or weight of these systems limited their broader usability. Zeno's ...

    SBIR Phase II 2022 Department of DefenseAir Force
  4. Combat Systems of the Future

    SBC: Advanced Systems/Supportability Engineering Technologies And Tools, Inc.            Topic: N05149

    The S-351 mini-sub is a prototype of the Dry Combat Submersible (DCS). This prototype was established as a means of risk reduction prior to a full commitment to the DCS program. Both of these platforms have an operational need to transit with minimum operator fatigue safely to a pre-defined point and covertly deploy and retrieve SEALS. To meet these operational needs, these platforms require upgra ...

    STTR Phase II 2017 Department of DefenseSpecial Operations Command
  5. Open Call for Innovative Defense-Related Dual-Purpose Technologies/Solutions with a Clear Air Force Stakeholder Need

    SBC: AI.Reverie, Inc.            Topic: AF192001

    AI.Reverie’s simulation platform leverages the power of synthetic data to significantly improve the performance of mission critical vision algorithms. By generating fully annotated synthetic data at scale, the platform offsets the costs and time to label real world images and videos.  The program objectives are focused on improving the accuracy of computer vision algorithms for object de ...

    SBIR Phase II 2020 Department of DefenseAir Force
  6. Engineering Sensors for Towed Array Reliability

    SBC: 3 Phoenix, Inc.            Topic: N111075

    The operational need for this improved towed array technology insertion initiative stems from the necessity to improve availability and reliability of towed arrays in use on submarines in both shallow and deep water environments, and represents a critical submarine capability enhancement. The proposed project will extend and transition the telemetry, packaging and iPEN technologies developed und ...

    SBIR Phase II 2014 Department of DefenseNavy
  7. Modeling and Prediction of Asymmetric Threat Learning Processes

    SBC: Commonwealth Computer Research Inc            Topic: N06077

    CCRIs Phase I research efforts on Modeling and Prediction of Asymmetric Threat Learning Processes have shown the potential for learning models to improve predictive accuracy. The methodology developed proved to be robust and provides improvements in prediction, even when parameter estimation for the structural equation models was not significant. The Phase I results suggest that the development o ...

    SBIR Phase II 2008 Department of DefenseNavy
  8. Mobile Onboard Nexus for Autonomy and Radical Computation Handling (MONARCH)

    SBC: DZYNE TECHNOLOGIES, LLC            Topic: AF141181

    ABSTRACT: DZYNE Technologies, Inc., proposes a Phase II SBIR effort to continue development of MONARCH, a Mobile Onboard Nexus for Autonomy and Radical Computation Handling. MONARCH shall provide an elastic, embedded computing capability for hosting operationally-relevant classes of software applications onboard manned and unmanned systems through the interoperation of distributed, networked compu ...

    SBIR Phase II 2017 Department of DefenseAir Force
  9. Advanced Communications at Speed and Depth

    SBC: PROGENY SYSTEMS, LLC            Topic: N08219

    The objective of this Phase II SBIR is to develop a transducer using next generation ceramic technology, and wideband amplifier with enhanced magnetics to form a system that will operate in conjunction with spread spectrum digital communications software to enable acoustic communications from a submarine while operating at speed and depth. The research innovation behind project lies in the use of ...

    SBIR Phase II 2018 Department of DefenseNavy
  10. Distributed Sensor System Innovations- CPP

    SBC: 3 Phoenix, Inc.            Topic: N07070

    The objectives for this Phase II effort follow logically from the Phase I proposal and the ground work laid in Phase I. The overarching goal is to prove a radically different approach to sensor packaging which offers a quantum leap in performance, cost reduction and manufacturability improvement. Preliminary testing results from Phase I indicate that the alternative technical approach to telemetry ...

    SBIR Phase II 2011 Department of DefenseNavy
US Flag An Official Website of the United States Government