You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. LOW COST ALTERNATE LAUNCH SYSTEM FOR FLIGHT TESTING

    SBC: Space Data Corp.            Topic: N/A

    A STUDY OF THE USE OF A MULTI-STAGE SOUNDING ROCKET AS A LOW COST ALTERNATE LAUNCH SYSTEM FOR FLIGHT TESTING OF SMALL REENTRY VEHICLES AT THE KWAJALEIN MISSILE RANGE (KMR) WILL BE PERFORMED. A COMBINATION OF GUIDED AND UNGUIDED STAGES IS CONTEMPLATED. A RELATIVELY LOW-COST, HIGH-PERFORMANCE SOLID MOTOR IS REQUIRED FOR THE FINAL VELOCITY STAGE. SELECTION OF A LAUNCH SITE IN THE NEAR VICINITY OF KMR ...

    SBIR Phase II 1989 Department of DefenseAir Force
  2. FABRICATION AND TESTING OF A LOW COST PULSE JET

    SBC: M-DOT Aerospace            Topic: N/A

    THIS DOCUMENT DESCRIBES A PROPOSAL BY M-DOT INC. TO DESIGN, FABRICATE AND TEST A 110 LB. THRUST PULSEJET ENGINE TO BE USED AS A RESEARCH TOOL TO EVALUATE THE FOLLOWING CONCEPTS: 1. MICROPROCESSOR CONTROLLED ELECTRIC FUEL INJECTION. 2. HIGH DURABILITY VALVED AND VALVELESS INLET DESIGNS. 3. OXYGENATED FUEL BLENDS FOR INCREASED THRUST. THE PHASE I PROGRAM WOULD ACCOMPLISH THE FOLLOWING TASKS: 1. DESI ...

    SBIR Phase II 1993 Department of DefenseArmy
  3. EROSION RESISTANT CERAMIC COMPOSITE CONDUCTIVE RAIL

    SBC: ATS-MER, LLC            Topic: N/A

    HYPERVELOCITY LAUNCHER SYSTEMS PLACE SEVERE DEMANDS ON BOTH THE INSULATOR AND CONDUCTIVE RAILS. RECENTLY A WHISKER REINFORCED ALUMINA INSULATOR RAIL SHOWED SUPERIOR EROSION PERFORMANCE IN RAIL GUN TEST, HOWEVER, THE CONDUCTIVE COPPER RAILS ERODED SEVERELY AS WELL AS CREATE AN ANTICIPATED EXPANSION PROBLEM IN FULL SCALE SYSTEMS. IT IS ANTICIPATED A CONDUCTIVE CERAMIC, TIB(2), COMPOSITE CAN PERFORM ...

    SBIR Phase II 1989 Department of DefenseAir Force
  4. LOW CAPACITY RELIQUEFIER FOR STORAGE OF CRYOGENIC FLUIDS

    SBC: General Pneumatics Corporation            Topic: N/A

    A SELF CONTAINED LIQUEFIER IS BEING DEVELOPED TO RECONDENSE THE VAPOR BOILOFF FROM THE CRYOGENIC LIQUID STORAGE DEWARS OF LONG LIFE SPACE POWER SYSTEMS. THE PROOF-OF-PRINCIPLE LIQUEFIER FOR THE CHALLENGING DUTY OF HELIUM LIQUEFACTION IS A SMALL LOW CAPACITY (10 LITRES LIQUID HELIUM PER DAY) UNCOMPLICATED SYSTEM HAVING A LONG MAINTENANCE FREE OPERATING LIFE AND LOW INITIAL COST WITH MODEST AUXILIAR ...

    SBIR Phase II 1989 Department of DefenseMissile Defense Agency
  5. RESEARCH IN ARTIFICIAL INTELLIGENCE FOR NON-COMMUNICATIONS ELECTRONIC WARFARE SYSTEMS

    SBC: Vista Research, Inc.            Topic: N/A

    THIS PROPOSAL PROPOSES TO INVESTIGATE THE FEASIBILITY OF DEVELOPING A RAPID DEPLOYMENT CAPABILITY FOR TACTICAL COMBAT MODELS. THE CAPABILITY IS NECESSARY TO SUPPORT SAMPLING OF ALTERNATIVE SIMULATED TACTICAL DEPLOYMENTS (STDS), WHICH IS PRESENTLY NOT FEASIBLE TO DO ON A SCALE AND LEVEL OF DETAIL REQUIRED BY EXISTING LARGE-SCALE (THEATER LEVEL OR CORPS LEVEL) TACTICAL COMBAT MODELS. WITHOUT THIS CA ...

    SBIR Phase II 1989 Department of DefenseArmy
  6. STOICHIOMETRIC DIESEL ENGINE

    SBC: ADIABATICS INC            Topic: N/A

    A FEASIBILITY STUDY ON THE DEVELOPMENT OF A STOICHIOMETRIC DIESEL ENGINE IS PROPOSED USING THE THERMAL IGNITION COMBUSTION CHAMBER. THE ADIABATIC DIESEL ENGINE WITHOUT WATER OR AIR COOLING ALLOWS THE THERMAL IGNITION CHAMBER TO STORE HEAT DURING COMBUSTION AND RELEASE THE ENERGY FOR IGNITION IN THE FOLLOWING CYCLE. INJECTION OF FUEL ON TO 1800-2000 DEG. F WALL TEMPERATURE WILL PREPARE THE FUEL FOR ...

    SBIR Phase II 1989 Department of DefenseArmy
  7. NOVEL AIR GAP INSULATED PISTON

    SBC: ADIABATICS INC            Topic: N/A

    ADIABATICS, INC. IS PLEASED TO PROPOSE A RESEARCH PROGRAM TO DESIGN AN OPTIMUM PISTON FOR A HIGH TEMPERATURE MILITARY ENGINE. ADIABATICS, INC. HAS BEEN CONDUCTING A PROGRAM FOR TACOM TITLED "DEVELOPMENT OF TRIBOLOGICAL SYSTEMS AND ADVANCED HIGH TEMPERATURE IN-CYLINDER COMPONENTS FOR ADVANCED HIGH TEMPERATURE DIESEL ENGINES" FOR THE PAST FIVE YEARS. BASED ON OUR EXPERIENCE WITH DESIGNING COMPONENTS ...

    SBIR Phase II 1993 Department of DefenseArmy
  8. MODEL FUSION

    SBC: Simex Systems & Software            Topic: N/A

    WE PROPOSE TO DEVELOP AN EXPERT GUIDED APPROACH TO CONSTRUCTING HIGH LEVEL MODELS USING DETAILED MODELS OF ARMY COMMUNICATIONS SYSTEMS IN THE CECOM INVENTORY AS THE GROUND LEVEL BASIS. SPECIFIC OBJECTIVES INCLUDE: TO IDENTIFY CHARACTERISTICS OF THE CECOM MODEL INVENTORY RE- LEVANT TO SUCH MODEL FUSION, IDENTIFY APPLICABLE MODEL FUSION METHODS, AND IDENTIFY CRITERIA FOR, AND DOMAIN OF APPLICABILITY ...

    SBIR Phase II 1993 Department of DefenseArmy
  9. CONTROLLED MICROSTRUCTURAL DEVELOPMENT OF SI(3)N(4) TO ENHANCE FRACTURE TOUGHNESS

    SBC: ATS-MER, LLC            Topic: N/A

    SILICON NITRIDE IS AN ADVANCED CERAMIC MATERIAL WITH EXCEPTIONAL PROPERTIES. HOWEVER, A SEVERE PROPERTY LIMITATION IS OBSERVED IN THE LOW FRACTURE TOUGHNESS OF SI(3)N(4). THE POTENTIAL FOR UTILIZATION OF SI(3)N(4) CERAMICS IN MANY APPLICATIONS WOULD BE SIGNIFICANTLY IMPROVED IF ITS FRACTURE TOUGHNESS COULD BE INCREASED WITHOUT SACRIFICING HIGH TEMPERATURE STRENGTH. IT IS PROPOSED THAT THE ABOVE CA ...

    SBIR Phase II 1993 Department of DefenseArmy
  10. LIGHTWEIGHT SEALED PARACHUTE AND HARNESS ASSEMBLY

    SBC: Simula, Inc.            Topic: N/A

    THE CURRENT NAVY INVENTORY OF PARACHUTES USED FOR NON-EJECTION EGRESS FROM AIRCRAFT IS PRIMARILY THE NB-8 CONFIGURATION. THIS PARACHUTE SYSTEM IS RELATIVELY HEAVY AND HAS A HIGH LIFE CYCLE COST RELATED TO THE FUEL CONSUMPTION, LOSS OF PAYLOAD CAPABILITY, AND REPACKING AT 210-DAY INTERVALS. THE PROGRAM DESCRIBED IN THIS PROPOSAL WILL EXPLORE POTENTIAL CONCEPTS FOR DEVELOPMENT OF A LIGHTWEIGHT ENVIR ...

    SBIR Phase II 1989 Department of DefenseNavy
US Flag An Official Website of the United States Government