You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Active Thermal Control System Optimization

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: N152115

    The primary objectives of this effort will be the development, validation, and deployment of a software toolset capable of modeling dynamic two-phase flow systems for controls development and optimization. The toolset will be comprised of a variety of components related to two-phase flow systems with user interfaces to parameterize the component models and a variety of supporting tools for operati ...

    SBIR Phase II 2017 Department of DefenseNavy
  2. Multi-Disciplinary Dynamic Modeling Toolset for Integrated Thermal, Electrical, and Mechanical Systems

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: AF103208

    The primary objectives of the proposed effort are to enhance, expand, and validate a variable-fidelity transient multi-domain software toolset called ATTMO+ for predicting and analyzing the dynamic interactions at a mission-level timescale between electri

    SBIR Phase II 2017 Department of DefenseAir Force
  3. Crew Role-player Enabled by Automated Technology Enhancements (CREATE) Ph II.5

    SBC: SOAR TECHNOLOGY INC            Topic: N142090

    As technology continues to drive changes in Naval operations, warfighters increasingly must exercise strategies in complex team-based environments. A key to successful completion of mission operations in teams is communication. In domains where performers have highly specialized skills, the curation of shared mental models amongst crew is critical. However, current individual training capabilities ...

    SBIR Phase II 2017 Department of DefenseNavy
  4. Dynamic Vehicle Modeling Composed of Mechanical and Thermal Interaction with High-Resolution Synthetic Scenes

    SBC: SIGNATURE RESEARCH, INC.            Topic: A16008

    Advances in physics-based, multi-spectral modeling and simulation have paved the way to provide an enhanced evaluation environment for current and future weapon systems. These advancements present an opportunity to develop an equally sophisticated ground vehicle model that can dynamically interact with the physics of the scene simulations. Signature Research, Inc. details a solution to develop a g ...

    SBIR Phase II 2017 Department of DefenseArmy
  5. Broadband self-calibrated Rydberg-based RF electric-field measurement system

    SBC: RYDBERG TECHNOLOGIES INC            Topic: SB152003

    In EMC/EMI testing there is a demand for broadband (MHz to THz), self-calibrating, small, robust, and wide-dynamic-range detectors for electric fields up to about 10kV/m. Advanced field sensors are important in the expanding EMC/EMI testing industry, which serves aerospace, defense, automotive, telecommunications, safety, and security. Rydberg Technologies LLC (RT) is developing a new line of atom ...

    SBIR Phase II 2017 Department of DefenseDefense Advanced Research Projects Agency
  6. Rapid Configuration of Heterogeneous Models (RaCHeM)

    SBC: SOAR TECHNOLOGY INC            Topic: A13056

    SoarTech and our partner, the University of Michigan Center for Health Communication Research, propose to apply heterogeneous modeling to health communications to provide a means to project the effect of communication strategies on target audience behavior. We will create a prototype system for Rapid Configuration of Heterogeneous Models, RaCHeM. To support the current health communications commun ...

    SBIR Phase II 2017 Department of DefenseDefense Advanced Research Projects Agency
  7. PXAV

    SBC: SOAR TECHNOLOGY INC            Topic: N122124

    Normally, human operators are required to control and plan to direct realistic, complex systems of autonomous actors, such as multi-vehicle unmanned platforms or entities in multi-domain simulation environments. We proposed to design, to develop and to evaluate adaptive technology that reduces instructor/operator workload for planning/managing autonomous agents, enabling complex and realistic mult ...

    SBIR Phase II 2017 Department of DefenseNavy
  8. Wingman/Fieldops: Enhancing Teleoperation of Teamed Robotic Platforms

    SBC: Quantum Signal LLC            Topic: OSD13HS3

    The US Government is exploring concepts of collaborative manned-unmanned warfighting units, with soldiers controlling one or more unmanned platforms acting in cooperation as wingmen to their manned unit on the battlefield.A major challenge to this concept is how to enable effective, efficient teleoperation of multiple units under highly variable circumstances and environments.In this effort, the p ...

    SBIR Phase II 2017 Department of DefenseArmy
  9. Development of Fidelity Metrics for Image-based Missile Simulation Environments

    SBC: SIGNATURE RESEARCH, INC.            Topic: A15005

    We propose to develop a methodology and supporting tools for assessing and estimating multidimensional fidelity requirements for target and background scenes used in M&S to obtain smart munitions system performance. The overall effort in Phase II will focus on the development of a prototype toolkit that involves integrating fidelity metrics, development of test imagery, performance assessment, cor ...

    SBIR Phase II 2017 Department of DefenseArmy
  10. Amphibious Combat Vehicle Ramp Interface Modular Buoyant Kit (MBK) for Joint High Speed Vessel (JHSV) Stern Ramp

    SBC: GREAT LAKES SOUND & VIBRATION INC            Topic: N152101

    The GLSV team has developed an innovative, reliable, modular buoyant kit (MBK) that will allow the EPF/JHSV stern ramp to allow splash-off launch and recovery of amphibious vehicles during Sea State 3 conditions. The MBK will be deployable off the end of the stern cargo ramp, and will be augmented by a dynamic compensation system to mitigate damaging ramp motions due to wave action and vehicle mov ...

    SBIR Phase II 2017 Department of DefenseNavy
US Flag An Official Website of the United States Government