You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: Jx Crystals Inc.            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseArmy
  2. N/A

    SBC: Quest Integrated, LLC            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseArmy
  3. N/A

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseAir Force
  4. N/A

    SBC: INSIGHTFUL CORPORATION            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseDefense Advanced Research Projects Agency
  5. N/A

    SBC: Aculight Corporation            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseAir Force
  6. N/A

    SBC: Aculight Corporation            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseAir Force
  7. Prediction Method for Hydrodynamic Problems of Two Bodies Operating in Close Proximity

    SBC: TARGAZYME, INC.            Topic: N/A

    The Navy's plan to launch and retrieve Unmanned Undersea Vehicles (UUVs) from submarines will require precise control of the UUV when it is in close proximity to the submarine hull. The hydrodynamic forces experienced by the UUV when it is near the submarine are significantly different from those it experiences when it is far away. In order to design a successful control system for the UUV, theref ...

    SBIR Phase II 1995 Department of DefenseNavy
  8. N/A

    SBC: ADIABATICS INC            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseArmy
  9. Programmable PCM Encoder

    SBC: Waterjet Technology Inc            Topic: N/A

    A programmable, pulse code modulation (PCM) encoder for telemetry applications is proposed. Existing encoders do not provide for on-board processing of signals and, in general, are not very sophisticated as compared to current available technology. We propose development of a modular digital signal processor-based system that is configurable via a graphical user interface. A standard set of on-boa ...

    SBIR Phase II 1995 Department of DefenseAir Force
  10. N/A

    SBC: SADDLEBACK AEROSPACE            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseAir Force
US Flag An Official Website of the United States Government