List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for the given year is not complete until April of the following year. Annual Reports data is a snapshot of agency reported information for that year and hence might look different from the live data in the Awards Information charts.

  1. Submarine Shipboard Power Supply Bridge

    SBC: P C KRAUSE AND ASSOCIATES INC            Topic: N171075

    The objective of this effort is to construct and test a 40 kW UPS with at least 100ms of holdup time, integrated into a standard 19 inch rack mount enclosure with 4U (7 inch) height, and designed to meet electrical and mechanical/shock specifications required for naval shipboard application. Traditional UPS applications are typically not optimized for weight and volume, and utilize bulky lead-acid ...

    SBIR Phase II 2019 Department of DefenseNavy
  2. Optical Device for Sorting Particles by Size

    SBC: En'urga Inc.            Topic: NA

    This Phase II SBIR project will continue the development of an optical sorter that will be used to estimate drop sizes in sprays. The optical sorter will determine the size of drops in the 0.1 to 10 microns range. Drops in this size range are prevalent in the automobile industry, where the fuel injection pressures have increased tremendously over the past two decades. These newer injectors provide ...

    SBIR Phase II 2018 Department of CommerceNational Institute of Standards and Technology
  3. Reduced Cavitation, High Efficiency Outboard Propulsors for Small Planing Craft

    SBC: CANDENT TECHNOLOGIES INCORPORATED            Topic: N17AT019

    The Candent Technologies Reduced Cavitation, High Efficiency Outboard Propulsor for Small Planing Craft Phase II program is structured to develop an advanced waterjet propulsor for the Combat Rubber Raiding Craft (CRRC). This new axial flow waterjet propulsion system is designed as a bolt on assembly that replaces the lower unit of the existing MFE 55 outboard motor. This new propulsion system inc ...

    STTR Phase II 2018 Department of DefenseNavy
  4. High Density, High Efficiency Electrical Power Generation

    SBC: P C KRAUSE AND ASSOCIATES INC            Topic: N103207

    The movement to more-electric architectures during the past decade in military and commercial airborne systems continues to increase the complexity of designing and specifying the electrical power system in such architectures. In particular, electrical starter/generators (ES/G) on airborne systems have become much more complex in terms of design due to growth in electrical power and energy require ...

    SBIR Phase II 2018 Department of DefenseNavy
  5. Aircraft Electrical Power System Diagnostics and Health Management

    SBC: P C KRAUSE AND ASSOCIATES INC            Topic: N06T007

    The main focus of the proposed SBIR Phase II effort is the expansion of the EPIDS diagnostic and prognostic monitoring capability to the V-22 constant frequency generators. The design of the EPIDS for the variable frequency generators will be leveraged and modified with additional sensors and updated with diagnostics algorithms specific to the CFG. PCKA plans to test the CFG EPIDS in a laboratory ...

    SBIR Phase II 2017 Department of DefenseNavy
  6. Active Thermal Control System Optimization

    SBC: P C KRAUSE AND ASSOCIATES INC            Topic: N152115

    The primary objectives of this effort will be the development, validation, and deployment of a software toolset capable of modeling dynamic two-phase flow systems for controls development and optimization. The toolset will be comprised of a variety of components related to two-phase flow systems with user interfaces to parameterize the component models and a variety of supporting tools for operati ...

    SBIR Phase II 2017 Department of DefenseNavy
  7. High Power Density, High Efficiency Advanced Generator for DEW Systems

    SBC: CANDENT TECHNOLOGIES INCORPORATED            Topic: N132086

    Solid state RF and millimeter wave weapons systems require substantial power to operate. Pure solid state systems have limited energy density and require charging over the typical use cycle. The directed energy system must be compact enough to mount on a vehicle such as a HMMWV, a small trailer or a structure such as found within an embassy compound. Current power systems are much too large and he ...

    SBIR Phase II 2015 Department of DefenseNavy
  8. Efficient Light Weight Propulsion for Small Unmanned Surface Vehicle

    SBC: CANDENT TECHNOLOGIES INCORPORATED            Topic: N121054

    The Phase I of this SBIR completed the design, fabrication, and demonstration of a prototype heavy fuel engine for the Class X USV, and also completed the preliminary design of the waterjet propulsor as well as the preliminary design of the systems and the integration with the hull. Phase II of the SBIR will complete the final design of the waterjet, continue the development of the engine and its ...

    SBIR Phase II 2014 Department of DefenseNavy
  9. Improving Commercial Fish Meal Free Aquaculture Diets

    SBC: Bell Aquaculture            Topic: 92

    Domestic US aquaculture is moving toward fishmeal replacement in aquafeeds with a variety of alternative protein sources including plant-based, terrestrial and marine proteins. In our Phase I work we showed the feasibility of modifying the protein quality of several alternate protein sources, specifically animal byproduct meals, and its potential significant impacts on marine fish production. Th ...

    SBIR Phase II 2014 Department of CommerceNational Oceanic and Atmospheric Administration
  10. A Noninvasive Sensor/Control Suite for Health Monitoring and Extended Life of Aircraft Generation Systems

    SBC: P C KRAUSE AND ASSOCIATES INC            Topic: N06T007

    Failures in aircraft electrical power systems can compromise the readiness, safety, and capabilities of the war-fighter. Furthermore, if the root cause for the failure cannot be quickly identified, this can lead to increased maintenance costs and potential downtime for the aircraft. In this effort, enhanced diagnostic and prognostic algorithms will be implemented in a hardware unit to minimize suc ...

    STTR Phase II 2013 Department of DefenseNavy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government