You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A Network Sensor-Based Defense Framework for Active Network Security Situation Awareness and Impact Mitigation
SBC: INTELLIGENT FUSION TECHNOLOGY, INC. Topic: AF112053ABSTRACT: Cyber-attacks are increasing in frequency, impact, and complexity, which demonstrate extensive vulnerabilities of networks with the potential for catastrophic damage. Defending against these cyber-attacks requires network security situation awareness (SA) through distributed collaborative monitoring, detection, and mitigation. In the Phase I project, IFT team has developed a Network Sen ...
SBIR Phase II 2014 Department of DefenseAir Force -
Laser Survivability Model
SBC: The Survice Engineering Company LLC Topic: AF112203ABSTRACT: The goal of this SBIR program is to develop a validated model that predicts ignition of composite aircraft fuel tanks when engaged by a High Energy Laser (HEL). The primary focus of the Phase I research and development program was to develop a baseline capability for modeling laser-initiated fire ignition and sustainment for composite aircraft fuel tanks. The SURVICE Engineering Compa ...
SBIR Phase II 2014 Department of DefenseAir Force -
AUTO-SCAN: Inlet and Exhaust Damage Registration Sensor
SBC: Intelligent Automation, Inc. Topic: AF121C125ABSTRACT: Current methods for inspecting aircraft engine inlet and exhaust cavities are labor intensive and error prone. Airmen crawl into ducts looking for defects, trace suspected sites on Mylar sheets noting their position relative to cavity features, and manually enter the data into an aircraft assessment system. Technology that can reduce inspection times and eliminate sources of human err ...
SBIR Phase II 2014 Department of DefenseAir Force -
Surgical Skills Training and Assessment Instrument (SUSTAIN) Mobile App
SBC: Anthrotronix, Inc. Topic: N101094This Subsequent Phase II Proposal is an extension of Phase II contract N00014-11-C-0420. The overall objective of the proposed Subsequent Phase II effort is to develop and provide initial validation for a mobile training platform and framework that will support optimized refresher training for a variety of medical skills. Maintenance of specialized skills during periods of nonuse presents a signif ...
SBIR Phase II 2014 Department of DefenseNavy -
Bio-Inspired Visual Navigation: From Landmarks via Bearing to Controls
SBC: Intelligent Automation, Inc. Topic: A12aT030The proposed Bio-Inspired Visual Navigation System will enable UGVs to operate semi-autonomously with minimal input from an operator even in degraded communication environments. Semi-autonomous landmark-based navigation in low-texture indoor environments is difficult due to the lack of distinctive micro-features needed by conventional algorithms such as SIFT and SURF. In Phase I, Intelligent Aut ...
STTR Phase II 2014 Department of DefenseArmy -
Desert Fauna Detection and Tracking System
SBC: COHERENT TECHNICAL SERVICES, INC. Topic: AF112193ABSTRACT: Identifying the presence of endangered and threatened species is crucial to complying with Environmental Protection Agency regulations. Each year military reservations spend large amounts of resources in time, materials, and manpower in identifying if endangered or threatened species are present. Current methods of determining presence of endangered and threatened species are labor int ...
SBIR Phase II 2014 Department of DefenseAir Force -
Helicopter Hostile Fire Indicator (HFI) Sensor Development
SBC: SYNTONICS LLC Topic: A12035Syntonics has demonstrated the feasibility of the Staring Projectile Detection Radar (SPiDR). SPiDR is a stealthy, ultra wideband (UWB) noise radar system. In Phase II we will design and fabricate a multi-channel SPiDR prototype system with detection range of at least 100-m (300-m objective). Progressively realistic laboratory and live fire tests are performed with various projectiles to evaluate ...
SBIR Phase II 2014 Department of DefenseArmy -
Spread Spectrum Techniques for Sonar Ping Technology
SBC: SIGNAL SYSTEMS CORPORATION Topic: N101005This project will focus on software and firmware development that further improves the search and detection phase of Air ASW submarine prosecution using pulsed SSPT waveforms. These enhancements will allow for at least four simultaneous sources to broadcast simultaneously. Estimated probability of detection will increase in difficult submarine detection conditions and search times will be reduced ...
SBIR Phase II 2014 Department of DefenseNavy -
Material Multi-Solution for Hypersonic Systems
SBC: Custom Analytical Engineering Systems, I Topic: N101067The work to be conducted under this proposed effort will include design, analysis, and manufacture of composite sabot/pusher assemblies for US Navy specified sub-caliber gun launched HVP flight configurations. The overall scope of work will be divided into a Base, Option 1, and Option 2 efforts which will progressively mature the sabot/pusher design toward tactical configurations consistent with N ...
SBIR Phase II 2014 Department of DefenseNavy -
Spatially-Distributed Electron Beam Technology for Millimeter-Wave Amplifiers
SBC: BEAM-WAVE RESEARCH, INCORPORATED Topic: N121046BWRI proposes the full scale development (fabricate, assemble, and test) of a three-beam electron gun for used in future advanced millimeter-wave amplifiers in the proposed Phase-II program. Under the Phase-I base program, a baseline design study establishing the gun feasibility was completed. Results indicate the proposed gun can generate 3 x 0.55 A electron beams at 20 kV for a total of 33 kW of ...
SBIR Phase II 2014 Department of DefenseNavy