You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Recovery Act- Advanced Technology High Efficiency Low Cost Small Turbine for DG and CHP

    SBC: CANDENT TECHNOLOGIES INCORPORATED            Topic: 04d

    Efficient and environmentally friendly power generation is a national goal. While large scale power plants are demonstrating thermal efficiencies of 50%, the cost and environmental impact of increasing the size of current power plants and expansion of the grid to distribute this power are making this approach increasingly difficult and expensive. Alternative distributed power gen systems driven by ...

    SBIR Phase II 2010 Department of Energy
  2. A Miniature Non-Contact Rail Temperature Sensor

    SBC: En'urga Inc.            Topic: 081FR2

    This SBIR project will develop a low cost sensor to obtain rail temperatures from a moving train. The two innovative parts of the proposed sensor are (1) a rugged four wavelength high frequency sensor that accurately measures the natural radiation emitted by the rails, and (2) an advanced algorithm that provides a emissivity compensated temperature from these measurements. The feasibility of the ...

    SBIR Phase II 2010 Department of Transportation
  3. Grid 2.0: Collaboration and Sharing on the Grid

    SBC: GALOIS, INC.            Topic: 54c

    Grid computing, the application of many loosely-coupled computers in federation to provide shared resources makes significant compute or storage capabilities accessible to distributed teams of researchers. In doing so, it also poses a challenge: How do distributed teams collaborate effectively with these resources? This project will determine how best to apply social and collaboration software ...

    SBIR Phase II 2010 Department of Energy
  4. Advanced Technologies for Discrete-Parts Manufacturing

    SBC: IMAGINESTICS, LLC            Topic: DLA07001

    DoD agencies are facing growing challenge of maintaining aging Warfighter Systems, while reducing procurement costs of discrete-parts. One key hindrance to ensuring readiness is discrete part procurement. When procuring parts, tech data package which is provided to the suppliers during pre and post-award contains raster drawings which are often of very poor quality. Several suppliers do not provid ...

    SBIR Phase II 2010 Department of DefenseDefense Logistics Agency
  5. Recovery Act- Controller for Charging/Storage System

    SBC: Peregrine Power LLC            Topic: 07b

    The nation

    SBIR Phase II 2010 Department of Energy
  6. High Efficiency, Large-Area, 1550 nm InGaAs Photodiodes

    SBC: VOXTEL, INC.            Topic: N/A

    A back-illuminated planar InGaAs photodiode tested to have 95% quantum effiiency (QE) at 1550 nm, area greater than 1 mm2, low capacitance (125 MHz) will be improved. Although the existing Phase I device exhibited bulk material dark current generation better than commercially available devices, the sidewall-generated dark current was found to dominate the noise equiva ...

    SBIR Phase II 2010 Department of CommerceNational Institute of Standards and Technology
  7. High-Dynamic-Range, Rad-Hard, Time-Resolved, Correlated X-ray Photon Detector

    SBC: VOXTEL, INC.            Topic: 06c

    90087S09-II Expanding user demand for X-ray beamline time for science experiments in diverse fields necessitates expensive new beamlines, or the more efficient use of existing resources. Detectors that collect more data, with efficient on-chip and off-chip processing of the resulting data streams, represent the most economical solution to this problem. The innovation is addressing the need for s ...

    SBIR Phase II 2010 Department of Energy
  8. Recovery Act- Lucid Energy Technologies In-conduit Hydropower

    SBC: Lucid Energy Technologies, Llp            Topic: 06b

    The U.S. faces increasing vulnerability as it depends on expensive, non renewable energy supplies from politically unstable regions. The most common renewable energy sources - wind, solar, geothermal, and traditional hydroelectric - are not growing at an adequate pace to meet demand. The U.S. needs additional innovative, pragmatic alternatives to achieve energy security.Lucid Energy Technologies, ...

    SBIR Phase II 2010 Department of Energy
  9. Novel Fiber-Based Adsorbent Technology

    SBC: Chemica Technologies, Inc            Topic: N/A

    40927 November 18, 1996 Chemica Technologies, Inc. Separation processes for removal of heavy metals from contaminated water is needed for site remediation at DOE facilities. Conventional adsorbent technologies have limitations that preclude their widespread use in the treatment of metal-contaminated wastewater. Specifically, many adsorbents lack capacity ...

    SBIR Phase II 1997 Department of Energy
  10. Rapid Scanning Near-Infrared/Infrared Spectrometer

    SBC: En'urga Inc.            Topic: N/A

    This project involves a feasibility study for a rapid scanning near-infrared/infrared spectrometer for transient, simultaneous measurements of CO2 and H20 concentrations, soot volume fractions and temperatures. Such measurements can lead to improved understanding of the structure of turbulent and laminar flames. A commercial instrument that can reliably provide simultaneous gas concentrtaion, so ...

    SBIR Phase II 1997 Department of Commerce
US Flag An Official Website of the United States Government