You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Recovery Act- Advanced Technology High Efficiency Low Cost Small Turbine for DG and CHP

    SBC: CANDENT TECHNOLOGIES INCORPORATED            Topic: 04d

    Efficient and environmentally friendly power generation is a national goal. While large scale power plants are demonstrating thermal efficiencies of 50%, the cost and environmental impact of increasing the size of current power plants and expansion of the grid to distribute this power are making this approach increasingly difficult and expensive. Alternative distributed power gen systems driven by ...

    SBIR Phase II 2010 Department of Energy
  2. Grid 2.0: Collaboration and Sharing on the Grid

    SBC: GALOIS, INC.            Topic: 54c

    Grid computing, the application of many loosely-coupled computers in federation to provide shared resources makes significant compute or storage capabilities accessible to distributed teams of researchers. In doing so, it also poses a challenge: How do distributed teams collaborate effectively with these resources? This project will determine how best to apply social and collaboration software ...

    SBIR Phase II 2010 Department of Energy
  3. Recovery Act- Controller for Charging/Storage System

    SBC: Peregrine Power LLC            Topic: 07b

    The nation

    SBIR Phase II 2010 Department of Energy
  4. High Efficiency, Large-Area, 1550 nm InGaAs Photodiodes

    SBC: VOXTEL, INC.            Topic: N/A

    A back-illuminated planar InGaAs photodiode tested to have 95% quantum effiiency (QE) at 1550 nm, area greater than 1 mm2, low capacitance (125 MHz) will be improved. Although the existing Phase I device exhibited bulk material dark current generation better than commercially available devices, the sidewall-generated dark current was found to dominate the noise equiva ...

    SBIR Phase II 2010 Department of CommerceNational Institute of Standards and Technology
  5. High-Dynamic-Range, Rad-Hard, Time-Resolved, Correlated X-ray Photon Detector

    SBC: VOXTEL, INC.            Topic: 06c

    90087S09-II Expanding user demand for X-ray beamline time for science experiments in diverse fields necessitates expensive new beamlines, or the more efficient use of existing resources. Detectors that collect more data, with efficient on-chip and off-chip processing of the resulting data streams, represent the most economical solution to this problem. The innovation is addressing the need for s ...

    SBIR Phase II 2010 Department of Energy
  6. Recovery Act- Lucid Energy Technologies In-conduit Hydropower

    SBC: Lucid Energy Technologies, Llp            Topic: 06b

    The U.S. faces increasing vulnerability as it depends on expensive, non renewable energy supplies from politically unstable regions. The most common renewable energy sources - wind, solar, geothermal, and traditional hydroelectric - are not growing at an adequate pace to meet demand. The U.S. needs additional innovative, pragmatic alternatives to achieve energy security.Lucid Energy Technologies, ...

    SBIR Phase II 2010 Department of Energy
  7. Expressive Integrity Constraint Validation with OWL

    SBC: Clark & Parsia, LLC            Topic: N/A

    We propose to develop a commercially adequate, robust and perfomant OWL-based Integrity Constraint (IC) validation system with several innovations, including novel debugging and explanation support for data integrity errors; incremental and optimized validation of data integrity; and a unified system for validating structured, semi-structured, and semantic data. A rigorous and formal specification ...

    SBIR Phase II 2009 Department of CommerceNational Institute of Standards and Technology
  8. Demonstration of Advanced Technology for Surface Processing of Oil Shale

    SBC: Combustion Resources            Topic: N/A

    U.S. and world petroleum supplies are limited, causing substantial increases and fluctuations in the cost of liquid fuels and national energy insecurity. If the vast western oil shale reserves could be economically and cleanly recovered, the country¿s transportation fuel problems would be alleviated. Earlier shale surface processes used complicated and costly equipment, released substantial CO2 ...

    SBIR Phase II 2009 Department of Energy
  9. Development of a Thermally and Electrically Self-Sustaining Hydrogen Generation System Directly Using Petcoke

    SBC: Materials and Systems Research, Inc.            Topic: N/A

    Hydrogen has been widely used by petroleum refineries in upgrading processes necessary to facilitate the hydrotreating/catalytic hydrocracking of heavy hydrocarbon molecules and the reduction of sulfur content. However, the building of the infrastructure needed to transport hydrogen from central production facilities to small refineries is cost prohibitive. This project will develop an advanced, ...

    SBIR Phase II 2009 Department of Energy
  10. Advanced Coal Research- Sealing Systems for High Temperature SOFC

    SBC: Materials and Systems Research, Inc.            Topic: N/A

    In planar Solid Oxide Fuel Cells (SOFC), separation of the anode and cathode side gases are achieved by hermetic seals. These seals may be rigid, compressive, or compliant. However, the design of improved sealing materials must address two major challenges: (1) mechanical stability of the seals in the face of thermal cycling, and (2) chemical stability with respect to the metallic interconnect. ...

    SBIR Phase II 2009 Department of Energy
US Flag An Official Website of the United States Government