You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Recovery Act- Advanced Technology High Efficiency Low Cost Small Turbine for DG and CHP
SBC: CANDENT TECHNOLOGIES INCORPORATED Topic: 04dEfficient and environmentally friendly power generation is a national goal. While large scale power plants are demonstrating thermal efficiencies of 50%, the cost and environmental impact of increasing the size of current power plants and expansion of the grid to distribute this power are making this approach increasingly difficult and expensive. Alternative distributed power gen systems driven by ...
SBIR Phase II 2010 Department of Energy -
Grid 2.0: Collaboration and Sharing on the Grid
SBC: GALOIS, INC. Topic: 54cGrid computing, the application of many loosely-coupled computers in federation to provide shared resources makes significant compute or storage capabilities accessible to distributed teams of researchers. In doing so, it also poses a challenge: How do distributed teams collaborate effectively with these resources? This project will determine how best to apply social and collaboration software ...
SBIR Phase II 2010 Department of Energy -
Multiple Digital Camera Mount with FMC
SBC: Aerial Imaging Solutions Topic: 817NOAA uses large-format aerial film cameras to collect data for monitoring marine mammal populations protected under the Marine Mammal Protection Act and the U.S. Endangered Species Act. Historically, the major users of these cameras have been the military and government agencies. As these users move to newer technology, manufacturers are ending the production of aerial films and camera parts. Cons ...
SBIR Phase II 2010 Department of Commerce -
A Stochastic Integration Toolkit fo rComprehensive Global Weather and Climate Models
SBC: Argos Intelligence, LLC Topic: 823Stochastic parameterization of large scale models is becoming an important tool for evaluating climate predictability and for enabling accurate representation of effects of micro-scale and short time physics on long time climate statistics. The models currently used to evaluate climate risk do not incorporate these stochastic effects, but represent multi-year development and collaboration between ...
SBIR Phase II 2010 Department of Commerce -
Recovery Act- Scale-Up of Nanopowder Manufacturing Via Cost-Effective, Low Carbon-Footprint Process
SBC: ENGI-MAT CO Topic: 09bIn order to commercialize high-performance nanomaterials-enabled energy devices such as batteries, super-capacitors, photovoltaics, catalysts and lasers, there is a dire need for a low-cost, energy-efficient nanomaterials manufacturing process with a low-carbon footprint. Development of nanomaterials production technologies that meet this need, will contribute to the resurgence of the US manufactu ...
SBIR Phase II 2010 Department of Energy -
Anti-Breakdown Coatings for High-Gradient Accelerator Structures
SBC: Omega-P, Inc. Topic: 39aDevelopment of accelerator structures that can sustain acceleration gradients up to 150 MeV/m are required in order to build a future multi-TeV collider with an energy reach beyond present or planned electron-positron colliders. Limitations for operation with high acceleration gradient arise from RF breakdown. High-melting-point insulated coatings are to be applied first to test samples and to p ...
STTR Phase II 2010 Department of Energy -
Coaxial Two-Channel Dielectric Wake Field Accelerator
SBC: Omega-P, Inc. Topic: 38aDevelopment of accelerator structures that can sustain acceleration gradients in the range of 150 MeV/m are required in order to build a future multi-TeV collider with an energy reach beyond present or planned electron-positron colliders. A two-channel dielectric wakefield accelerator is to be developed that could have the potential to satisfy that need. A coaxial structure consisting of two die ...
SBIR Phase II 2010 Department of Energy -
Electron Gun and Beam Collector for a FOR A 10-MW, 1.3-GHz, Low-Voltage, Multi-Beam Klystron
SBC: Omega-P, Inc. Topic: 37bDesign of a future electron-positron collider, the International Linear Collider ILC, relies upon the availability of a large number of efficient, reliable 10-MW, 1.3 GHz RF amplifiers. Existing prototype multi-beam klystrons (MBKs) for this application operate at relatively high voltage (117 KV), and are physically too large for vertical mounting in the collider tunnel. The complications attend ...
SBIR Phase II 2010 Department of Energy -
RF Cavity Chain and Magnetic Circuit for a 10-MW, 1.3-GHz, Low-Voltage, Multi-Beam Klystron
SBC: Omega-P, Inc. Topic: 37bDesign of a future electron-positron collider, the International Linear Collider ILC, relies upon the availability of a large number of efficient, reliable 10-MW, 1.3 GHz RF amplifiers. Existing prototype multi-beam klystrons (MBKs) for this application operate at relatively high voltage (117 KV), and are physically too large for vertical mounting in the collider tunnel. The complications attendin ...
SBIR Phase II 2010 Department of Energy -
Recovery Act- Controller for Charging/Storage System
SBC: Peregrine Power LLC Topic: 07bThe nation
SBIR Phase II 2010 Department of Energy