You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Application of Finger-Mounted Ultrasound Array Probes

    SBC: SONIVATE MEDICAL, INC.            Topic: A09102

    In this Phase II research, Blacktoe Medical will design, manufacture and test a finger-worn ultrasound-imaging probe, optimized for Army vascular access requirements. The vascular finger probe will simplify use and reduce the time to learn complicated ultrasound guided procedures. By leveraging human hand-eye coordination and intuitive knowledge of finger position and orientation, the probe will a ...

    SBIR Phase II 2010 Department of DefenseArmy
  2. Compact, Lightweight Magnetic Sensor for Small Unmanned Undersea Vehicles (UUV)

    SBC: SKY RESEARCH, INC.            Topic: N08218

    The objective of our Phase II work is to develop and demonstrate the Magnetic Underwater Mine (MAGNUM) confirmation sensor and associated integrated UUV sensor module. In the Phase I project, Sky Research and Geometrics explored the use of Micro-Fabricated Atomic Magnetometers (MFAM) technology to meet the Navy’s needs. The prospective MFAM sensor, data acquisition, and processing module have be ...

    SBIR Phase II 2010 Department of DefenseNavy
  3. GISARO- Phase II

    SBC: Bashpole Software, Inc.            Topic: SB091003

    Several geo-social inference concerns currently limit military stability and reconstruction operations: • Contact lists are not centrally coordinated, up to date, complete, or easily searchable • Vendor history is not maintained or combined with culture and safety information • Hand-off and coordination delays cause projects to span multiple troop cycles The proposed project answers the unde ...

    SBIR Phase II 2010 Department of DefenseDefense Advanced Research Projects Agency
  4. Cooling technology for JTRS Ground Mobile Radio (GMR) Communications Systems

    SBC: MUDAWAR THERMAL SYSTEMS INC            Topic: N08223

    The primary objective of the proposed Phase II study is to implement a new high-performance cooling technology for thermal management of the Joint Tactical Radio System (JTRS) Ground Mobile Radio (GMR). Having successfully demonstrated the effectiveness of this cooling concept during the Phase I study, the proposed work will focus on determining all required cooling system hardware using an actual ...

    SBIR Phase II 2010 Department of DefenseNavy
  5. Vehicle Payload Detection at Low Speeds through Weigh-in-Motion

    SBC: WOLF TECHNICAL SERVICES INC            Topic: A09098

    A Weigh-in-Motion (WIM) system is being developed that will deploy in or on roadways of all types and accurately measure and report weights of crossing vehicles, including total vehicle weight and individual axle and wheel weights. The innovation in the system is that it senses horizontal (lateral and longitudinal) forces at each wheel and uses those measurements to correct for vehicle weight shi ...

    SBIR Phase II 2010 Department of DefenseArmy
  6. Nonlinear Interaction of Impulsive Acoustic/Hydrodynamic Sources and Natural Ocean Inhomogeneities

    SBC: Radio-Hydro-Physics LLC            Topic: N09T002

    This program will encompass two main thrusts: First, development of numerical methods for calculation of the scattering from random surfaces which does not use any approximate analytical solutions. This method is suitable for calculations of the radar back scattering for a wide range of grazing angles, including low grazing angles. Second, development of data assimilation techniques for incorporat ...

    STTR Phase II 2010 Department of DefenseNavy
  7. Interceptor Seekers

    SBC: VOXTEL, INC.            Topic: MDA08002

    A 128 x 128-format avalanche photodiode (APD) focal plane array (FPA), including a low-power dual-mode readout integrated circuit (ROIC) and low excess noise, high gain (M>1,200) will be developed for laser radar (LADAR) applications requiring reduced SWAP. The FPA gives LADAR seekers an advanced active tracking sensor capability, providing a sufficiently wide field of regard (FOR) to eliminate th ...

    SBIR Phase II 2010 Department of DefenseMissile Defense Agency
  8. Out-of-Autoclave Composite Manufacturing of Missile Structures with Carbon Foam Tooling

    SBC: TOUCHSTONE RESEARCH LABORATORY, LTD.            Topic: MDA04111

    The Missile Defense Agency (MDA) has identified a need to reduce weight and improve manufacturability to insure cost effectiveness for structural components of its missile interceptors. Touchstone Research Laboratory, Ltd. (Touchstone) and San Diego Composites (SDC) have teamed to combine their respective tooling and composite materials technologies to achieve this goal. Touchstone has developed a ...

    SBIR Phase II 2010 Department of DefenseMissile Defense Agency
  9. Littoral, Deployable, Modular, Sensor (LDMS) System

    SBC: SKY SIGHT TECHNOLOGIES, LLC            Topic: N08059

    The proposed project will create an innovative sensor system to augment an outer ring of defense used for queuing, classifying, and tracking go-fast boats, small and commercial craft, swimmers and divers that are a threat to harbors, anchorages, and other high value assets. The Littoral, Deployable, Modular Sensor (LDMS) system will be part of the Navy’s deployable capability in locations where ...

    SBIR Phase II 2010 Department of DefenseNavy
  10. Advanced Technologies for Discrete-Parts Manufacturing

    SBC: IMAGINESTICS, LLC            Topic: DLA07001

    DoD agencies are facing growing challenge of maintaining aging Warfighter Systems, while reducing procurement costs of discrete-parts. One key hindrance to ensuring readiness is discrete part procurement. When procuring parts, tech data package which is provided to the suppliers during pre and post-award contains raster drawings which are often of very poor quality. Several suppliers do not provid ...

    SBIR Phase II 2010 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government