You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Optical Device for Sorting Particles by Size

    SBC: En'urga Inc.            Topic: NA

    This Phase II SBIR project will continue the development of an optical sorter that will be used to estimate drop sizes in sprays. The optical sorter will determine the size of drops in the 0.1 to 10 microns range. Drops in this size range are prevalent in the automobile industry, where the fuel injection pressures have increased tremendously over the past two decades. These newer injectors provide ...

    SBIR Phase II 2018 Department of CommerceNational Institute of Standards and Technology
  2. Advanced Durability Systems for Unmanned Aerial Vehicle Propulsion

    SBC: IBC Materials & Technologies, LLC            Topic: SOCOM163002

    Group 2-3 UAS engines have low mean time between overhauls (MTBOs), often with as little as 200-400 hours before maintenance must be conducted.This leads to significant maintenance cost and logistics tail for deployed operations.Two-stroke piston and rotary engines for Group 2-3 platforms have common maintenance drivers such as carbon fouling, and wear of cylinders, housings and bearings.Phase I r ...

    SBIR Phase II 2018 Department of DefenseSpecial Operations Command
  3. Advanced Technologies for Discrete-Parts Manufacturing

    SBC: IMAGINESTICS, LLC            Topic: DLA07001

    DoD agencies are facing growing challenge of maintaining aging Warfighter Systems, while reducing procurement costs of discrete-parts. One key hindrance to ensuring readiness is discrete part procurement. When procuring parts, tech data package which is provided to the suppliers during pre and post-award contains raster drawings which are often of very poor quality. Several suppliers do not provid ...

    SBIR Phase II 2010 Department of DefenseDefense Logistics Agency
  4. High Efficiency, Large-Area, 1550 nm InGaAs Photodiodes

    SBC: VOXTEL, INC.            Topic: N/A

    A back-illuminated planar InGaAs photodiode tested to have 95% quantum effiiency (QE) at 1550 nm, area greater than 1 mm2, low capacitance (125 MHz) will be improved. Although the existing Phase I device exhibited bulk material dark current generation better than commercially available devices, the sidewall-generated dark current was found to dominate the noise equiva ...

    SBIR Phase II 2010 Department of CommerceNational Institute of Standards and Technology
US Flag An Official Website of the United States Government