You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Hyperspectral Image Projector Based on Liquid Crystal on Silicon Displays
SBC: BOULDER NONLINEAR SYSTEMS, INC. Topic: 825This proposal outlines the development of a precision instrument for calibrating satellite based imaging sensors – the Hyperspectral Image Projector. The HIP instrument is capable of producing realistic, standards-based satellite imagery simultaneously projecting spectral spatial scenes. This proposed effort will concentrate on the spectral engine of the HIP, with the goal of producing a long-wa ...
SBIR Phase II 2010 Department of Commerce