You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Recovery Act- Advanced Technology High Efficiency Low Cost Small Turbine for DG and CHP
SBC: CANDENT TECHNOLOGIES INCORPORATED Topic: 04dEfficient and environmentally friendly power generation is a national goal. While large scale power plants are demonstrating thermal efficiencies of 50%, the cost and environmental impact of increasing the size of current power plants and expansion of the grid to distribute this power are making this approach increasingly difficult and expensive. Alternative distributed power gen systems driven by ...
SBIR Phase II 2010 Department of Energy -
Recovery Act- Lucid Energy Technologies In-conduit Hydropower
SBC: Lucid Energy Technologies, Llp Topic: 06bThe U.S. faces increasing vulnerability as it depends on expensive, non renewable energy supplies from politically unstable regions. The most common renewable energy sources - wind, solar, geothermal, and traditional hydroelectric - are not growing at an adequate pace to meet demand. The U.S. needs additional innovative, pragmatic alternatives to achieve energy security.Lucid Energy Technologies, ...
SBIR Phase II 2010 Department of Energy -
High Pressure Specimen Chamber
SBC: TECHSHOT, INC. Topic: 814Even today as a highly technical and advanced world civilization, the physiology of deep sea fish and invertebrates continues to remain mysterious and poorly known. Past specimen containers fail to either have the size or volume needed or lack the robustness for high pressure containment of in many cases, lack the repeatability necessary to ensure a reasonable lifetime of continuous use. The Tec ...
SBIR Phase II 2009 Department of Commerce