You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 1 - 10 of 11267 results
  1. TRACKING PROGRESSIVE FRACTURE\TOWARDS RETIREMENT FOR CAUSE

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    ONE OF THE MOST COMMON PROBLEMS IN THE FIELDS OF SYSTEM DYNAMICS AND PATTERN RECOGNITION IS THE IDENTIFICATION OF THE DYNAMIC CHARACTERISTICS OF A SYSTEM ARE KNOWN THAN AN ACCURATE MATHERMATICAL MODEL COULD BE CONSTRUCTED AND A BETTER UNDERSTANDING OF THE BEHAVIOR OF THE SYSTEM COULD BE DEVELOPED. THIS WOULD HELP IMPROVE ITS DESIGN AND PERFORMANCE, MADE ITS IDENTIFICATION EASIER, FACILITATE INSPEC ...

    SBIR Phase II 1984 Department of DefenseAir Force
  2. EXPERIMENTS AND MODELING OF MULTI-COMPONENT FUEL BEHAVIOR COMBUSTION

    SBC: ADVANCED FUEL RESEARCH, INC.            Topic: N/A

    TO SATISFY AIR FORCE REQUIREMENTS TO IMPROVE AVIATION REACTIVE ATMOSPHERES IN A UNIQUE, CONTRACTOR-OWNED ENTRAINED FLOW REACTOR WITH ON-LINE, IN-SITU ANALYSIS OF VOLATILE SPECIES, TEMPERATURE AND RADIATION ABSORPTION CHARACTERISTICS BY FOURTER TRANSFORM INFRARED (FT-IR) SPECTROSCOPY. THESE DATA WILL BE USED TO EVALUATE THE APPLICATION OF EXISTING CONTRACTOR-DEVELOPED MODELS OF VAPORIZATION, PYROLY ...

    SBIR Phase II 1984 Department of DefenseAir Force
  3. DEVELOPMENT OF A MATHEMATICAL MODEL FOR PREDICTING THE PERCENTAGE FATIGUE LIFE INCREASE RESULTING FROM SHOT PEENED COMPONENTS

    SBC: Airtech Precision Shot            Topic: N/A

    CURRENT SHOT PEENING TECHNOLOGY DOES NOT OFFER THE CAPABILITY TO ACCURATELY PREDICT FATIGUE LIFE BENIFITS. RECENT TEST RESULTS IDENTIFY A HERETOFORE UNDOCUMENTED SURFACE INTEGRITY PHENOMENOM ASSOCIATED WITH PEENING AT RELATIVELY HIGH INTENSITIES WHICH HAS BEEN LINKED TO PREMATURE SPECIMEN FAILURE AT SPECIMEN FAILURE AT FATIGUE LIFE LOWER THAN THAT OF UNPEENED SPECIMEN. DATA PRESENTED BY SEVERAL AU ...

    SBIR Phase II 1984 Department of DefenseAir Force
  4. A HIGH TEMPERATURE CERAMIC COMPOSITE

    SBC: Amercom Inc            Topic: N/A

    THERE IS A NEED FOR A GOOD STRUCTURAL CERAMIC MATERIAL THAT CAN BE USED AT HIGH TEMPERATURES IN THE OXIDIZING AND CORROSIVE ATMOSPHERE OF TURBINE ENGINES AND THAT CAN BE FORMED ECONOMICALLY TO COMPLEX SHAPE WITH LOW WEIGHT. THE OBJECTIVE OF THIS RESEARCH PROJECT IS TO INVESTIGATE A NEW FAMILY OF CERAMIC COMPSITE MATERIALS THAT MAY MEET THOSE REQUIREMENTS. IT IS BASED ON CHEMICALLY VAPOR DEPOSITED ...

    SBIR Phase II 1984 Department of DefenseAir Force
  5. AERONAUTICAL SYSTEMS TECHNOLOGY

    SBC: AMERIGENICS, INC.            Topic: N/A

    THE UNDERLYING LEARNING CURVE (ULC) ANALYSIS TECHNIQUE CAN OFFER SUBSTANTIAL BENEFIT TO PERSONNEL INVOLVED WITH EVALUATIN OF THE EFFECTIVENESS OF MANUFACTURING OPERATIONS. USE OF THE TECHNIQUE IS IMPEDED BY THE AMOUNT OF COMPUTATION REQUIRED AND BY THE LEVEL OF UNDERSTANDING OF THE CONCEPT BY USERS. THE PROJECT WILL DEVELOP A USER FRIENDLY SOFTWARE SYSTEM TO ACCOMPLISHING THESE EVALUATIONS AT CONT ...

    SBIR Phase II 1984 Department of DefenseAir Force
  6. PROJECTILE PULSE GENERATOR

    SBC: ANCO ENGINEERS, INC.            Topic: N/A

    PROJECTILE PULSE GENERATOR (PPG) HAS BEEN CONCEIVED TO SATISFY ANTICIPLATED AIR FORCE REQUIREMENTS. THE PPG IS EXPLOSIVELY DRIVEN AND IS INTENDED TO MEET THE REQUIRMENTS STIPULATED IN THE SBIR

    SBIR Phase II 1984 Department of DefenseAir Force
  7. NOVEL APPROACHES TO FASIL POLYMERS

    SBC: AMT, INC.            Topic: N/A

    FLUORROALKYLARYLENESILOXANYLENE (FASIL) POLYMERS POSSESS EXCELLENT THEMAL STABILITY, LOW EMPERATUE, AND HYDROCARBON SOLVENT RESISTANCE. POLYMERS BASED ON FASIL HAVE EXTENSIVE PROMISE FOR MILITARY AND COMMERCIAL AEROSPACE APPLICATIONS IF THEY COULD BE RELIABLY AND EFFICIENTLY PRODUCED. THE PROGRAM WILL DEVELOP METHODS FOR RELIABLE PREPARATION OF FASILPOLYMERS ON A ROUTINE BASIS. PHASE I WILL EVALUA ...

    SBIR Phase II 1984 Department of DefenseAir Force
  8. DEPTH POFILING IN ALGAAS AND LINOO3 USING SPUTTER INITIATED RESONANCE IONIZATION SPECTROSCOPY

    SBC: ATOM SCIENCES, INC.            Topic: N/A

    WE PROPOSE THE EXTENSION OF A NEW ANALYTICAL TECHNIQUE, SPUTTER INITIATED RESONANCE IONIZATION SPECTROSCOPY (SIRIS) TO INCLUDE DEPTH PROFILING. THIS PHASE I PROJECT WILL DETERMINE THE FEASIBILTY OF MAKING THIS PRELIMINARY MEASUREMENTS USING THE SIRIS TECHNIQUE ON STANDARD SAMPLES OF SI DOPED ALGAAS AND TI DOPED LINBO3. SUCH SAMPLES ARE OF INTEREST TO THE AIR FORCE'S VHSIC AND ELECTRO-0PTIC DEVELOP ...

    SBIR Phase II 1984 Department of DefenseAir Force
  9. HIGH ENERGY HIGH POWER DENSITY SODIUM\MIXED CHALCOGENIDE BATTERIES FOR POWER APPLICATIONS.

    SBC: Technology Holding, LLC            Topic: N/A

    WORK IS PROPOSE TO ASSESS THE FEASIBILTY OF SODIUM\SULFUR-SELENIUM BATTERIES FOR ELECTRICALLY POWERED WEAPONS SYSTEMS ABOARD AIR BREATHING AIRCRAFT AND FOR ENERGY STORAGE ABOARD ORBITAL FLIGHT VEHICLES. SEVERAL POTENTIAL ADANTAGES OF THE SODIUM\ SULFUR-SELENIUM BATTERY OVER THE SODIUM-SULFUR BATTERY ARE POINTED OUT, INCLUDING HIGHER POWER AND ENERGY DENSITIES AND LONGER LIFETIMES. BASED ON SOME PR ...

    SBIR Phase II 1984 Department of DefenseAir Force
  10. THE DESIGN OF A RAPID, INTELLIGENT PROTOTYPING LANQUAGE (RIPL)

    SBC: Computer Technology Associates            Topic: N/A

    DESIGN OF EFFECTIVE MAN-MACHINE INTERFACES (MMI) IS CRITICAL TO THE OPERATIONAL EFECTIVENESS OF INTERACTIVE COMPUTER SYSTEMS. UNFORTUNATELY, MMI DESIGN FLAWS USUALLY ARE NOT UNCOVERED UNTIL LATE IN THE IMPLEMENTATION PHASE WHEN THEIR CORRECTION IS VERY EXPENSIVE OR IMPOSSIBLE. RAPID PROTOTYPING TOOLS HAVE BEEN USE TO ALLEVIATE THESE PROBLEMS BY ALLOWING MMI DESIGNS TO BECOME VISIBLE AND MODIFIABLE ...

    SBIR Phase II 1984 Department of DefenseAir Force
US Flag An Official Website of the United States Government