You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Additively Manufactured Inflatable Hulls- Improved Survivability- 20% Total Ownership Cost Reduction

    SBC: Response Technologies, LLC            Topic: DLA152001

    Seam failures of flexible inflatable hulls is the primary reason for failures of military RHIBS and CRCs.These failures are a result of the current manufacturing methods being used, and which have been in place for over fifty years.Whats more, the manufacturing methods and fragmented supply chain of these hulls result in very long and unreliable lead times.These shortcomings impact the survivabili ...

    SBIR Phase II 2018 Department of DefenseDefense Logistics Agency
  2. Automated Through Thickness Reinforcement for Affordable & Robust High Temperature Composite Structures

    SBC: James L. Gallagher, Inc.            Topic: DLA231D07

    The national imperative to field hypersonic weapon systems has increased the demand for robust, lightweight, and affordable high temperature materials for thermal protection systems.  Refractory composites such as carbon-carbon (C/C) or carbon/SiC (C/SiC) offer enormous promise, but wider-scale acceptance continues to be hindered by certain technical and affordability limitations.  Key among the ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  3. Fuel Cell Phase I Qualification and UH-1Y Crashworthy Prototypes

    SBC: Response Technologies, LLC            Topic: DLA182001

    There are over 123 UH-1Y aircraft in service today, each equipped with five internal fuel cells, with an average cost of $15k per fuel cell. The current supply chain for UH-1Y fuel cells is not able to meet delivery nor quality requirements, which has resulted in a significant force readiness issue. With this SBIR Phase II proposal, Response Technologies (RT) aims to: 1) “Phase I Qualify” a co ...

    SBIR Phase II 2019 Department of DefenseDefense Logistics Agency
  4. Rotorcraft Fuel Bladder Weight and Total Ownership Cost Reduction

    SBC: Response Technologies, LLC            Topic: DLA182001

    Response Technologies will attempt to build H-60 fuel cell prototypes and qualify to a portion of MIL-DTL-27422F’s Phase II performance testing criteria [Class B – Semi rigid or self-supporting fuel construction, Type I – Self-sealing, and Protection Level C – Full self-sealing against 50 caliber and partial self-sealing against 14.5 mm] . Response Technologies uses an additive manufacturi ...

    SBIR Phase II 2019 Department of DefenseDefense Logistics Agency
  5. Seamless Flexible Fuel Tanks- 65% TOC Reduction

    SBC: Response Technologies, LLC            Topic: DLA152001

    The DoD uses flexible fuel bladders in multiple air, ground, and sea vehicles because they: 1) easily fit into almost any space, 2) are corrosion resistant, and can often be self-sealing and explosion resistant, 3) allow for customized placement of fittings and connection points, and 4) these flexible tanks can collapse as they empty, thereby reducing the need for venting and minimizing sloshing a ...

    SBIR Phase II 2016 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government