You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Broad Spectrum Adsorption-Flurescence method for Determining Adsorption Capacity of Fly Ash

    SBC: PHOSPHORTECH CORP            Topic: 171FH1

    Interference of unburned and activated carbon in fly ash with air-entraining admixtures (AEA’s) in fresh concrete mixtures is a major concern in the concrete industry. Therefore, a rapid and accurate measurement of adsorption capacity of fly ash is of great interest to this industry.In this project, a new method is suggested, which can qualitatively and quantitatively measure different surfactan ...

    SBIR Phase II 2021 Department of Transportation
  2. Accurate and Rapid Measurement of Adsorption Capacity of Fly Ash in Concrete Mixtures

    SBC: PHOSPHORTECH CORP            Topic: 171FH1

    Proposal title: Accurate and Rapid Measurement of Adsorption Capacity of Fly Ash in Concrete Mixtures Interference of unburned and activated carbon in fly ash with air-entraining admixtures (AEAs) in fresh concrete mixtures is a major concern in the concrete industry. Therefore, a rapid and accurate measurement of adsorption capacity of fly ash is of great interest to this industry. In Phase I, ...

    SBIR Phase II 2018 Department of Transportation
  3. VERIFICATION OF STEEL PLACEMENT IN PORTLAND CEMENT CONCRETE USING SHORT-PULSE RADAR TECHNIQUES

    SBC: Bomar Associates Inc.            Topic: N/A

    THERE IS A NEED FOR A RAPID, NON-DESTRUCTIVE METHOD TO TEST FOR PROPER STEEL PLACEMENT IN PORTLAND CEMENT PAVEMENTS. ISTHE GOAL OF THIS PROPOSED PROGRAM TO DEMONSTRATE THE FEASIBILITY OF USING SHORT-PULSE, GROUND-PENETRATING RADAR AS A MEANS OF RAPID STEEL LOCATION IN CONCRETE PAVEMENT. A GENERAL BACKGROUND IN GROUND-PENETRATING RADAR THEORY IS PRESENTED. LABORATORY AND FIELD MEASUREMENTS USING A ...

    SBIR Phase II 1990 Department of Transportation
  4. PROPOSAL TO DEVELOP A COMPREHENSIVE FREIGHT INFORMATION SYSTEM

    SBC: Colography Group Inc.            Topic: N/A

    THE FOLLOWING PROPOSAL PROVIDES THE RATIONALE AND METHODOLOGICAL APPROACH FOR THE DEVELOPMENT OF A GEOGRAPHICALLY DETAILED VISUAL DATABASE AND RETRIEVAL SYSTEM TO SUPPORT THE INTERMODAL PLANNING REQUIREMENTS OF ISTEA. CURRENTLY, STATES AND METROPOLITAN PLANNING ORGANIZATIONS HAVE ACCESS TO LIMITED AND INCONSISTENT FREIGHT INFORMATION RESOURCES WITH WHICH TO INTEGRATE INTO INTERMODAL PERFORMANCE SY ...

    SBIR Phase II 1995 Department of Transportation
  5. DEVELOPMENT OF NOTEBOOK COMPUTER SOFTWARE TO COLLECT TRIP GENERATION DATA AT INTERMODAL PASSENGER AN FREIGHT TERMINALS

    SBC: Transportation Consulting Mda            Topic: N/A

    WITH THE PASSAGE OF THE INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT, THERE BECAME A HEIGHTENED AWARENESS THAT OUR UNDERSTANDING OF INTERMODAL AND MULTIMODAL FACILITIES WAS LIMITED. PRIVATE ENTERPRISE HAS BEEN WORKING FOR MANY YEARS ON APPLICATIONS WHICH WOULD ALLOW FOR A PACKAGE TO MOVE FROM POINT A TO POINT B BY THE MOST EFFICIENT MODE, WITH THE PURCHASER OF THE SERVICE ONLY BEING AWARE OF A ...

    SBIR Phase II 1995 Department of Transportation