You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Magneto-Thermal MRAM

    SBC: NVE CORP. (FORMERLY NONVOLATILE ELECTRONICS, INC.            Topic: BMDO02004

    Magneto-Thermal MRAM uses both heat and magnetic field (current)to overcome thermal instabilities of very small memory cells. Self-generated heat in the cell raises the temperature of magnetic material in the cell above the exchange ordering temperature of the magnetic material (either ferromagnetic or anti-ferromagnetic). Magneto-Thermal MRAM is compatible with advances in photolithography down t ...

    SBIR Phase II 2004 Department of DefenseDefense Threat Reduction Agency
  2. Software Package for Material Model Evaluation

    SBC: APTEK, Inc.            Topic: N/A

    This Phase I and II SBIR will develop a user-friendly, run-time efficient software package dedicated to fitting and evaluating material models used in finite element codes like LS-DYNA. The software package will consist of a pre-processor, a core driver, and a post-processor. The pre-processor will allow the user to specify the material model, model parameters, and desired load history. The dri ...

    SBIR Phase II 2004 Department of Transportation
  3. Compatible Economic Development in the Rocky Mountain Region: Diversifying Agricultural Income with Cultivation Techniques for Osha

    SBC: Healing Planet Herbs, Inc.            Topic: N/A

    Rural communities throughout the Rocky Mountain region are in need of diversified, value-added crops to bolster a declining agricultural sector. The goal of this project is to demonstrate scaled-up field production of Osha root and to lay a foundation for long-term producer viability.

    SBIR Phase II 2004 Department of Agriculture
  4. Portland Cement Concrete Pavement Recycling

    SBC: Road Processing Resources Inc.            Topic: N/A

    RPR's Phase I contract proved the feasibility of concrete recycling based o a shock-producing hammer/anvil concept for fracturing and sizing aggregate and separating reinforcing steel into marketable scrap. The Phase II project will develop a portable self-propelled prototype to remove and process a 12 foot wide roadway at a rate of about a mile a day. This is called "Fast Track" highway removal ...

    SBIR Phase II 2004 Department of Transportation
US Flag An Official Website of the United States Government