You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
N/A
SBC: Resource Systems Group, Inc. Topic: N/AN/A
SBIR Phase II 2000 Department of Transportation -
MobileWeb: Software for Mobile Web/E-mail access over Commercial Satellite Links
SBC: ARCHITECTURE TECHNOLOGY INC Topic: N/ACommercial satellite services provide a convenient mechanism for over-the-horizon communications among ships, aircraft, and on-shore information sources. The Coast Guard has identified the potential of maritime Web and messaging (e-mail) applications implemented over commercial satellite links to subtantially increase the effectiveness of Coast Guard operations. However, there are two major impe ...
SBIR Phase II 2000 Department of Transportation -
MobileWeb: Software for Mobile Web/E-Mail Access over Commercial Satellite Links
SBC: ARCHITECTURE TECHNOLOGY INC Topic: N/ANot Available Commercial satellite services provide a convenient mechanism for over-the-horizon communications among ships, aircraft, and on-shore information sources. The Coast Guard had identified the potential of maritime Web and messaging (e-mail) applications implemented over commercial satellite links to substantially increase the effectiveness of Coast Guard operations. However, there are ...
SBIR Phase II 2003 Department of Transportation -
MobileWeb: Software for Mobile Web/E-mail access over Commercial Satellite Links
SBC: ARCHITECTURE TECHNOLOGY INC Topic: N/ACommercial satellite services provide a convenient mechanism for over-the-horizon communications among ships, aircraft, and on-shore information sources. The Coast Guard has identified the potential of maritime Web and messaging (e-mail) applications implemented over commercial satellite links to subtantially increase the effectiveness of Coast Guard operations. However, there are two major impe ...
SBIR Phase II 2000 Department of Transportation -
Magneto-Thermal MRAM
SBC: NVE CORP. (FORMERLY NONVOLATILE ELECTRONICS, INC. Topic: BMDO02004Magneto-Thermal MRAM uses both heat and magnetic field (current)to overcome thermal instabilities of very small memory cells. Self-generated heat in the cell raises the temperature of magnetic material in the cell above the exchange ordering temperature of the magnetic material (either ferromagnetic or anti-ferromagnetic). Magneto-Thermal MRAM is compatible with advances in photolithography down t ...
SBIR Phase II 2004 Department of DefenseDefense Threat Reduction Agency -
IMPROVED DGPS DATA RELIABILITY THROUGH THE USE OF ADVANCED SIGNAL PROCESSING TECHNIQUES
SBC: CAMBRIDGE ENGINEERING, Inc Topic: N/ATHE OBJECTIVE OF THIS RESEARCH IS TO DEVELOP AND TEST TECHNIQUES WHICH COMBAT ATMOSPHERIC NOISE AND CONSEQUENTLY INCREASE THE RELIABLE RANGE OF THE DGPS/RADIOBEACON LINK. THE FOLLOWING IDEAS WILL BE EXPLORED AND TESTED: 1) WIDEBAND NOIS CLIPPING, LIMITING OR BLANKING OF NOISE IMPLUSES TO IMPROVE THE SIGNAL TO NOISE RATIO. 2) THE USE OF SIDE INFORMATION TO INFORM A FORWARD ERROR CORRECTING DECODER ...
SBIR Phase II 1991 Department of Transportation