You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Virtual RF Environment

    SBC: DataSoft Corp.            Topic: A09060

    The DataSoft Virtual Radio Frequency (RF) Environment (VRE) functional prototype provides a system for immersing a few representative Command, Control, Communications (C3) Systems-under-Test (SUT) in an emulated environment of virtual emitters and realistic environmental RF channel effects to stress them as they would be in the real world. The VRE Channel Emulation impairs signals delivered betwee ...

    SBIR Phase II 2012 Department of DefenseArmy
  2. Development and Scale-Up of Nanothermite Composites for Propellant Ignition

    SBC: INNOVATIVE MATERIALS & PROCESSES INC            Topic: A10050

    The main objective of this proposal SBIR Phase II project is to scale-up and demonstrate the low-cost formation of 15-35 kg/yr of nanothermite-nitrocellulose composite granules for propellant ignition and as additives to explosive materials. All of the reactants used for the energetic composites will be made from United States produced materials. The reactive composites will use a base nanothermit ...

    SBIR Phase II 2012 Department of DefenseArmy
  3. Laser Vibrometry Detection of SBIEDs

    SBC: Photonics Applications, LLC            Topic: A10120

    The objective of this effort is to design and build and test a prototype laser interferometric sensor system for the detection of suicide bombers, burried IEDs and buried land mines.

    SBIR Phase II 2012 Department of DefenseArmy
  4. Comprehensive Latency Mitigation in EOIR Sensor Controls

    SBC: KUTTA TECHNOLOGIES, INC.            Topic: A11072

    In Phase I, Kutta hypothesized multiple Latency Improvement Algorithms (LIAs) for the control of Electro-Optical and Infrared payloads onboard Unmanned Aerial Vehicles. Through an extensive human factors study within a representative simulated environment, Kuttas researchers proved their hypotheses and, in many cases, saw a 50% or more improvement in effectiveness among the participants. In Phase ...

    SBIR Phase II 2012 Department of DefenseArmy
  5. Volume and Weight Reduction Method for Intermediate Moisture Ration Components and Snacks

    SBC: Creative Resonance Inc.            Topic: A11046

    The need to develop an alternative technology to those that dominate the snack food industry has become apparent over the last decade. Quality, nutrition, functionality, health considerations articulated by the consumers coupled to efficiency, low energy requirements, low asset base, small process footprint, etc. highly desired by manufacturers have constantly reinforced this need stimulating few ...

    SBIR Phase II 2012 Department of DefenseArmy
  6. Intensified Unit Operations and Lightweight Plant Design for Mobile Waste-to-Energy Systems

    SBC: Diversified Energy Corporation            Topic: OSD07ES5

    Diversified Energy proposes an innovative gasification system for the conversion of military useful waste streams into valuable energy products. The gasifier utilizes a molten bath, allowing for the gasification of a wide range of hydrocarbon feedstocks (e.g., biomass, MSW, sewage sludge, etc.) into a clean syngas free of oils and tars. The coupling of this technology, plus an intermediate gas c ...

    SBIR Phase II 2011 Department of DefenseArmy
  7. Dynamic Formats in Distributed Simulation Systems

    SBC: Cogent3D, Inc.            Topic: A09181

    The objective of Phase II is to implement and demonstrate the Open source Dynamic terrain API for SAF systems (ODAS) approach proposed, defined, and prototyped in Phase I for interoperability and correlation between dynamic formats and classic static, pre-distributed terrain solutions used by OneSAF. Cogent3D will demonstrate the ODAS API implementation supports multiple terrain services that supp ...

    SBIR Phase II 2011 Department of DefenseArmy
  8. Innovative Eye-Safe Wavelength High Power Fiber Laser

    SBC: ADVALUE PHOTONICS INC            Topic: A10028

    High power fiber lasers have made significant progress in the last several years. Ten kW of diffraction-limited output power at 1 micron from one single mode fiber has been demonstrated. Department of Defense (DoD) needs 100s of kW for missile defense as well as for protection against rockets, artillery, and mortars (RAM). There is serious concern about current 1 micron fiber laser system potentia ...

    SBIR Phase II 2011 Department of DefenseArmy
  9. Spoofing Network Architectures in Response to Hostile Reconnaissance

    SBC: DataSoft Corp.            Topic: A10014

    The DataSoft Network Obfuscation and Virtualized Anti-reconnaissance system (NOVA) detects hostile network reconnaissance and denies access to real network information while simultaneously providing false network information to attackers. This results in attackers expending significantly extra time and effort, allowing defenders additional time to mount an appropriate response. NOVA is a novel dis ...

    SBIR Phase II 2011 Department of DefenseArmy
  10. Large Format Dual Band FPA ROIC for Low Flux Environments

    SBC: INFRARED LABORATORIES INC            Topic: A10025

    In Phase-I of the project we constructed a unique ROIC design based on our Amplifier-Shared-Dual-Band CTIA (ASDBC) technology to address the problems experienced by the existing ROICs. In Phase-II, we will refine and complete the design, manufacture the ROIC, fabricate the FPA, and test the completed product. One application issue presented by the DBCHI is the large gain variation across the array ...

    SBIR Phase II 2011 Department of DefenseArmy
US Flag An Official Website of the United States Government