You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Laser/Microwave Energy Deposition to Improve Control/Performance of High Speed Vehicles

    SBC: PHYSICS, MATERIALS, AND APPLIED MATHEMATICS RESEARCH L.L.C.            Topic: AF103009

    ABSTRACT:In this effort, we will couple the energy of focused microwave bursts into the air and onto surfaces by first forming a laser plasma. The presence of the laser plasma allows much lower microwave intensities to couple their energy to the laser-pre-ionized surface or air- volume, allowing more efficient energy-transfer and the use of lower-power microwave systems to achieve the desired effe ...

    SBIR Phase II 2015 Department of DefenseAir Force
  2. Wireless Power for Battlefield Airmen Operation

    SBC: Armorworks Enterprises, Inc.            Topic: AF121192

    ABSTRACT: A phase II program is proposed leading to integrate wireless inductive power transfer technology on two prototype tactical vests. The focus of the phase II program would be the development and evaluation of a full-scale inductive power transfer system on a PRC-152 radio by both modifying and interfacing its battery. Because a mating vest/pouch that contains inductive charging circuits so ...

    SBIR Phase II 2015 Department of DefenseAir Force
  3. Holographic Video Display Using Novel Guided-wave Scanning System

    SBC: TIPD LLC            Topic: AF131023

    ABSTRACT:Todays analysts need improved 3D visualization tools to assist in critical situations such as deconfliction, line-of-sight analysis, air space and satellite control.Currently available 3D displays cannot provide the level of detail and comfort needed because the displays contain unacceptable visual artifacts, do not provide full parallax, require special headgear, and induce nausea in man ...

    SBIR Phase II 2015 Department of DefenseAir Force
  4. Thick Composite Crack Analysis

    SBC: GLOBAL ENGINEERING RESEARCH AND TECHNOLOGIES, LLC            Topic: N132101

    Advanced thick composites are increasingly used in components for defense applications as well as commercial structures. The proposed project will lead to the development and commercialization of a validated predictive capability based on the Peridynamic (PD) theory to enhance the performance of thick composite components under complex loading conditions while exposed to harsh environments. The pr ...

    SBIR Phase II 2015 Department of DefenseNavy
  5. Remote Triage of Combat Casualties

    SBC: MAXENTRIC TECHNOLOGIES LLC            Topic: A13089

    In response to the A13-004 Remote Triage of Combat Casualties solicitation, MaXentric proposes the VitalWave system. The VitalWave system uses Doppler radar and radar imaging to assess the vital signs individuals. The use of Doppler radar allows for a system that can measure vital signs with no direct contact required. This allows first responders the ability to assess the vital signs of multiple ...

    SBIR Phase II 2015 Department of DefenseArmy
  6. Subsea Long Haul Optical Transponder

    SBC: DRG Undersea Consulting Inc            Topic: N131060

    The SBIR Phase I effort demonstrated that a successful Subsea Long Haul Optical Transponder (SLOT) design for transmitting data from a branched sensor node onto a trunk cable and back to a shore terminus must consider the overall trunk cable system transmission characteristics. The SBIR Phase I study resulted in a viable SLOT concept. The Phase II effort develops the Core Transponder Module (CTM) ...

    SBIR Phase II 2015 Department of DefenseNavy
  7. Sub-Aperture Augmented Low-Light Imager

    SBC: CREATIVE MICROSYSTEMS CORPORATION            Topic: SB143006

    Creative MicroSystems (CMC), of Waitsfield, VT, using external and internal funding sources, has been engaged in the design and development of a novel, multi-lens optical low-light imaging system (MOLLI)a revolutionary advance in night vision technology. Based upon a combined biomimetic/computed vision processing approacha significant departure from current night vision technologyCMC is developing ...

    SBIR Phase II 2015 Department of DefenseDefense Advanced Research Projects Agency
  8. Optical System for Precision Atomic Clocks and Stable Oscillators

    SBC: N.P. PHOTONICS, INC.            Topic: AF141126

    ABSTRACT:Ultra-stable and accurate frequency and timing devices such as atomic clocks are essential for modern communication, navigation, surveillance, and missile guidance systems. There are many atomic oscillators such as neutral calcium and neutral ytterbium that produce clock signal in optical domain. However, these optical standards are expensive and not widely available. The phase stabilized ...

    SBIR Phase II 2015 Department of DefenseAir Force
  9. Atmospheric Infra-red Transmittance Calculator (AIRTraC)

    SBC: SCITEC INC            Topic: N132090

    The Naval Air Warfare Center (NAWC) needs accurate, autonomous techniques for atmospheric correction of airborne imaging sensors to support flight testing, specifically validation of Noise-Equivalent Differential Temperature (NEDT) capabilities of Electro-Optical/Infrared (EO/IR) sensors used for Intelligence, Surveillance and Reconnaissance (ISR) applications. A key aspect of validating NEDT spec ...

    SBIR Phase II 2015 Department of DefenseNavy
  10. C2NET Robust Command and Control Networking

    SBC: MAXENTRIC TECHNOLOGIES LLC            Topic: A13092

    MaXentric is proposing a novel C2 network solution capable of interconnecting wireless devices simultaneously over different wireless technologies (military and/or commercial) either operating in peer-to-peer mode or using a wireless infrastructure. Our s

    SBIR Phase II 2015 Department of DefenseArmy
US Flag An Official Website of the United States Government