You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Universal Commuter Railcar Boarding Device for Use by Both Disabled and Able-bodied Individuals Configurable for all U.S. Railstation Platforms

    SBC: SAFE INC            Topic: N/A

    In Phase I of this SBIR project the proposed commuter railcar loading concept was developed in detail and its operation was simulated in order to demonstrate feasibility and to quantify the reduction in station dwell time compared to other railcar loading operations. Feasibility was demonstrated. The boarding system will enable the loading of all passengers, regardless of mobility, from a wide r ...

    SBIR Phase II 2007 Department of Transportation
US Flag An Official Website of the United States Government