You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Laser/Microwave Energy Deposition to Improve Control/Performance of High Speed Vehicles

    SBC: PHYSICS, MATERIALS, AND APPLIED MATHEMATICS RESEARCH L.L.C.            Topic: AF103009

    ABSTRACT:In this effort, we will couple the energy of focused microwave bursts into the air and onto surfaces by first forming a laser plasma. The presence of the laser plasma allows much lower microwave intensities to couple their energy to the laser-pre-ionized surface or air- volume, allowing more efficient energy-transfer and the use of lower-power microwave systems to achieve the desired effe ...

    SBIR Phase II 2015 Department of DefenseAir Force
  2. Implementing the Daylight Object Restoration Algorithm for Imaging in Daylight and Strong Turbulence

    SBC: Hart Scientific Consulting International LLC            Topic: AF103017

    ABSTRACT:A new algorithm, the Daylight Object Restoration Algorithm (DORA), has been developed. DORA includes a novel implementation of the multi-frame blind deconvolution image restoration concept which recovers high-quality object estimates from sequences of degraded images. DORA removes the effects of atmospheric aberration in images recorded at ground-based telescopes, and is designed to opera ...

    SBIR Phase II 2015 Department of DefenseAir Force
  3. Wireless Power for Battlefield Airmen Operation

    SBC: Armorworks Enterprises, Inc.            Topic: AF121192

    ABSTRACT: A phase II program is proposed leading to integrate wireless inductive power transfer technology on two prototype tactical vests. The focus of the phase II program would be the development and evaluation of a full-scale inductive power transfer system on a PRC-152 radio by both modifying and interfacing its battery. Because a mating vest/pouch that contains inductive charging circuits so ...

    SBIR Phase II 2015 Department of DefenseAir Force
  4. Holographic Video Display Using Novel Guided-wave Scanning System

    SBC: TIPD LLC            Topic: AF131023

    ABSTRACT:Todays analysts need improved 3D visualization tools to assist in critical situations such as deconfliction, line-of-sight analysis, air space and satellite control.Currently available 3D displays cannot provide the level of detail and comfort needed because the displays contain unacceptable visual artifacts, do not provide full parallax, require special headgear, and induce nausea in man ...

    SBIR Phase II 2015 Department of DefenseAir Force
  5. Optical System for Precision Atomic Clocks and Stable Oscillators

    SBC: N.P. PHOTONICS, INC.            Topic: AF141126

    ABSTRACT:Ultra-stable and accurate frequency and timing devices such as atomic clocks are essential for modern communication, navigation, surveillance, and missile guidance systems. There are many atomic oscillators such as neutral calcium and neutral ytterbium that produce clock signal in optical domain. However, these optical standards are expensive and not widely available. The phase stabilized ...

    SBIR Phase II 2015 Department of DefenseAir Force
  6. Just In Time (JIT) Component Presentation

    SBC: Aspire Solutions, Inc            Topic: AF073105

    ABSTRACT:STTPBENEFIT:STTP

    SBIR Phase II 2015 Department of DefenseAir Force
  7. High Efficiency Flight Line Cooling & Power System

    SBC: ENERGY QUEST TECHNOLOGIES INC            Topic: AF112219

    ABSTRACT:The objective of this program is to design and produce a commercial-like ground support aircraft cooling and 400 Hz power system that is made from predominantly commercial sub-systems, such as a commercially available (COTS) generator, engines, air conditioning components, blower, and trailer. The system would incorporate novel recirculation of the evaporator condensate to pre-cool the a ...

    SBIR Phase II 2015 Department of DefenseAir Force
  8. Stick-to-Stress Dynamic Flight Simulation for Predicting Fatigue Life and Scheduling Inspections of Aircraft

    SBC: ZONA TECHNOLOGY INC            Topic: AF141066

    ABSTRACT:Both commercial and military aircraft are being flown/utilized for extended operational time; a more accurate prediction of residual life and the inspection interval for an individual aircraft is required, as these aging aircraft are kept in operational status. A technique for converting actual aircraft measured flight usage data into accurate calculated stresses/strains on the structural ...

    SBIR Phase II 2015 Department of DefenseAir Force
  9. Space-based RF Emitter Detection and Localization Using Field Programmable Gate Arrays

    SBC: RINCON RESEARCH CORPORATION            Topic: AF141124

    ABSTRACT:In response to SBIR AF141-124 Phase II request for proposal, Rincon Research Corporation (RRC) proposes to optimize and validate the results of the Phase I study, which determined that a constellation of 5-kg 10x10x30-cm low earth orbiting cubesats can geolocate a terrestrial transmitter that is interfering with the communications of a U.S. Government satellite. We optimize Phase I findin ...

    SBIR Phase II 2015 Department of DefenseAir Force
  10. Improved TPS for Analog and Mixed-Signal Bad-Actor SRUs

    SBC: RIDGETOP GROUP INC            Topic: AF093207

    ABSTRACT: The proposed program addresses the cost effectiveness of maintenance operations for mission-critical electronic warfare circuit card assemblies (CCAs), by reducing no fault found (NFF) codes and accelerating accurate diagnosis of root causes in support of repairs of analog, digital, radio frequency (RF) and mixed-signal CCAs. Benefits of the proposed work include a projected 50% reducti ...

    SBIR Phase II 2015 Department of DefenseAir Force
US Flag An Official Website of the United States Government