You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Virtual RF Environment

    SBC: DataSoft Corp.            Topic: A09060

    The DataSoft Virtual Radio Frequency (RF) Environment (VRE) functional prototype provides a system for immersing a few representative Command, Control, Communications (C3) Systems-under-Test (SUT) in an emulated environment of virtual emitters and realistic environmental RF channel effects to stress them as they would be in the real world. The VRE Channel Emulation impairs signals delivered betwee ...

    SBIR Phase II 2012 Department of DefenseArmy
  2. Integrated Portable Power and Cooling System

    SBC: ENERGY QUEST TECHNOLOGIES INC            Topic: A09090

    The objective of this project is to build and deliver to the Army two prototype systems that will verify a reduction in fuel consumption by at least 30% and reduce weight by at least 30%, when compared to a currently fielded system. The design presented in this proposal is expected to reduce fuel consumption by over 40% and weight by 58%. These dramatic reductions are attributed to 3 system featur ...

    SBIR Phase II 2012 Department of DefenseArmy
  3. Laser Vibrometry Detection of SBIEDs

    SBC: Photonics Applications, LLC            Topic: A10120

    The objective of this effort is to design and build and test a prototype laser interferometric sensor system for the detection of suicide bombers, burried IEDs and buried land mines.

    SBIR Phase II 2012 Department of DefenseArmy
  4. High Temperature Silicon Carbide (SiC) Gate Driver

    SBC: Arkansas Power Electronics International, Inc.            Topic: A10132

    APEI, Inc."s Phase II goal is to develop, fabricate and test a compact, high temperature, high performance isolated gate drivers utilizing HTSOI integrated circuits, discrete SiC devices, and high frequency coreless magnetics. Additionally, leveraging its existing high performance high temperature SiC power modules, APEI, Inc. will integrate the developed gate driver into this SiC power module and ...

    SBIR Phase II 2012 Department of DefenseArmy
  5. Comprehensive Latency Mitigation in EOIR Sensor Controls

    SBC: KUTTA TECHNOLOGIES, INC.            Topic: A11072

    In Phase I, Kutta hypothesized multiple Latency Improvement Algorithms (LIAs) for the control of Electro-Optical and Infrared payloads onboard Unmanned Aerial Vehicles. Through an extensive human factors study within a representative simulated environment, Kuttas researchers proved their hypotheses and, in many cases, saw a 50% or more improvement in effectiveness among the participants. In Phase ...

    SBIR Phase II 2012 Department of DefenseArmy
  6. Volume and Weight Reduction Method for Intermediate Moisture Ration Components and Snacks

    SBC: Creative Resonance Inc.            Topic: A11046

    The need to develop an alternative technology to those that dominate the snack food industry has become apparent over the last decade. Quality, nutrition, functionality, health considerations articulated by the consumers coupled to efficiency, low energy requirements, low asset base, small process footprint, etc. highly desired by manufacturers have constantly reinforced this need stimulating few ...

    SBIR Phase II 2012 Department of DefenseArmy
US Flag An Official Website of the United States Government