You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Laser/Microwave Energy Deposition to Improve Control/Performance of High Speed Vehicles
SBC: PHYSICS, MATERIALS, AND APPLIED MATHEMATICS RESEARCH L.L.C. Topic: AF103009ABSTRACT:In this effort, we will couple the energy of focused microwave bursts into the air and onto surfaces by first forming a laser plasma. The presence of the laser plasma allows much lower microwave intensities to couple their energy to the laser-pre-ionized surface or air- volume, allowing more efficient energy-transfer and the use of lower-power microwave systems to achieve the desired effe ...
SBIR Phase II 2015 Department of DefenseAir Force -
Implementing the Daylight Object Restoration Algorithm for Imaging in Daylight and Strong Turbulence
SBC: Hart Scientific Consulting International LLC Topic: AF103017ABSTRACT:A new algorithm, the Daylight Object Restoration Algorithm (DORA), has been developed. DORA includes a novel implementation of the multi-frame blind deconvolution image restoration concept which recovers high-quality object estimates from sequences of degraded images. DORA removes the effects of atmospheric aberration in images recorded at ground-based telescopes, and is designed to opera ...
SBIR Phase II 2015 Department of DefenseAir Force -
Wireless Power for Battlefield Airmen Operation
SBC: Armorworks Enterprises, Inc. Topic: AF121192ABSTRACT: A phase II program is proposed leading to integrate wireless inductive power transfer technology on two prototype tactical vests. The focus of the phase II program would be the development and evaluation of a full-scale inductive power transfer system on a PRC-152 radio by both modifying and interfacing its battery. Because a mating vest/pouch that contains inductive charging circuits so ...
SBIR Phase II 2015 Department of DefenseAir Force -
Holographic Video Display Using Novel Guided-wave Scanning System
SBC: TIPD LLC Topic: AF131023ABSTRACT:Todays analysts need improved 3D visualization tools to assist in critical situations such as deconfliction, line-of-sight analysis, air space and satellite control.Currently available 3D displays cannot provide the level of detail and comfort needed because the displays contain unacceptable visual artifacts, do not provide full parallax, require special headgear, and induce nausea in man ...
SBIR Phase II 2015 Department of DefenseAir Force -
Thick Composite Crack Analysis
SBC: GLOBAL ENGINEERING RESEARCH AND TECHNOLOGIES, LLC Topic: N132101Advanced thick composites are increasingly used in components for defense applications as well as commercial structures. The proposed project will lead to the development and commercialization of a validated predictive capability based on the Peridynamic (PD) theory to enhance the performance of thick composite components under complex loading conditions while exposed to harsh environments. The pr ...
SBIR Phase II 2015 Department of DefenseNavy -
Optical System for Precision Atomic Clocks and Stable Oscillators
SBC: N.P. PHOTONICS, INC. Topic: AF141126ABSTRACT:Ultra-stable and accurate frequency and timing devices such as atomic clocks are essential for modern communication, navigation, surveillance, and missile guidance systems. There are many atomic oscillators such as neutral calcium and neutral ytterbium that produce clock signal in optical domain. However, these optical standards are expensive and not widely available. The phase stabilized ...
SBIR Phase II 2015 Department of DefenseAir Force -
Green Catalyst-free Electric Monopropellant (GEM) for Insensitive Munitions (IM) Compliance
SBC: Digital Solid State Propulsion, Inc Topic: MDA13032Continuously advancing ballistic missile threats require an interceptor missile system which has greater basing flexibility and highly advanced performance in terms of burnout velocity and Divert and Attitude Control (DACS). Liquid systems are the ideal candidate to fit this role because of higher performance than solids; however, they tend to be a significant safety risk due to toxicity, corrosi ...
SBIR Phase II 2015 Department of DefenseMissile Defense Agency -
100W Mode-locked Green Laser for GaAs Photoemission Guns
SBC: ADVALUE PHOTONICS INC Topic: 38eTo address the DoE need for a high-power laser source used for synchronous photoinjection of GaAs photoemission guns, AdValue Photonics proposes to develop a radio-frequency synchronized 100W mode-locked green laser source at a GHz rate. Previously-demonstrated GHz-rate modelocked solid-state/fiber lasers suffer from a reliability issue due to the use of fragile free-space bulk optics for their la ...
SBIR Phase II 2015 Department of Energy -
Controllable and Adaptable Lateral Support System
SBC: ADVANCED MATERIALS & DEVICES Topic: N132143This SBIR Phase II effort will be aimed towards designing and testing a controllable missile lateral support system (LSS) that reacts automatically to shock and vibration inputs. A sub-scale lateral support system (LSS) assembly consisting of six jacking feet and a full-scale LSS jacking feet unit will be fabricated and tested. The electromechanically actuated LSS will offer controllable damping t ...
SBIR Phase II 2015 Department of DefenseNavy -
A High Efficiency, High Power Density, GaN-Based DC-DC Converter for Grid-Tied Energy Storage Applications
SBC: Arkansas Power Electronics International, Inc. Topic: 01bPower generation and transmission limits manifest themselves in the inability to respond to dynamic peak power demand. Load leveling can effectively support dynamic demand changes by having additional standby power generating capabilities. This is achieved by either having a generation and distribution infrastructure that matches the peak demand and it is operated under its full capacity or having ...
SBIR Phase II 2015 Department of Energy