You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SEISMIC PRA

    SBC: Future Resources Associate Inc            Topic: N/A

    TECHNIQUES HAVE RECENTLY BEEN DEVELOPED FOR PROBABILISTIC ANALYSIS OF THE RISK FROM EARTHQUAKE-INITIATED ACCIDENTS AT NUCLEAR POWER REACTORS. THESE TECHNIQUES ARE NOW BEGINNING TO BE APPLIED AS PARTS OF LARGER PRA STUDIES. HOWEVER, THE RESULTS OF APPLYING THESE SEISMIC PRA TECHNIQUES ARE STILL HIGHLY UNCERTAIN, AND THE INSIGHTS GAINED SO FAR FOR SPECIFIC REACTORS ARE DIFFICULT TO GENERALIZE. THIS ...

    SBIR Phase II 1984 Nuclear Regulatory Commission
  2. PRESSURIZED WATER REACTOR TRANSIENT ANALYSIS MODEL

    SBC: Levy S Inc            Topic: N/A

    THIS PROPOSAL DESCRIBES A PROGRAM FOR THE DEVELOPMENT OF A PRESSURIZED WATER REACTOR (PWR) TRANSIENT ANALYSIS MODEL FOR USE ON A MICROCOMPUTER. THE INTENDED APPLICATION OF THIS PWR MODEL IS FOR ANALYSIS OF PWR SYSTEM RESPONSE, INCLUDING FORCED AND NATURAL CIRCULATION OPERATION. THE PRIMARY USER OF SUCH A MODEL WOULD BE A UTILITY OR NUCLEAR REGULATORY COMMISSION (NRC) ENGINEER OR PLANT OPERATOR PER ...

    SBIR Phase II 1984 Nuclear Regulatory Commission
  3. STUDY ON AVAILABILITY AND COMPOSITION OF METAL BEARING WASTES

    SBC: N.h. Parker, P.e. And            Topic: N/A

    THE WASTE STREAMS PRODUCED IN MANY MINERAL PROCESSING PLANTS ARE OFTEN TREATED ON AN "AD HOC" BASIS, MEETING THE ESSENTIAL REQUIREMENTS AT A GIVEN TIME. THESE WASTES DO CONTAIN VALUABLE METALS, WHICH ARE NOT RECOVERED DUE TO LACK OF OVERALL PLANNING OR DUE TO NONOPTIMAL PROCESSING. OPTIMIZING EXISTING PROCESSES OR INNOVATIVE PROCESS DESIGN FOR TREATMENT OF THESE WASTES WOULD YIELD VALUES, CONSERVE ...

    SBIR Phase II 1984 Nuclear Regulatory Commission
  4. PROBABILITY OF FLOODS WITH VERY LONG RETURN PERIODS

    SBC: Linsley Kraeger Associates Ltd            Topic: N/A

    THIS PROPOSAL IS DIRECTED TO THE DEVELOPMENT OF A PROCEDURE FOR GENERATING LONG STREAMFLOW SEQUENCES. IT IS PROPOSED TO FIRST DEVELOP A LONG SEQUENCE OF HOURLY RAINFALL BY STOCHASTIC METHODS AND TO TRANSFORM THIS RAINFALL SEQUENCE INTO STREAMFLOW WITH A DETERMINISTIC HYDROLOGIC MODEL. PHASE I WILL FOCUS ON THE A STOCHASTIC RAINFALL MODEL CAPABLE OF DEVELOPING RAINFALL SEQUENCES AT MULTIPLE SITES. ...

    SBIR Phase II 1985 Nuclear Regulatory Commission
  5. PLASMA STRUCTURE IN LATER-TIME HANE PLASMAS- LABORATORY SIMULATION

    SBC: Jaycor, Inc.            Topic: N/A

    BECAUSE INTERNATION TREATIES PRECLUDE HIGH-ALTITUDE NUCLEAR TESTS, THERE IS LITTLE RELEVANT DATA FROM NUCLEAR BURSTS REGARDING THE SIZE AND DYNAMICS OF STRIATIONS IN NUCLEAR PLUMES OR EVEN THE BASIC PHYSICAL CONDITIONS WHICH PERMIT THE EVOLUTION OF STRIATIONS. THE UNDERSTANDING OF STRIATION BEHAVIOR IS IMPORTANT, AS STRIATIONS GENERATED WHEN THE IONOSPHERE IS DISTURBED BY NATURAL OR NONNUCLEAR MAN ...

    SBIR Phase II 1986 Department of DefenseDefense Threat Reduction Agency
  6. USING LASERS IN NUCLEAR EFFECTS SIMULATIONS- FEASIBILITY STUDY

    SBC: Jaycor, Inc.            Topic: N/A

    JAYCOR HAS PERFORMED PRELIMINARY IR&D EXPERIMENTS AND NUMERICAL SIMULATION OF THE INTERACTION OF LASERS WITH SOLID TARGETS. THE RESULTS SUGGEST THAT A CERTAIN CLASS OF LASERS MAY BE USEFUL IN SIMULATING AT LEAST TWO IMPORTANT NUCLEAR WEAPON EFFECTS: (1) THE SCALED ELECTROMAGNETIC RESPONSE OF A CONDUCTING BODY, AND (2) THE SOFT ELECTRON EMISSION SPECTRUM. THIS PROGRAM IS A JOINT EXPERIMENTALAND THE ...

    SBIR Phase II 1986 Department of DefenseDefense Threat Reduction Agency
  7. METHODS TO UNDERSTAND AND ANALYZE AGING EFFECTS

    SBC: Sea Consultants            Topic: N/A

    IN ORDER TO DEVELOP AN ACCURATE, ANALYTICAL REPRESENTATION OF THE EQUIPMENT AGING PROCESS, THE INTERACTIVE EFFECTS OF TTHE AGING PHENOMENON MUST BE UNDERSTOOD. FOR COMPLEX EQUIP MENT, THE INTERACTIVE EFFECT CAN BE DETERMINED BY PARTITION ING THE EQUIPMENT INTO SMALLER REPLACEABLE PARTS, DEFINING THE AGING AFFECTRS ON THE PARTS, AND THEN COMBINING THE PARTLEVEL EFFECTS TO REFLECT THE ASSEMBLED EQUI ...

    SBIR Phase II 1986 Nuclear Regulatory Commission
  8. INSTRUMENT FOR RADIATION TESTING/SCREENING ELECTRONIC DEVICES OVER THE DOD TEMPERATURE RANGE

    SBC: Aracor            Topic: N/A

    A PHASE II PROGRAM IS PROPOSED LEADING TO THE DEVELOPMENT OFAN INSTRUMENT THAT PROVIDES AN ACCURATE, COST-EFFECTIVE CA- PABILITY FOR MAKING RADIATION TOTAL=DOSE MEASUREMENTS OVER THE TEMPERATURE RANGE OF -55 DEG C TO 200 DEG C. THE INSTRUMENT WOULD BE UNIQUELY SUITED FOR THE RADIATION TESTING AND SCREENING OF COMPLEX ELECTRONIC DEVICES, SUCH AS VHSIC TEST CHIPS AND INTEGRATED CIRCUITS, AS WELL AS ...

    SBIR Phase II 1987 Department of DefenseDefense Threat Reduction Agency
  9. DUSTY FLOW PRESSURE GAUGE DESIGN ANALYSIS

    SBC: Fluid Physics Ind.            Topic: N/A

    THE PROBLEM OF GAS DYNAMIC FLOW PROPERTY MEASUREMENT IN PARTICLE LADEN FLOWS IS ADDRESSED VIA AN ADVANCED NUMERICAL MODEL SIMULATION STUDY OF PRESSURE GAUGE RESPONSE. THE APPROACH UTILIZES A HIGH-ORDER ACCURATE NUMERICAL SOLUTION TECHNIQUE FOR TURBULENT TWO-PHASE FLOWS. GAUGES OF EXISTING DESIGN SUCH AS THE GREG/SNOB GAUGES WILL BE ANALYZED OVER A RANGE OF CLEAN AND DUSTY AIRBLAST FLOW ENVIRONMENT ...

    SBIR Phase II 1987 Department of DefenseDefense Threat Reduction Agency
  10. "EXTENDING A HCLPF-BASED SEISMIC MARGIN REVIEW TO ANALYZE PLANT DAMAGE STATES AND THE ROLE OF HUMAN FACTORS AND NON-SEISMIC FAILURES"

    SBC: Future Resources Associate Inc            Topic: N/A

    TECHNIQUES HAVE RECENTLY BEEN DEVELOPED TO ANALYZE THE 'SEISMIC MARGIN' OF A NUCLEAR POWER PLANT USING THE HCLPF CONCEPT (HIGH CONFIDENCE OF A LOW PROBABILITY OF FAILURE). STARTING WITH AN EARTHQUAKE LEVEL SHOSEN FOR MARGIN REVIEW, THE TECHNIQUE DETERMINES WHETHER THE PLANT CAN OR CANNOT 'WITHSTAND THE REVIEW-EARTHQUAKE WITHOUT CORE DAMAGE. HERE 'WITHSTAND' MEANS 'WITHSTAND WITH A HIGH CONFIDENCE ...

    SBIR Phase II 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government