You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
AUTOMATED TERCOM PLACEMENT AND EVALUATION
SBC: Systems Control Technology, Topic: N/ADETERMINING SITES TO BUILD NEW TERCOM MAPS HAVE PROVEN TO BE A VERY COMPLICATED AND TIME CONSUMING TASK, AS EVIDENCED IN BOTH SIOP CRUISE MISSILE PLANNING AND OPERATION DESERT STORM. THE CRUISE MISSILE PLANNER, WITH SOME DIFFICULTY, CAN DETERMINE NEEDED CANDIDATE TERCOM SITES, BUT ALL TOO OFTEN, BECAUSE OF INSUFFICIENT TERRAIN ROUGHNESS, THE DEFENSE MAPPING AGENCY (DMA) IS UNABLE TO CREATE A TERCO ...
SBIR Phase II 1993 Department of DefenseDefense Threat Reduction Agency