You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Smart Well Assessment and Reservoir Management System (SWARMS)

    SBC: OCEANIT LABORATORIES INC            Topic: 22PH4

    Pipeline and Hazardous Materials Safety Administration (PHMSA) is actively involved in the safe transportation of energy and hazardous material that are vital to daily lives. This also includes underground natural gas storage (UNGS) maintenance and safe operation which are critical to nation's energy infrastructure. Enhancing leak detection and identifying smart ways to prevent potential well blow ...

    SBIR Phase II 2023 Department of Transportation
  2. Windowless radiation hard alpha and beta detector

    SBC: ADVENT DIAMOND, INC.            Topic: DTRA192006

    Field-portable radiation detectors are a widely used technology for defense, environmental monitoring, and industry applications dealing with radioactive sources. From nuclear weapon accident emergencies to routine monitoring for health and safety, having reliable, field ready equipment is essential for mission success. However, the alpha and beta radiation detectors currently available in the mar ...

    SBIR Phase II 2022 Department of DefenseDefense Threat Reduction Agency
  3. Crushed Aggregate Gradation Evaluation System

    SBC: OCEANIT LABORATORIES INC            Topic: 20FR4

    Crushed aggregate is used as railroad ballast, drainage and stabilization material. Fouling of this aggregate reduces its performance: it loses its ability to drain water resulting in reduced strength. Substructure failure is a leading cause of rail accidents and it is a strategic priority to develop new methods for monitoring ballast condition. The challenge is that aggregate fouling does not pre ...

    SBIR Phase II 2021 Department of Transportation
  4. RF Viper System for Wrong-Way Drivers

    SBC: RS International, LLC            Topic: 20FH1

    RF Viper is a novel next generation system to stop wrong-way drivers (WWD) on ramps. It is the “vehicle-to- infrastructure” missing component of the current Alert & Warning systems installed in many states. Like a true viper that uses its fangs to inject venom and incapacitate its prey, the RF Viper emits energy that interrupts vehicle engine electronics, stops the engine, incapacitating the v ...

    SBIR Phase II 2021 Department of Transportation
  5. No-Dig Point Repair Technology for Steel O&G Pipelines

    SBC: Quakewrap, Inc.            Topic: 20PH2

    PHMSA reports a total of 5,745 pipeline incidents with 282 deaths and 1,193 injuries in the 20-year period from 2000 through 2019. Moreover, these incidents cost $10,419,311,449 in damages. Most oil and gas (O&G) transmission pipes are repaired externally by excavating around a damaged or leak site, preparing the pipe surface, and mechanically installing a repair product such as a clamp or wrap on ...

    SBIR Phase II 2021 Department of Transportation
  6. A Music Creation Engine to Improve Algebra Readiness

    SBC: Muzology, LLC            Topic: 91990021R0003

    Not available

    SBIR Phase II 2021 Department of EducationInstitute of Education Sciences
  7. A User-Contextualized ROI Tool to Make Meaning of Lifetime Costs and Tradeoffs Associated with Different Degree Programs

    SBC: Vantage Point Consulting Inc.            Topic: 91990019R0016

    At the end of Phase II, the researchers will launch Return on College (ROC). Two versions of ROC will be developed. Using ROC-A, students will be able to search colleges nationwide based on geographic location and occupational goals with personalized output on projected debt, loan repayment, disposable income, graduation risk, and ROI the focal points of these decisions. Using ROC-B, prospective s ...

    SBIR Phase II 2020 Department of EducationInstitute of Education Sciences
  8. Enhancing Administrator Coaching of Classroom Teachers

    SBC: Liveschool Inc.            Topic: 99190018R0005

    Purpose: In previous research and development, the team created LiveSchool, a technology for teachers to report student behavior in their class. In this project, the team will fully develop and test ClassCoach, a dashboard for administrators to track student behavior and to recommend resources teachers can use to address student behavioral needs in their classes. Over the past several years, schoo ...

    SBIR Phase II 2018 Department of EducationInstitute of Education Sciences
  9. Low Voltage Radiation Hardened Optoelectronics for Optical Interconnects

    SBC: Quanttera LLC            Topic: DTRA152001

    The Defense Threat Reduction Agency (DTRA) recognizes the need for low-power high-bandwidth radiation-hard optical interconnects to process more data more quickly and to replace electronic data.Our companys core development in optical communications with semiconductor materials is a unique fit for DTRAs low-power consumption high-bandwidth radiation-hard intra-chip communication components for sat ...

    SBIR Phase II 2018 Department of DefenseDefense Threat Reduction Agency
  10. Hierarchical, Layout-Aware, Radiation Effects Tools Vertically Integrated into an EDA Design Flow for Rad-Hard by Design

    SBC: RELIABLE MICROSYSTEMS LLC            Topic: DTRA16A003

    The goal of this workis to establish a radiation-aware capability in a commercial EDA design flow that will enable first-pass success in radiation resiliency for DoD ASIC designs in much the same way that existing EDA design suites ensure first pass functionality and performance success of complex ASICs destined for commercial applications.Such an integrated capability does not presently exist.The ...

    STTR Phase II 2018 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government