You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
LoomVue Browser: Supporting Language Learning with a Dynamic Diglot Weave
SBC: KING'S PEAK TECHNOLOGY, INC. Topic: 91990021R0003Not available
SBIR Phase II 2021 Department of EducationInstitute of Education Sciences -
IED Neutralization from an Airborne Platform- IMSAR Phase II Proposal
SBC: IMSAR LLC Topic: DTRA182001IMSAR proposes to detect IEDs using an airborne radar, neutralize IEDs using an air-dropped neutralization vehicle, and assess the results all from an Unmanned Aircraft System (UAS) platform.
SBIR Phase II 2020 Department of DefenseDefense Threat Reduction Agency -
Novel Munition Technologies to Attack and Defeat Weapons of Mass Destruction (WMD)
SBC: HYPERION TECHNOLOGY GROUP INC Topic: DTRA143004Traditional weapon systems often fail to meet the requirements of close combat typical of the previously discussed engagement, where insurgents often blend in or store weapon amongst friendly or non-combatant forces, to shield them from precision strike munitions of a technologically superior force. This type of warfare has led to an increased focus on the use of less-lethal weapons, to reduce let ...
SBIR Phase II 2017 Department of DefenseDefense Threat Reduction Agency -
Lithography Cost Reduction for Rad Hard Integrated Circuits
SBC: SILICON TECHNOLOGIES, INC. Topic: DTRA143008The DoD faces mounting costs for integrated circuits built with advanced technology. Our proposal addresses mixed-signal ASIC design costs and fabrication costs, notably photomask costs and photolithography costs. The ADONIS 1D design methodology has been demonstrated at technologies ranging from 130nm to 16nm. In Phase I of the program, we used ADONIS to design a reference circuit a high-speed c ...
SBIR Phase II 2017 Department of DefenseDefense Threat Reduction Agency -
Advanced Fast Shutter for Debris Mitigation
SBC: HYPERION TECHNOLOGY GROUP INC Topic: DTRA143007In an effort to development more robust optical system coatings DTRA, in collaboration with Sandia National Labs, is working to characterize the degradation of optical materials for space systems when exposed to high intensely EUV/ cold x-rays. The experiments utilizes the Double Eagle z-pinch facility which generates high current, high voltage arc pinch plasma to produce an intense EUV and cold x ...
SBIR Phase II 2017 Department of DefenseDefense Threat Reduction Agency -
DEVELOPMENT OF A RESIDUAL IN-SITU STRESS GAUGE
SBC: Terra Tek Inc. Topic: N/AQUANTITATIVE VERIFICATION OF THE RESIDUAL IN-SITU STRESS FIELD WHICH CREATES THE CONTAINMENT CAGE IS NEEDED TO ASSESS THE FACTOR OF SAFETY AGAINST HYDRAULIC FRACTURING FROM THE CAVITY WALL. PHASE I WILL ESTABLISH THE FEASIBLITY OF DEVELOPING A PASSIVE STRESS GAUGE, ABSENT OF ACTIVE INSTRUMENTATION, AND CAPABLE OF RECORDING THE RESIDUAL IN-SITU STRESS FIELD IMMEDIATELY FOLLOWING THE NUCLEAR DEVICE ...
SBIR Phase II 1991 Department of DefenseDefense Threat Reduction Agency