You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Development of Intelligent Composites using Integrated SMART Layer Technology

    SBC: ACELLENT TECHNOLOGIES INC            Topic: N/A

    Reliability and structural safety are major concerns in the design of next-generation space transportation and systems. Acellent Technologies, Inc. Proposes to develop and innovative, cost-effective and reliable built-in structural diagnostic system forlight-weight large-scale space structures made of composite materials to monitor their integrity during service thereby prolonging life span, red ...

    SBIR Phase II 2001 Department of DefenseMissile Defense Agency
  2. Munition Effectiveness Modeling and Technology Integration Research

    SBC: ACTA, LLC            Topic: N/A

    A 24-month Phase II project is proposed to develop and implement models that capture the fidelity of high fidelity physics-based (HFPB) models in a fast-running format. It is anticipated that such models will be incorporated in certain modules of theModular Effectiveness/Vulnerability Assessment (MEVA) code developed for and currently used by the Air Force for assessing munitions effectiveness an ...

    SBIR Phase II 2001 Department of DefenseAir Force
  3. N/A

    SBC: 3dgeo Development Inc.            Topic: N/A

    This Small Business Innovation Research (SBIR) Phase II project will develop a seismic processing system that enables the delivery of leading-edge seismic services over the Internet and Intranets. Internet-based seismic processing (INSP) enables exploration companies to directly control their critical seismic imaging projects, without the need of purchasing and maintaining expensive hardware and s ...

    SBIR Phase II 2001 National Science Foundation
  4. N/A

    SBC: ADVANCED FUEL RESEARCH, INC.            Topic: N/A

    Not Available This Small Business Innovation Research (SBIR) Phase II project will develop a real-time, whole wafer sensor for process monitoring and fault detection in advanced semiconductor and thin film fabrication processes. The production of future semiconductor and optoelectronic devices will depend critically on continued advances in process sensing and control. In present-day manufacturing ...

    SBIR Phase II 2001 National Science Foundation
  5. Control Sensor for Turbine Engine Augmentor Rumble and Screech

    SBC: ADVANCED FUEL RESEARCH, INC.            Topic: N/A

    During aircraft turbine engine operation, augmentor (afterburner) operation is often associated with combustion instabilities (oscillations) that can be potentially detrimental to the turbine engine if the resonant amplitude levels are excessive.Oscillation in the frequency range of 50-100 Hz is commonly called

    SBIR Phase II 2001 Department of DefenseAir Force
  6. N/A

    SBC: ADVANCED FUEL RESEARCH, INC.            Topic: N/A

    This subtopic solicited Phase I R&D for an advanced Fourier transform infrared (FT-IR) system that would provide fast-scanning high resolution (3 scans/sec at 1cm-1 resolution), low noise, mid-infrared measurements for characterization of spray flames. In Phase I, Advanced Fuel Research, Inc. (AFR) demonstrated FT-IR emission/transmission (E/T) measurements from the NIST spray combustion faci ...

    SBIR Phase II 2001 Department of Commerce
  7. N/A

    SBC: ADVANCED FUEL RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase II 2001 National Science Foundation
  8. N/A

    SBC: 4th Wave Imaging Corporation            Topic: N/A

    This Small Business Innovation Research (SBIR) Phase II project concerns the development and implementation of seismic imaging and inversion methods and parallel computer algorithms to estimate subsurface fluid-flow properties from time-lapse seismic data. In recent years, there has been exponential growth in time-lapse seismology project activity. These projects have yielded seismic difference an ...

    SBIR Phase II 2001 National Science Foundation
  9. Extraction of Rocket Propellant Physical Properties Via Computed Tomography

    SBC: Aracor            Topic: N/A

    The objective of this SBIR project is to develop enhanced capabilities to evaluate solid rocket motors (SRMs) using x-ray computed tomography (CT) inspection. In Phase I, approaches were defined for developing technology to improve CT inspectioncapabilities. In Phase II, the technology will be developed and incorporated in practical tools to be delivered to OO-ALC at Hill AFB, where Air Force mi ...

    SBIR Phase II 2001 Department of DefenseAir Force
  10. Flow Advanced Simulation Tool

    SBC: AERO OPTICS, INC.            Topic: N/A

    A comprehensive rigorous unified physical formulation and accurate efficient robust computation technique are described for simulating complex compressible viscous reacting multiphases flow phenomena which can affect or control the performance or signatureof a flight vehicle during al phases of operation. The method is designed to enable continuous seamless predictions for internal, external, and ...

    SBIR Phase II 2001 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government