You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. FPGA-Based End-Station Security for High-Performance Networking

    SBC: Acadia Optronics, Llc            Topic: 52b

    Traditional enterprise cyber-security methods are inadequate to address the increasing number of threats, particularly within larger and higher-performance networks. Several government and third party organizations report consistent failures within corporate and federal, state, and local government networks. A key point of failure in securing these networks is the centralized security architectu ...

    SBIR Phase II 2010 Department of Energy
  2. Advanced Canopy and Window Materials for Improved Helicopter and Aircrew Survivability

    SBC: ACREE TECHNOLOGIES INCORPORATED            Topic: N091014

    The purpose of this project is to demonstrate the feasibility of applying an advanced, multifunctional coating system to aircraft window materials to increase their resistance to electromagnetic interference (EMI) and to improve eye protection from low-power laser exposure. The project will study the control of transmission at selected laser hazard wavelengths and the reduction of solar effects fr ...

    SBIR Phase II 2010 Department of DefenseNavy
  3. A Scalable Distributed Client Based Meta Search and Discovery Infrastructure

    SBC: Weblib, Llc            Topic: 64a

    Web searching has become a ubiquitous and indispensable activity for a wide spectrum of human endeavors. The success of Google and its competitors depends on extensive software and network infrastructures and costly hardware. Federated search engines, such as Science.gov, WorldWideScience.org and ScienceEducation.gov also run on powerful, albeit much smaller, server clusters that connect to divers ...

    SBIR Phase II 2010 Department of Energy
  4. Tailoring Training for Disparately Skilled Participants in Large Scale Training Exercises

    SBC: ADVANCED INFONEERING, INC.            Topic: N09T007

    The SKATE concept was designed to quantify skill levels of trainees, teams, or units, generate skill-appropriate training scenarios, and provide a continuous skill-level assessment of disparately skilled trainees, teams, and units in a joint training exercise while maintaining the overall integrity and realism of the mission itself. SKATE evaluates the skill level of an individual, teams, or unit ...

    STTR Phase II 2010 Department of DefenseNavy
  5. Coupled Viscous Vortex Particle Method and Unstructured CFD Solver for Rotorcraft Aerodynamic Interaction Modeling

    SBC: ADVANCED ROTORCRAFT TECHNOLOGY, INC.            Topic: N09T009

    The rotorcraft aerodynamic interaction is a complicated problem and remains an extremely challenging aspect of rotorcraft analysis. This STTR is dedicated to developing a solution for the complicated rotorcraft aerodynamic interaction problem. The Phase I research coupled a state-of-the-art vortex particle method (VPM) with an unstructured Navier-Stokes CFD body surface solver and prototyped a hyb ...

    STTR Phase II 2010 Department of DefenseNavy
  6. Night Vision Goggles Mission Rehearsal Night Labs Advanced Prototyping Test and Evaluation

    SBC: AECHELON TECHNOLOGY            Topic: N04156

    Aechelon Technology Night Mission System is the result of the Phase I and II efforts of the SBIR N014-156, “New Modeling and Simulation Technology for Night Vision Goggle Mission Rehearsal”. The system provides a computer simulation based replacement for the NVG terrain board, and is designed to be installed and operated in NiteLabs around the World. Aechelon Technology will provide two pre-pr ...

    SBIR Phase II 2010 Department of DefenseNavy
  7. Automatic User Interface Configuration Management

    SBC: Anacapa Sciences, Inc.            Topic: N091061

    During Phase I of this SBIR effort, Anacapa Sciences, Inc. invented a new technology for analyzing and optimizing the design of critical aspects of the User Interfaces (UIs) for real-time systems that have high urgency for errorless operator performance. The technology is based on machine-learning algorithms currently used in commercial data mining applications. We discovered that this class of al ...

    SBIR Phase II 2010 Department of DefenseNavy
  8. Expendable Electro-Optic Infrared Camera System

    SBC: Arete Associates            Topic: N05138

    The Forward Observer Laser Designator Unmanned Aerial System (FOLD-UAS) concept has been developed as the airborne component of the Precision Urban Mortar Attack (PUMA) program. The PUMA program has targeted the tier II STUAS as the unmanned aerial vehicle of choice for this program. A successful Phase II FOLD-UAS demonstration provides a significant risk reduction of the airborne ISR & T portion ...

    SBIR Phase II 2010 Department of DefenseNavy
  9. Ocean Characterization Tools

    SBC: Arete Associates            Topic: N06002

    The Navy has invested considerable resources in research and development of state-of-the-art characterizations of the ocean response to ambient and perturbed surface and subsurface structures and related techniques to discriminate natural and anthropogenic, motion-induced perturbations. This investment has included exploration of different sensing modalities as well as development of processing al ...

    SBIR Phase II 2010 Department of DefenseNavy
  10. Planar, High Frequency, Power Conversion Device Technology

    SBC: TRANSPHORM, INC.            Topic: N09T023

    Transphorm proposes to demonstrate a normally off fast high voltage Gallium Nitride power switch solution. The switch would block to 1200V, have a threshold voltage greater than 5 V, and the phase 2 switch will target an on resistance less than 15 ohm-mm and current more than 1 Amp. To accomplish these targets, Transphorm will combine the design requirements of realizing a high (and positive) thre ...

    STTR Phase II 2010 Department of DefenseNavy
US Flag An Official Website of the United States Government