Transportation System Performance Measurement Using Existing Loop Infrastructure
SBC: CLR ANALYTICS INC Topic: 102FH2With continuing emphasis on transportation sustainability and fiscal stewardship, utilizing existing loop detector infrastructure to obtain more accurate, reliable and comprehensive traffic system performance measures is desired by many transportation agencies. In Phase I study, we found that the capability of the Inductive Loop Detector (ILD) signature technology to re-identify and classify vehic ...
SBIR Phase II 2013 Department of Transportation -
Smartphone Signal Alert Status
SBC: Savari Inc. Topic: 111FH1The primary objective for Phase I was to design and develop a proof of concept system demonstrating the basic functionality and feasibility to deploy technology in the field. During the six-month effort, a detailed Concept of Operations document was prepared that served as a foundation for the design and development of the SmartCross system. The core components of the system: (a) Smartphone applic ...
SBIR Phase II 2013 Department of Transportation -
Augmenting Inductive Loop Vehicle Sensor Data with SPAT and GrID (MAP) via Data Fusion
SBC: Savari Inc. Topic: 111FH2In this proposal, we have proposed a program for twenty months to build on the basic ideas and feasibility developed in Phase I of this SBIR in order to demonstrate the practical use of DSRC technologies with signal controller for adaptive timing with a goal towards commercialization. Specifically, we intend to further develop, build and integrate advanced signal control algorithms that make use o ...
SBIR Phase II 2013 Department of Transportation -
Innovative Multi-cellular Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase II 2001 Department of Transportation