You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Irradiated Environmental Chambers
SBC: MEASUREMENT ANALYSIS CORPORATION Topic: N/AUsing a novel concept for humidity control, based on a proprietary saturated air source, MAC will construct and evaluate a prototype of an environmental chamber for use with NIST’s SPHERE UV source, in weathering or other UV degradation studies. The chamber will interface to the exit ports of the SPHERE, maintaining the material coupons, mounted in a standardized sample holder, at a programmed t ...
SBIR Phase II 2012 Department of CommerceNational Institute of Standards and Technology -
Program Estimating Whale Migration Statistics
SBC: TOYON RESEARCH CORPORATION Topic: 816FToyon proposes to develop a system that can automatically count the number of gray whales that pass nearby a shore-based installation. The system will be comprised of infrared cameras and a set of computers, which automatically scan the video for whale blows. We have implemented and tested such an algorithm using Matlab during Phase I and we propose to extend this algorithm to run in real time dur ...
SBIR Phase II 2012 Department of Commerce -
Low-Cost Transportable HF Skywave Radar
SBC: CODAR OCEAN SENSORS, LTD Topic: N/AN/A
SBIR Phase II 2001 Department of Commerce -
Cyclops Abyssal Benthic Sampler: (CABS)
SBC: Cyclops Research & Development, Inc. Topic: N/ANot Available Not Available
SBIR Phase II 2001 Department of Commerce -
N/A
SBC: MANUFACTURING INSTRUMENTATION CONSULTANT Topic: N/AScanning Probe Microscopy (SPM) has become a very popular tool in many areas of inquiry including surface science, semiconductor electronic devices and integrated circuit design and testing, biology and chip-tissue interface, to name a few. Here we propose to develop and commercialize a relatively new family of local probes capable of performing electromagnetic measurements with nearly atomic ...
SBIR Phase II 2001 Department of Commerce -
N/A
SBC: METROLASER, INCORPORATED Topic: N/AThis is a Phase 2 proposal to develop an instrument to simultaneously measure particle size, velocity, and concentration in applications characterized by a large size range and high particle concentration. The instrument will be based on the Pulse Displacement Technique whose feasibility was demonstrated during Phase 1. Experiments performed during Phase 1 demonstrated a high accuracy in meas ...
SBIR Phase II 2001 Department of Commerce -
Development of Real-Time PCR Assays for the Detection of Viruses in Penaeid Shrimp
SBC: Super Shrimp, Inc. Topic: N/AN/A
SBIR Phase II 2001 Department of Commerce -
N/A
SBC: XIA LLC Topic: N/AAs flip-chip bonding becomes the predominant standard in the electronics industry, the increased proximity between dice surfaces and packaging materials will require a significant reduction in the latter's alpha particle activity in order to avoid soft errors. Emission rates at or below 0.001 a/cm2/hr are desirable, which is well below the 0.0050 a/cm2/hr capability of today's best detectors. ...
SBIR Phase II 2001 Department of Commerce -
N/A
SBC: X-RAY OPTICAL SYSTEMS, INC. Topic: N/AThis SBIR Phase II project will significantly improve the quality of elemental analysis in SEMS under partial pressure conditions by using a polycapillary x-ray optic in front of the energy dispersive spectrometer (EDS) in low-vacuum scanning electron microscopes (LV-SEM) or environmental SEMs (ESEM). LV-SEMS and ESEMs are designed to work at elevated sample chamber pressures to allow analysi ...
SBIR Phase II 2001 Department of Commerce -
N/A
SBC: STOTTLER HENKE ASSOCIATES, INC Topic: N/AAs ever more of industry and commerce moves onto electronic networks, there is a growing appreciation for the usefulness of expressive general models of enterprise activities, such as design and manufacturing. Ontologies are commitments to formal declarative multi-purpose representations with clear semantics that can serve as a solid foundation for such models. While there has been much work ...
SBIR Phase II 2001 Department of Commerce