You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Control Sensor for Turbine Engine Augmentor Rumble and Screech

    SBC: ADVANCED FUEL RESEARCH, INC.            Topic: N/A

    During aircraft turbine engine operation, augmentor (afterburner) operation is often associated with combustion instabilities (oscillations) that can be potentially detrimental to the turbine engine if the resonant amplitude levels are excessive.Oscillation in the frequency range of 50-100 Hz is commonly called

    SBIR Phase II 2001 Department of DefenseAir Force
  2. N/A

    SBC: ADVANCED FUEL RESEARCH, INC.            Topic: N/A

    This subtopic solicited Phase I R&D for an advanced Fourier transform infrared (FT-IR) system that would provide fast-scanning high resolution (3 scans/sec at 1cm-1 resolution), low noise, mid-infrared measurements for characterization of spray flames. In Phase I, Advanced Fuel Research, Inc. (AFR) demonstrated FT-IR emission/transmission (E/T) measurements from the NIST spray combustion faci ...

    SBIR Phase II 2001 Department of Commerce
  3. Advanced Rain and Dust Erosion Resistant Coating Systems

    SBC: HONTEK CORP.            Topic: N/A

    Rain and dust erosions on aircraft forward facing surfaces such as leading edges, engine inlets, nose radomes, propeller blades, and antennas are serious problems. Due to increasing optical missile threats more low gloss rain erosion coatings are beingused. Current commercial lusterless gray rain erosion coating failed the rain test within 36 minutes when tested at 500mph under 1

    SBIR Phase II 2001 Department of DefenseAir Force
  4. High Accuracy, Automated Satellite Surveillance Network

    SBC: OCEANIT LABORATORIES INC            Topic: N/A

    Oceanit has successfully shown in Phase I that highly accurate (sub-arcsecond) observations are obtainable utilizing a relatively low-cost COTS system. These highly accurate angular observations can be introduced into the orbit determination process as asupplement to high-quality range data. These improved angular observations help resolve the geometric ambiguity of range-only orbit determinatio ...

    SBIR Phase II 2001 Department of DefenseAir Force
  5. KW Class Fiber Lasers

    SBC: PC PHOTONICS            Topic: N/A

    The double-clad multicore fiber laser has proven to be the most efficient, optically-pumped laser. In Phase I, we have demonstated that phase-locking occurs spontaneously among a group of closely packed single mode fiber lasers configured isometrically ina common cladding. This result suggests that, by using our unique power combining technique developed at PC Photonics Corporation, high power o ...

    SBIR Phase II 2001 Department of DefenseAir Force
  6. Artificial Intelligence Hybrid Range Scheduler

    SBC: QUANTUM LEAP INNOVATIONS, INC.            Topic: N/A

    Scheduling is a complex, NP-hard problem that challenges the use of any single solution technique. In Phase I, we built a model that uses our multi-technique Quantum Leap Problem Solving Engine to solve a representative but simplified version of the AirForce Satellite Control Network (AFSCN) contact scheduling problem. The system demonstrated that it could schedule the hundreds (500 to 600) of t ...

    SBIR Phase II 2001 Department of DefenseAir Force
  7. Cubic Silicon Carbide Substrates

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    Silicon carbide promises near-term insertion in high power, high temperature, applications. The wide band-gap and consequent high breakdown field of silicon carbide theoretically allows efficient high power solid state power amplifiers. Its high thermal conductivity will permit compact devices and high power density. To date, virtually all silicon carbide-based devices have been fabricated using 6 ...

    SBIR Phase II 1994 Department of DefenseAir Force
  8. IN-SITU OPTICAL DIAGNOSIS AND CONTROL OF PULSED LASER DEPOSITION OF HIGH TC SUPERCONDUCTOR THIN FILMS

    SBC: ADVANCED FUEL RESEARCH, INC.            Topic: N/A

    ALTHOUGH MANY POTENTIAL TECHNOLOGIES EXIST FOR DEPOSITING EXOTIC THIN FILM DEVICES, CONTROLLING THE MATERIAL PROPERTIES HAS BEEN A MAJOR STUBLING BLOCK TO ACHIEVING SUCCESSFUL AND REPRODUCIBLE DEVICE PROPERTIES. IN THE CASE OF PULSED LASER DEPOSITION (PLD) OF HIGH TC SUPERCONDUCTOR FILMS, THE EMISSION OF THE PLASMA CAN BE CORRELATED WITH THE QUALITY OF FILMS DEPOSITED. BUT THIS MEASUREMENT PROVIDE ...

    SBIR Phase II 1994 Department of Commerce
  9. ADVANCED COATING TECHNOLOGY FOR HIGH PERFORMANCE GAS TURBINE COMPONENTS

    SBC: JET PROCESS CORP            Topic: N/A

    We proposed in collaboration with Pratt & Whitney to develop advanced coating technology for high-performance gas turbine components, utilizing our innovative, patented, pollution-free, low cost Jet Vapor Deposition process. The JVD process uses supersonic jets in "low vacuum" to propel atoms, molecules, or clusters toward substrates. JVD offers: (1) extremely high rates of concentrated, efficient ...

    SBIR Phase II 1994 Department of DefenseAir Force
  10. CONFORMANCE TESTING FOR INTERMEDIATE SQL- 1992

    SBC: Software Development Group            Topic: N/A

    ANSI HAS COMPLETED A NEW STANDARD FOR DATABASE LANGUAGE SQL, SQL - 1992. THIS STANDARD IS COMPOSED OF THREE LEVELS OF CONFORMACE, FULL SQL, INTERMEDIATE SQL, AND ENTRY SQL. ENTRY SQL IS A SLIGHTLY ENHANCED VERSION OF THE SQL - 1989 STANDARD. THE NIST HAS ACCEPTED THE ANSI SQL-1992 STANDARD WITH SOME MODIFICATIONS. THEY ALSO ADDED ANOTHER LEVEL, TRANSITIONAL SQL, BETWEEN INTERMEDIATE SQL AND ENTRY ...

    SBIR Phase II 1994 Department of Commerce
US Flag An Official Website of the United States Government