You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Navigation and Object-Location System to Assist Blind and Low-Vision Individuals in Indoor Environments

    SBC: CREATEABILITY CONCEPTS INC            Topic: N/A

    This project demonstrates the technical merit, feasibility, and cost-effectiveness of combining ground-breaking Radio Frequency Identification (RFID) technology with an innovative approach and state of-the-art software to deliver a system capable of removing barriers in vocational settings. This system assists individuals with disabilities to orient themselves and safely navigate in vocational env ...

    SBIR Phase II 2010 Department of Education
  2. Variable Position Mid-Wheel Drive System for Power Wheelchairs

    SBC: Criterion Health, Inc.            Topic: N/A

    This project designs, constructs, and evaluates a concept model based on current mid wheel designs. The concept model uses a variable position drive wheel system that can move forward or backward from the mid-wheel position using a simple mechanical system to change the position of the drive wheels. A series of five structured tests for maneuverability and/or stability are used to compare performa ...

    SBIR Phase II 2010 Department of Education
  3. GISARO- Phase II

    SBC: Bashpole Software, Inc.            Topic: SB091003

    Several geo-social inference concerns currently limit military stability and reconstruction operations: • Contact lists are not centrally coordinated, up to date, complete, or easily searchable • Vendor history is not maintained or combined with culture and safety information • Hand-off and coordination delays cause projects to span multiple troop cycles The proposed project answers the unde ...

    SBIR Phase II 2010 Department of DefenseDefense Advanced Research Projects Agency
  4. Advanced Development for Defense Science and Technology

    SBC: Conflict Kinetics            Topic: ST081001

    Conflict Kinetics proposes to develop a Close Quarter Marksmanship next generation training platform, the Adaptive Panoramic TORA (TORA Apan 220), that will be fully automated and self diagnostic. It will guide soldiers through drills and trigger corrective drills that address deficiencies identified in their marksmanship skills. The Phase II effort will include the following objectives: modify ...

    STTR Phase II 2010 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government