You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Zero-Venting Regenerable Lightweight Heat Absorber for EVA Suits

    SBC: CREARE LLC            Topic: N/A

    Future manned space exploration missions will require life support systems that conserve resources while meeting extremely challenging requirements for light weight and small size. We propose to develop an innovative heat absorber for the thermal control system in EVA suits that is non-venting, regenerable, light weight, and compact. The system can provide 250 W of cooling for four hours with a ma ...

    SBIR Phase II 2002 National Aeronautics and Space Administration
  2. ZERO-G CONDENSATE MANAGEMENT DEVICE FOR AMTEC CELLS

    SBC: CREARE LLC            Topic: N/A

    N/A

    SBIR Phase II 1993 National Aeronautics and Space Administration
  3. 1024 x 1024 Snapshot Two-Color Infrared Focal Plane Array (FPA) for Air-to-Ground Applications

    SBC: ADVANCED DEVICE TECHNOLOGY, INC.            Topic: N05032

    We propose to develop “High Performance, Large Format Mid-Wave Focal Plane Arrays on Type II Strained Layer Superlattice (SLS) Material”. The Innovative Features of the project are: • Detector Arrays on Type II SLS Material. High Performance Detector Arrays are designed on Type II SLS material. The Type II Detector has several advantages as compared to Type I HgCdTe and InSb Detectors. The ...

    SBIR Phase II 2006 Department of DefenseNavy
  4. 128X128 ELEMENT MONOLITHIC DUAL BAND HGCDTE STARING ARRAYS

    SBC: ADVANCED DEVICE TECHNOLOGY, INC.            Topic: N/A

    MISSILE SEEKERS MUST DETECT TARGETS IN DUAL BANDS (3-5 UM AND 8-12 UM). THEY NOW USE HYBRID ASSEMBLY OF TWO SEPARATE ARRAYS, WHICH INCREASES THE POWER, CONSUMPTION, THE WEIGHT, AND THE COST. WE WILL DEVELOP MONOLITIHIC DUAL BAND 128X128 STARING ARRAYS ON HGCDTE MATERIAL. THE INNOVATION IS THE DETECTION OF BOTH LONG AND SHORT WAVE SIGNALS IN THE SAME PIXEL SIMULTANEOUSLY. FABRICATION METHODS ARE DE ...

    SBIR Phase II 1992 Department of DefenseMissile Defense Agency
  5. 640x512 Dualband Longwave/Longwave Infrared SLS FPA For Interceptor Seekers

    SBC: QMAGIQ LLC            Topic: MDA10012

    In Phase I we developed a novel infrared photodiode based on Type-II InAs/GaSb strained layer superlattices (SLS) that showed pingpong dualband action, wherein the spectral response of the diode was switched between extended midwave (~ 8 micron cutoff) and longwave (~ 10 micron cutoff) infrared by the polarity of the voltage bias applied across it. In Phase II we will improve quantum efficiency i ...

    SBIR Phase II 2012 Department of DefenseMissile Defense Agency
  6. Wireless and Noise Attenuating Headset for Automated Hearing Screening

    SBC: CREARE LLC            Topic: NIDCD

    DESCRIPTION provided by applicant Hearing loss is a leading public health concern with about of American adults reporting some degree of impairment Of those fewer than seek help for their condition for a variety of reasons To address this issue the National Institue of Deafness and Other Communication Disorders NIDCD is seeking solutions to improve hearing healthcare access and l ...

    SBIR Phase II 2014 Department of Health and Human ServicesNational Institutes of Health
  7. Wide-Field Quantitative Fluorescence Imaging System

    SBC: InSight Surgical Technologies LLC            Topic: 102

    PROJECT SUMMARY In this Fast Track (Phase I + Phase II) SBIR application, we will evaluate feasibility (in Phase I) of an accurate, fast and low-cost instrument (qF-ImageTM) design for accurate wide-field imaging of the absolute concentration of the fluorophore PpIX (CPpIX) in the surgical field for guiding brain tumor resection, and demonstrate that design meets quantitative end-user specificatio ...

    SBIR Phase II 2022 Department of Health and Human ServicesNational Institutes of Health
  8. Wide-Field-of-View Collection Optics for Infrared

    SBC: COMPUTER OPTICS INC.            Topic: AF071280

    Computer Optics Inc.(COI) proposes to examine infra red spectral waveband separation, a key technological issue identified during the Phase I program. At the completion of Phase II, this work will result in significant enabling technology available to be deployed as part of the AIRSS SBIR program.

    SBIR Phase II 2008 Department of DefenseAir Force
  9. Wideband Filter Networks for Joint Tactical Radio System (JTRS) Size, Weight, and Power (SWAP) Reduction

    SBC: Active Spectrum, Inc.            Topic: A07086

    The objective of this proposal is to demonstrate the feasibility of mass producing robust miniaturized, tunable narrowband preselect filters in the 500-2000 MHz bands for fielded JTRS platforms. In the 500 MHz – 2000 MHz frequency bands, we proposed a tunable 2-pole narrowband (30 MHz) preselect filter. Active Spectrum, Inc.’s filters represent a proven, significant improvement over the state ...

    SBIR Phase II 2009 Department of DefenseArmy
  10. WET TURBOEXPANDER FOR CRYOCOOLERS OF SPACEBORNE SURVEILLANCE SENSORS

    SBC: CREARE LLC            Topic: N/A

    THE NEED FOR INCREASING THE SENSITIVITY OF SPACE-BORNE SENSORS WILL REQUIRE DEVELOPMENT OF LONG-LIFE, HIGHLY EFFICIENT HELIUM LIQUIFIERS. CONVENTIONAL HELIUM LIQUIFIERS EMPLOY A JOULE-THOMSON EXPANSION VALVE TO EXPAND THE HELIUM AT TEMPERATURES BELOW ABOUT 10 DEG K. IT HAS BEEN SHOWN THAT GAINS OF UP TO 30% IN OVERALL CYCLE EFFICIENCY CAN BE OBTAINED IF THE JOULE-THOMSON VALVE IS REPLACED BY AN EX ...

    SBIR Phase II 1987 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government