You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 1 - 10 of 3406 results
  1. WEIGHT, COMPACT SOLAR WATER DISTILLATION PURIFICATION DEVICE

    SBC: Abel Company            Topic: N/A

    THIS STUDY WILL EXAMINE THE FEASIBILITY AND PRACTICALITY OF UTILIZING CHARCOAL CLOTH IN A LIGHT-WEIGHT SOLAR POWERED DISTILLATION PURIFICATION DEVICE INCORPORATING CHARCOAL CLOTH AS THE ENERGY ABSORBENT WATER WICK. IN THIS PROPOSED DEVICE, IT IS EXPECTED THAT THE CHARCOAL CLOTH WILL ACT NOT ONLY AS THE DISTILLATION MEDIA, BUT WILL ALSO REMOVE OBJECTIONABLE ODORS, CO-DISTILLABLE ORGANIC COMPOUNDS A ...

    SBIR Phase II 1984 Department of DefenseDefense Advanced Research Projects Agency
  2. TECHNOLOGY FOR PRESSURE-INSTRUMENTED THIN AIRFOIL MODELS

    SBC: Applied Cryogenics & Materials            Topic: N/A

    PRESSURE INSTRUMENTED AIRFOIL MODELS FOR TESTING IN CRYOGENIC WIND TUNNELS DEMAND THE SIMULTANEOUS ACHIEVEMENT OF MANY FACTORS INCLUDING STRENGTH, TOUGHNESS, DIMENSIONAL STABILITY, MACHINABILITY, BONDABILITY, ACCURACY OF PROFILE AND SURFACE FINISH. MANY PREVIOUS MODELS HAVE FAILED TO REACH COMPLETION OR HAVE PERFORMED INADEQUATELY BECAUSE ACHIEVEMENT OF SOME FACTORS HAS CRITICALLY COMPROMISED OTHE ...

    SBIR Phase II 1984 National Aeronautics and Space Administration
  3. BROADBAND TRANSMITTING ANTENNA

    SBC: ASTRON WIRELESS TECHNOLIGIES, INC.            Topic: N/A

    THERE IS A GREAT NEED FOR HF BROADBAND TRANSMITTING ATENNA FOR COMMUNICATIONS AND JAMMING APPLICATIONS. THE MAJOR DISADVANTAGES OF PRESENT NARROW BAND ANTENNAS ARE: SLOW TUNING COUPLERS LIMIT JAMMING SYSTEM RESPONSE TIME AND OPERATIONAL BANDWIDTHS; TO ACHIEVE RESONABLE EFFICIENCIES LARGE ATENNA STRUCTURES ARE REQUIRED, ESPECIALLY AT THE LOWER FREQUENCIES; REQUIRE GOOD GROUND CONDUCTIVITY TO MAINTA ...

    SBIR Phase II 1984 Department of DefenseArmy
  4. ON-THE-BOTTOM SURVEILANCE BUOY

    SBC: Defense Systems Inc.            Topic: N/A

    A SONOBUOY ON THE BOTTOM OF THE OCEAN CAN ACHIEVE LONG DETECTION RANGES BY USE OF THE RELIABLE ACOUSTIC PATH (RAP). BY PUTTING AN ACOUSTIC SIGNAL PROCESSOR IN THE BUOY TO DO SPECTRUM ANALYSIS AND CONTACT REPORT GENERATION, THE DATA TRANSMITTED TO SURVEILLANCE AIRCRAFT CAN BE REDUCED TO SHORT BURSTS ON A SCHEDULE THAT MEETS PATROL AIRCRAFT REVISIT REQUIREMENTS FOR INCREASED AIRCRAFT UTILIZATION AT ...

    SBIR Phase II 1984 Department of DefenseNavy
  5. ADVANCED UNDERSEA TACTICAL COMMUNICATIONS TECHNIQUES

    SBC: Defense Systems Inc.            Topic: N/A

    THERE IS AN INCREASING NEED FOR LONG RANGE (200KM) APPROXIMATELY 10 BPS RATE ACOUSTIC COMMUNICATION AT LOW BIT ERROR RATES IN THE COMMAND AND CONTROL OF ACOUSTIC SURVEILLANCE SYSTEM ELEMENTS, UNDERWATER VEHICLES AND SENSORS. SIMULATED FISH NOISE, CODED TONE AND MULTITONE CW SIGNALS HAVE BEEN USED WITH VARYING SUCCESS. ONLY THE M-ARY, MULTITONE, LONG BAND LOW FREQUENCY WAVEFORMS ARE PRACTICAL FOR L ...

    SBIR Phase II 1984 Department of DefenseDefense Advanced Research Projects Agency
  6. REFINEMENTS FOR EDDY CURRENT TECHNIQUES

    SBC: Epic Sales, Inc. Dba Epic Systems            Topic: N/A

    EDDY CURRENT FIELD INSPECTIONS ARE PRESENTLY PERFORMED BY TECHNICIANS WHO MUST EXAMINE AND EVALUATE THE OUTPUT OF EDDYCURRENT EQUIPMENT AND MANUALLY RECORD THE RESULTS OF SUCH INSPECTIONS. AN INVESTIGATION INTO THE FEASIBILITY OF IMPLEMENTING A DIGITAL SYSTEM WHICH AUTOMATES THIS PROCESSS IS THE OBJECTIVE OF THIS STUDY. THE SYSTEM IS BASED UPON A GENERAL PURPOSE, LOW-COST PERSONAL COMPUTER. IT AUT ...

    SBIR Phase II 1984 National Aeronautics and Space Administration
  7. ADAPTIVE RESOURCE ALLOCATION FOR ADVACED ELINT\ESM SYSTEMS

    SBC: Greenbriar Systems Inc.            Topic: N/A

    THIS PROPOSAL ADDRESSES ELINT\ESM SIGINAL PROCESSING RESEARCH FOR REAL-TIME DETECTION IDENTIFICATION AND LOCATION OF THREAT RADAR EMITTERS ON THE BATTLEFIELD. GIVEN THE PREDICTED FUTURE GROWTH OF PULSE DENSITIES IN THE ELECTRONIC ENVIORNMENT, AND THE PROLIFERATION OF AGILE RADARS, IT IS NECESSARY TO DEVELOP MORE SOPHISTICATED ELINT\ESM SYSTEMS. AN ARCHITECTURE IS PRESENTED FOR A COMPUTER-BASED, AD ...

    SBIR Phase II 1984 Department of DefenseArmy
  8. ENHANCED BI-DIRECTIONAL COMMUNICATION WITH LOW-COST PAYLOADS

    SBC: SPACE PROJECTS, LTD.            Topic: N/A

    EXPERIENCE IN DEVELOPING PAYLOAD CONTROLLERS FOR USE BY SPACE SHUTTLE ORBITER CREWS HAS UNVEILED THE CONTINUING AND GROWING PROBLEMS OF NON-STANDARDIZED PROTOCOL AND THE DISTRESS OF CREWS REQUIRED TO LEARN NEW KEYBOARDS AND OPERATING SYSTEMS WITH "EVERY NEW EXPERIMENT". THE KEY TO SOLVING THIS PROBLEM IS TO DEVELOP A HIGH LEVEL LANGUAGE FAMILIAR TO THE ORBITER CREWS INCLUDING SUCH FEATURES AS: (1) ...

    SBIR Phase II 1984 National Aeronautics and Space Administration
  9. APPLICATION OF PSEUDO-NOISE CORRELATION & BANDWIDTH SYNTHESIS TO ORBIT DETERMINATION

    SBC: Stanford Telecommunications            Topic: N/A

    A TECHNIQUE WHICH COMBINES THE USE OF PSEUDO-NOISE (PN) CODECORRELATION AND MULTILATERATION WITH ANOTHER TECHNIQUE, TERMED "BANDWIDTH SYNTHESIS" (BWS), TO SIGNIFICANTLY ENHANCETHE ACCURACY OF SATELLITE ORBIT DETERMINATION IS THE FOCUS OF THIS PROJECT. FROM A THEORETICAL VIEWPOINT, BWS ALLOWS ONE TO CONSTRUCT A VERY WIDEBAND PN CORRELATION FUNCTION (E.G., REFLECTING MORE THAN 100 MHZ) BY EMPLOYING ...

    SBIR Phase II 1984 National Aeronautics and Space Administration
  10. MODELING AND CONTROL OF LARGE SPACE STRUCTURES

    SBC: SYSTEMS ENGINEERING INC            Topic: N/A

    THIS RESEARCH SHALL FOCUS ON TWO IMPROVEMENTS TO THE CURRENTSTATE OF MODELING AND SHAPE CONTROL OF LARGE SPACE STRUCTURES: (1) THE USE OF FREQUENCY DOMAIN/SPECTRAL FACTORIZATION METHODS FOR THE DEVELOPMENT OF SHAPE CONTROL LAWS: AND (2) THE USE OF ADVANCED METHODS, INCLUDING HOMOGENIZATION, OR THE REDUCTION OF COMPLEXITY OF THE MODELSOF LARGE SPACE STRUCTURES WITH REGULAR LATTICE STRUCTURE. THE AP ...

    SBIR Phase II 1984 Department of DefenseAir Force
US Flag An Official Website of the United States Government