You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Rotary Wing Dynamic Component Structural Life Tracking

    SBC: TECHNICAL DATA ANALYSIS, INC.            Topic: N08006

    United States Navy (USN) program offices have struggled with rotorcraft component history tracking for years, and still spend millions in trying to obtain accurate component history and maintenance information. This is mainly due to records that are kept manually through paperwork systems such as Scheduled Removal Component and Assembly Service Record (SRC and ASR) cards, which are prone to human ...

    SBIR Phase II 2013 Department of DefenseNavy
  2. Material Classification for Physics-Based Sensor Simulation Using Stereo-Pair Imagery

    SBC: JRM ENTERPRISES, INC.            Topic: N092094

    JRM proposes to leverage its Phase I design work to develop Phase II improvements in its material classification algorithms and software, particularly improvements leveraging spatial data available from stereo pair satellite imaging data sources. Specific Phase II innovations: Improved material classification techniques and software for leveraging 3D stereo-pair-derived data; material-prediction a ...

    SBIR Phase II 2013 Department of DefenseNavy
  3. Rugged Automated Training System

    SBC: BARRON ASSOCIATES, INC.            Topic: A11aT019

    Barron Associates, Inc.~proposes to develop the Rugged Automated Training (RAT) system, a cost-effective, rugged, automated environment to train and deploy small animals to detect landmines and other compounds of interest, and to evaluate their performance. The RAT system will train animals to recognize odorants using standard Pavlovian conditioning procedures in specialized, automated operant ch ...

    STTR Phase II 2013 Department of DefenseArmy
  4. Multi-input Multi-output Synthetic Aperture Radar with Collocated Antennas

    SBC: TRIDENT SYSTEMS LLC            Topic: A10aT005

    The enormous effort devoted to the data acquisition, signal processing, and automatic recognition of stationary targets has resulted in a generation of synthetic aperture radar (SAR) systems that are meeting the challenge of real-world conditions. However, in a practical battlefield, moving targets may pose a more severe threat than stationary targets. Many high value targets are only vulnerable w ...

    STTR Phase II 2013 Department of DefenseArmy
  5. Origami Antibodies for Threat Sensing

    SBC: PARABON NANOLABS, INC.            Topic: A11aT021

    Beginning from an advanced stage of development, this Phase II STTR project will produce designs and prototypes for a ricin-specific artificial antibody constructed using DNA origami. These novel constructs will provide both a capture function (mimicking the properties of an antibody) and intrinsic optical reporting functionality, which marks a significant improvement over current antibody capabil ...

    STTR Phase II 2013 Department of DefenseArmy
  6. High Speed Representation of Complex Scenes

    SBC: JRM ENTERPRISES, INC.            Topic: MDA10025

    Leveraging Phase I design and proof-of-concept demonstration software, JRM proposes to develop Phase II prototype simulation software called OSCRE ("On-the-fly Scene Construction and Rendering Engine") to provide FLITES support for large-area, complex backgrounds. This Phase II prototype for FLITES will allow rendering highly complex, large area urban and littoral scene databases directly from GI ...

    SBIR Phase II 2013 Department of DefenseMissile Defense Agency
  7. Cyber Supply Chain Risk Management

    SBC: Power Fingerprinting, Inc            Topic: A11138

    One of the most important aspects in managing the risks in the cyber supply chain is being able to verify the integrity of the different hardware and software modules, as they are vulnerable to cyber attacks at all level of the execution stack and throughout their life cycle. A novel integrity assessment and intrusion detection approach called power fingerprinting (PFP) is capable of extremely acc ...

    SBIR Phase II 2013 Department of DefenseArmy
  8. Body Wearable Radio Direction Finding (DF) Antenna

    SBC: APPLIED SIGNALS INTELLIGENCE, INC.            Topic: A11121

    The ability of soldiers to determine the locations of other personnel within their vicinity based upon line-of-bearing estimates of radio transmissions is of great importance to the army. The relative positions of both friends and foe within the area of operations provides great tactical advantages to the war fighter. By making the antennas more compact, man-wearable, and less conspicuous, we incr ...

    SBIR Phase II 2013 Department of DefenseArmy
  9. Automatic Test and Analysis (ATA) Tool

    SBC: INNOVATIVE DEFENSE TECHNOLOGIES, LLC            Topic: MDA11033

    IDT"s existing Automated Test and Re-Test (ATRT) software tool suite is a disruptive technology used to apply automation to the integration and test of large complex defense systems. ATRT is designed to support requirements analysis, performance analysis, Certification and at-sea operational testing. The ATRT tool suite has two major components: Test Manager and Analysis Manager. The Test Manag ...

    SBIR Phase II 2013 Department of DefenseMissile Defense Agency
  10. Towed Array Fishing Net Entanglement Prevention or Damage Reduction

    SBC: ADAPTIVE METHODS, INC.            Topic: N102155

    Fishing gear continues to become entangled in SURTASS underwater towed array surveillance equipment causing a variety of damage to the arrays and towing equipment. Because of this, the SURTASS Program Executive Office has sought solutions to these entanglements in SBIR solicitation N102-155. In their Phase I proposal Adaptive Methods proposed methods for fishing gear deconfliction to improve the o ...

    SBIR Phase II 2013 Department of DefenseNavy
US Flag An Official Website of the United States Government