You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COMMUNICATIONS FOR DISTRIBUTED AND CONCURRENT PROCESSING ON MICROCOMPUTERS

    SBC: Digital Analysis Corp.            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO DEVELOP THE DESIGN AND APILOT IMPLEMENTATION OF TWO COMMUNICATIONS PACKAGES WHICH WILL SUPPORT DISTRIBUTED COMPUTING FROM A MICROCOMPUTER WORKSTATION BASE. PARTICLULAR EMPHASIS IS GIVEN TO THE PROBLEM OF DIAL-UP ACCESS TO COMMUNICATION NETWORKS IN THE CONTEXT OF DISTRIBUTED DATA BASE MANAGEMENT SYSTEMS. THE FIRST PACKAGE ADDRESSES THE PROBLEM OF SIMULTANEOUSLY R ...

    SBIR Phase II 1987 National Aeronautics and Space Administration
  2. MODULAR DIGITAL HOLOGRAPHIC FRINGE DATA PROCESSING SYSTEM

    SBC: Kms Fusion Inc            Topic: N/A

    THE GOAL OF THIS PROJECT IS TO DEVELOP A GENERAL PURPOSE, MODULAR, HOLOGRAPHIC FRINGE ANALYSIS SYSTEM WHICH WILL BE ABLE TO USE EXPERT KNOWLEDGE TO CONTROL THE PROCESSING OF FRINGE PATTERNS INTO USEFUL ENGINEERING DATA. THE PHASE I OBJECTIVE IS TO DEVELOP THE ARCHITECTURAL DESIGN FOR THIS SYSTEM. SYSTEM MODULARITY AND A WELL DEFINED ARCHITECTURE WILL ALLOW FUNCTIONS TO BE ADDED WITHOUT AFFECTING O ...

    SBIR Phase II 1987 National Aeronautics and Space Administration
  3. INTEGRATED COMPUTER VISION RESEARCH FOR SPACE CONSTRUCTION

    SBC: Machine Vision International            Topic: N/A

    THE PROBLEM OF ROBOT VISION FOR SPACE CONSTRUCTION IS DIFFICULT AND CHALLENGING. THE IMAGES THAT THE ROBOT VISIONSYSTEM MUST DEAL WITH WILL BE DIFFICULT TO SEGMENT INTO MEANINGFUL PIECES AND DIFFICULT TO INTERPRET. THREE IMAGE PROCESSING METHODOLOGIES BEING STUDIED AT MVI INCLUDE MATHEMATICAL MORPHOLOGY, THE FACET MODEL FOR IMAGE DATA, ANDTHE TOPOGRAPHIC PRIMAL SKETCH. THE PROPOSED PROJECT CONSIST ...

    SBIR Phase II 1987 National Aeronautics and Space Administration
  4. THREE-DIMENSIONAL ELECTROPHORESIS CODE

    SBC: Roberts Assoc Inc.            Topic: N/A

    WE PROPOSE TO DEVELOP A FLEXIBLE EFFICIENT COMPUTER CODE TO SIMULATE ELECTROPHORETIC SEPARATION PHENOMENA IN UP TO THREESPATIAL DIMENSIONS. THE CODE WILL ALLOW EITHER A CYLINDRICAL OR A RECTANGULAR GEOMETRY, AND WILL COMPUTE THE TIME EVOLUTION OF THE CONCENTRATIONS OF AN ARBITRARY NUMBER OF CHEMICAL SPECIES, AND OF THE TEMPERATURE. THE PH DISTRIBUTION, CONDUCTIVITY, ELECTRIC FIELD, AND FLUID MOTIO ...

    SBIR Phase II 1987 National Aeronautics and Space Administration
  5. CROSS-CORRELATION OPTICAL STRAIN SENSOR FOR WIND TUNNEL TEST INSTRUMENTATION

    SBC: American Research Corporation of Virginia            Topic: N/A

    AEROSPACE STRUCTURES/MODELS ARE SUBJECTED TO HIGH TEMPERATURES AND STRONG AERODYNAMIC FORCES UNDER CAREFULLY CONTROLLED ENVIRONMENTAL CONDITIONS DURING INSTRUMENTED LABORATORY TESTING. WIND TUNNEL TESTING REQUIRES INSTRUMENTATION WHICH IS RUGGED, RELIABLE, ACCURATE AND PROVIDES TEST DATA QUICKLY TO THE TEST OPERATOR. MEASUREMENTS OF STATIC AND DYNAMIC STRAINS AND PROOF TESTING ON AEROSPACE STRUCTU ...

    SBIR Phase II 1991 National Aeronautics and Space Administration
  6. FLIGHT INSTRUMENTATION FOR SIMULTANEOUS DETECTION OF FLOW SEPARATION & TRANSITION

    SBC: ANALYTICAL SERVICES & MATERIALS INC            Topic: N/A

    A PORTABLE DATA ACQUISITION AND INSTRUMENTATION SYSTEM (DAISY) HAS BEEN DEVELOPED BY AS&M, INC. FOR WIND-TUNNEL TESTS. IT INCORPORATES A UNIQUE AND PATENTED TECHNIQUE TO ACCURATELY IDENTIFY AND DEMARCATE REGIONS OF FLOW SEPARATION, REATTACHMENT, AND THE LEADING-EDGE STAGNATION POINT. SIMULTANEOUSLY, LAMINAR-TO-TURBULENT TRANSITION AND THE SPECTRAL CONTENT OF THE MOST AMPLIFIED DISTURBANCES IN THE ...

    SBIR Phase II 1991 National Aeronautics and Space Administration
  7. FUEL CELL PROPULSION SYSTEM FOR A HIGH ALTITUDE RESEARCH PLATFORM

    SBC: AURORA FLIGHT SCIENCES CORPORATION            Topic: N/A

    THE INNOVATION PROPOSED FOR DEVELOPMENT IS A FUEL-CELL BASED ELECTRIC PROPULSION SYSTEM FOR VERY HIGH-ALTITUDE AIRCRAFT. THIS SYSTEM WOULD POTENTIALLY BE CAPABLE OF REACHING ALTITUDES OF UP TO 40 KM (131,000 FT) WITH A SCIENTIFIC PAYLOAD IN EXCESS OF 450 KG (1000 LBS). IT WOULDBE AN ATTRACTIVE PROPULSION ALTERNATIVE FOR NASA'S PROPOSED HIGH ALTITUDE RESEARCH PLATFORM (HARP) OR OTHER VERY HIGH ALTI ...

    SBIR Phase II 1991 National Aeronautics and Space Administration
  8. FIBER FLUOROMETRY FOR ON-LINE CHEMICAL ANALYSIS OF NUTRIENT SOLUTIONS

    SBC: Biotronics Technologies, Inc.            Topic: N/A

    NUTRIENT SOLUTIONS USED IN HYDROPONIC PLANT GROWING FACILITIES (SUCH AS NASA'S CELSS) SHOULD BENEFIT FROM ON-LINE MEASUREMENT AND CONTROL OF THE IONIC CONCENTRATIONS OF THE NUTRIENTS THAT MAKE UP SUCH SOLUTIONS. BIOTRONICS HAS DEVELOPED AN ON-LINE FIBER-LINKED FLUOROMETRIC ANALYZER POTENTIALLY CAPABLE OF MEASURING THESE IONIC CONCENTRATIONS. THIS FIBER-OPTIC BASED FLUOROMETRIC ANALYZER, DESIGNATED ...

    SBIR Phase II 1991 National Aeronautics and Space Administration
  9. WAVELENGTH DIPLEXED, FIBER COUPLED, COHERENT LASER RADAR MEASUREMENT SYSTEM

    SBC: DIGITAL SIGNAL CORP.            Topic: N/A

    THERE IS A NEED FOR FIBER COUPLED PROXIMITY SENSORS WITH HIGH SPEED AND ACCURACY FOR APPLICATIONS TO ROBOTIC END EFFECTORS AND TO AUTOMATED INSPECTION AND QUALITY CONTROL. THE PROPOSED PHASE I EFFORT WILL DEMONSTRATE A NOVEL, ROBUST, INTEGRATED SENSOR CONCEPT WITH MULTIPLE SENSOR CAPABILITY. FIBER OPTIC SENSORS HAVE BEEN DEMONSTRATED TO HAVE GEOMETRIC FLEXIBILITY. IN THE CASE OF PHASE MODULATED IN ...

    SBIR Phase II 1991 National Aeronautics and Space Administration
  10. DUAL K AND C BAND TRANSPONDER FOR SATELLITE ALTIMETRIC CALIBRATION

    SBC: Interferometrics, Inc.            Topic: N/A

    WE PROPOSE TO INVESTIGATE TECHNIQUES TO MAKE A DUAL FREQUENCY (K-BAND AND C-BAND) TRANSPONDER THAT WILL SIMULATE THE SAME SURFACE REFLECTION OF RANGING PULSES TRANSMITTED FROM THE TOPEX/POSEIDON SPACECRAFT. THUS, THE TRANSPONDER MUST RECEIVE AND TRANSMIT ON THE SAME FREQUENCIES. THEREFORE, IT MUST RECEIVE THE SPACECRAFT TRANSMISSIONS AND DETERMINE THEIR CHARACTERISTICS, IN ORDER TO TRANSMIT REPLIC ...

    SBIR Phase II 1991 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government