List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. A Novel Hydrogen-Fueled Propulsion System

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1994 National Aeronautics and Space Administration
  2. Laser Brazing Process for Joining Refractory Materials to Dissimilar Metals

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase II 1994 National Aeronautics and Space Administration
  3. TECHNOLOGY FOR PRESSURE-INSTRUMENTED THIN AIRFOIL MODELS

    SBC: Applied Cryogenics & Materials            Topic: N/A

    PRESSURE INSTRUMENTED AIRFOIL MODELS FOR TESTING IN CRYOGENIC WIND TUNNELS DEMAND THE SIMULTANEOUS ACHIEVEMENT OF MANY FACTORS INCLUDING STRENGTH, TOUGHNESS, DIMENSIONAL STABILITY, MACHINABILITY, BONDABILITY, ACCURACY OF PROFILE AND SURFACE FINISH. MANY PREVIOUS MODELS HAVE FAILED TO REACH COMPLETION OR HAVE PERFORMED INADEQUATELY BECAUSE ACHIEVEMENT OF SOME FACTORS HAS CRITICALLY COMPROMISED OTHE ...

    SBIR Phase II 1984 National Aeronautics and Space Administration
  4. An Ultrasonic Biocidal System for Hydrophonic Plant Nutrient Solutions

    SBC: Biotronics Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1994 National Aeronautics and Space Administration
  5. Quantifying Confidence in the Correctness of Parallel or Distributed Software

    SBC: Cigital, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1994 National Aeronautics and Space Administration
  6. REFINEMENTS FOR EDDY CURRENT TECHNIQUES

    SBC: Epic Sales, Inc. Dba Epic Systems            Topic: N/A

    EDDY CURRENT FIELD INSPECTIONS ARE PRESENTLY PERFORMED BY TECHNICIANS WHO MUST EXAMINE AND EVALUATE THE OUTPUT OF EDDYCURRENT EQUIPMENT AND MANUALLY RECORD THE RESULTS OF SUCH INSPECTIONS. AN INVESTIGATION INTO THE FEASIBILITY OF IMPLEMENTING A DIGITAL SYSTEM WHICH AUTOMATES THIS PROCESSS IS THE OBJECTIVE OF THIS STUDY. THE SYSTEM IS BASED UPON A GENERAL PURPOSE, LOW-COST PERSONAL COMPUTER. IT AUT ...

    SBIR Phase II 1984 National Aeronautics and Space Administration
  7. Advanced, Diode-Pumped, Cavity-Dumped Laser for Space-Based Altimetry

    SBC: FIBERTEK, INC.            Topic: N/A

    N/A

    SBIR Phase II 1994 National Aeronautics and Space Administration
  8. Unobtrusive Sensor and Effector Technology with Optical Applications

    SBC: Garman Systems Inc.            Topic: N/A

    N/A

    SBIR Phase II 1994 National Aeronautics and Space Administration
  9. Transition Prediction and Laminar Flow Control in Compressible 3D Boundary Layers Using PSE

    SBC: High Technology Corporation            Topic: N/A

    N/A

    SBIR Phase II 1994 National Aeronautics and Space Administration
  10. OPTIMIZATION OF LARGE STRUCTURES IN A MASSIVELY PARALLEL ENVIRONMENT

    SBC: Mrj Inc.            Topic: N/A

    THIS PROJECT WILL PROVIDE AN INNOVATIVE APPROACH TO DESIGN PROBLEMS IN STRUCTURAL ANALYSIS THROUGH THE EFFICIENT USE OF THE CONNECTION MACHINE AND THROUGH NEW OPTIMIZATION TECHNIQUES FOR SIMD ARCHITECTURES. PROJECT OBJECTIVES WILL BE TO DEVELOP A SUPER-EFFICIENT, GENERAL-PURPOSE, ANALYTICAL/COMPUTATIONAL TOOL (COMPUTER CODE) ON THE MASSIVELY PARALLEL CM-2 COMPUTER SYSTEM. THIS TOOL CAN BE USED FOR ...

    SBIR Phase II 1994 National Aeronautics and Space Administration

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government